The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page25/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   21   22   23   24   25   26   27   28   ...   82

1.12Site 12




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

12




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey

22/02/11

1

Name of dumpsite

Binagadi, near temporary storage, at the side of the car road

2

Coordinates

40 27 57,2

49 50 52,2



3

Settlements which use the dumpsite

Binagadi settlements

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Binagadi

5

General description of the situation in the dumpsite

Domestic waste and bulky paper boxes, withwater and gas pipes via the dumpsite

6

Total years of operation of the dumpsite

3

7

Date of initiation

2008

8

Date of closure

Still operating

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

20m x 40m = 800 m2

11

Type of waste disposed (define with percentages)

85% household , 15% construction and demolition waste and debris (M)

12

Municipal waste, wastewater treatment sludge, sewage water

Yes, no, yes

13

Inert and bulky

No

14

Green and agricultural

No

15

Medical waste, toxic waste, slaughter house waste

No

16

Other (describe)

Carton boxes predominate

17

Total volume (m3)

0,3 m x 800 m2 = 240 m3

18

Total quantity (tn)

80 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Dispersion

20

Quantity of gas generated

Low gas leakage from the pipes

21

Bedrock (main formation)

Sand with silt and rare intercalations of clays (Middle Pliocene), productive aquifer

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Intercity flat area

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

-

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

< 2 m

26

Site Distance from:

S

27

Settlements, schools, working places

Next to residences and working places , 400 m from school

28

Stream with permanent flow

No

29

Forest

No

30

Agricultural activities, pastures

No

31

Wells / boreholes

No

32

Sea shore

Very far 10.5 km

33

Other (describe)




34

Existing infrastructure

Town infrastructure , road,gas petrol and water pipes , electricity pylons

35

Fencing

Barbed wire only along the pipes

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

Water and gas leakage from pipes

40

Nuisances and Hazards

Yes

41

Odors and dust

Yes

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

Yes

44

Fires

Possible due to gas pipe

45

Rainfall values (<100mm, 100-200mm, >200mm)

100-250 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 10 years

48

Use of the receptor (no use, irrigation, drinking-recreation)

Aquifer with no use

49

Sensitivity of the receptor (low, medium, high)

High

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

High impacts

51

Other information

Danger to public health. Immediate closure recommended.



Photograph 12: Site 12



Download 4.64 Mb.

Share with your friends:
1   ...   21   22   23   24   25   26   27   28   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page