Unit assessment pack (uap)


Assessment Task 2 - Unit Project (UP)



Download 199.66 Kb.
Page25/40
Date18.05.2021
Size199.66 Kb.
#56667
1   ...   21   22   23   24   25   26   27   28   ...   40
Unit Assessment Pack ICTICT502 -Unit Assessment Pack V1.2 June 2020

Assessment Task 2 - Unit Project (UP)


Instructions to complete this assessment task:

  • This assessment task requires you to read the scenario and perform the following activities to analyse requirements of the project specifications in order to produce a set of high-level component specifications.

  • This assessment task requires you to identify and document high level component specifications relevant to the project specifications

  • You must carefully document and review component modelling.

  • You must Iterate and review model

  • This assessment task requires you to assume/ take on the role of the IT Manager for Design Excellence.

  • You must carefully analyse the case study scenario provided to attempt these activities.

  • You must follow organisational policies and procedures and security plan when attempting these activities.

  • You must document their responses in the provided template.

  • You must write their responses within the given word limit. Trainer/assessor will assess your performance as per the performance criteria and checklist provided.

  • You may attach additional pages.

  • You must include the following in the footer section of each page of the attached sheets:

  • You must staple the loose sheets together along with the cover page.

  • You must attach the loose sheets chronologically as per the page numbers.

  • Correction fluid and tape are not permitted. Please do any corrections by striking through the incorrect words with one or two lines and rewriting the correct words.

  • The premise of the project must be closely related to the previous assessment task.

  • This submission must be well presented and follow the guidelines and instructions provided.

  • Please follow the format as indicated in the template section below.

  • One of the most important steps that you can take: proofread your project.

  • Appropriate citations are required.

  • All RTO policies are in effect, including the plagiarism policy.

Resources required to complete the assessment task:



  • Computer

  • Internet

  • MS Word

  • Printer or e-printer

  • technical specifications

  • organisational and process goals

  • standards for model development

  • computer aided software engineering (CASE) tools

  • project deliverables

  • test plan

  • project budget

  • outcomes of the business analysis process

  • appropriate software and hardware.


Project Task:

In this assessment task, you are required to read the scenario and perform the following activities to analyse requirements of the project specifications in order to produce a set of high-level component specifications.



  • Identify and document high level component specifications relevant to the project specifications

  • Analyse and document component connectivity and relationships

  • Document and review component modelling.

  • Iterate and review model



Download 199.66 Kb.

Share with your friends:
1   ...   21   22   23   24   25   26   27   28   ...   40




The database is protected by copyright ©ininet.org 2024
send message

    Main page