Vision Iowa, cat & recat projects by County As of June 2016



Download 0.88 Mb.
Page6/10
Date11.02.2018
Size0.88 Mb.
#41012
1   2   3   4   5   6   7   8   9   10

Date of Award: 11/10/2004

Total Project Cost: $1,489,251

Amount Requested: $551,130

Amount Awarded: $300,000

Project Description: The project involves the completion of the third and final phase of development of the Boone River Recreational Trail. This phase will construct 2.5 miles of concrete, a 10-foot-wide trail and will include a 210-foot bridge that crosses the Boone River into Briggs Woods Park.
Applicant: City of Webster City

Project Name: Webster City Skate Park

City: Webster City (Population 8,176)

Date of Award: 5/8/2002

Total Project Cost: $28,358

Amount Requested: $14,000

Amount Awarded: $13,000

Project Description: This project includes the construction of a skate park, which will be located at an existing city park in Webster City. Construction includes a concrete pad and skate equipment.


Hancock

Applicant: City of Garner

Project Name: Garner Public Library Renovation and Expansion Project

Date of Award: 1/13/2016

City: Garner (Population 3,129)

Total Project Cost: $1,556,500

Requested Funding: $310,000

Amount Awarded: $310,000

Project Description: This project includes the renovation of the interior and exterior of the current library building as well as a 1,834-square-foot addition to the south and east sides of the building. Renovations includes installing energy efficient lighting, a drive-up book drop, multi-media and video conferencing equipment; remodeled staff areas, bathrooms and meeting rooms; expanded community kitchenette and opening up the floor plan of the main library area.
Applicant: Avery Theater

Project Name: Avery Theater

City: Garner (Population 3,129)

Date of Award: 4/10/2013

Total Project Cost: $251,000

Amount Requested: $48,912

Amount Awarded: $45,000

Project Description: This project includes the total rehabilitation of the existing building into a 225-seat theater.


Applicant: City of Garner

Project Name: Veterans Memorial Recreation Center

City: Garner (Population 2,922)

Date of Award: 6/11/2008

Total Project Cost: $3,855,744

Amount Requested: $770,099

Amount Awarded: $670,000

Project Description: This new approximately 22,000-square-foot building will include a large gymnasium, elevated walking/running track, multi-purpose activity room, fitness/weights area, locker rooms, veterans’ area and offices. The Veterans of Foreign Wars and American Legion will provide displays and utilize the meeting space.


Applicant: City of Britt

Project Name: Britt Municipal Aquatic Center

City: Britt (Population 2,052)

Date of Award: 10/11/2006

Total Project Cost: $2,200,000

Amount Requested: $125,000

Amount Awarded: $100,000

Project Description: The City of Britt is proposing to construct a new 5,032 square foot aquatic center complete with many amenities such as zero depth entry, floor geysers, diving board, single flume slide, lap lanes, Eagle children’s slide and a raindrop feature. Other amenities will include a bathhouse, food court, umbrellas, and a park shelter. CAT funds were awarded specifically to purchase and install the open flume water slide.


Applicant: City of Garner

Project Name: Garner Municipal Aquatic Center

City: Garner (Population 2,922)

Date of Award: 2/8/2006

Total Project Cost: $2,913,000

Amount Requested: $100,000

Amount Awarded: $100,000

Project Description: This project involves the construction of a new aquatic center to replace an outdated facility that has far exceeded its 40 year life expectancy. The new aquatic center will consist of an 8,835 square foot swimming pool including amenities such as zero depth entry, several water spray units, toddler slide, shaded in-pool seating, play structure, therapeutic jet seating, lap lanes, tube slide, flume slide, concession stand, and bathhouse.


Hardin


Applicant: Scenic City Empress Boat Club

Project Name: Scenic City Empress Boat Club Building Renovation - RECAT

City: Iowa Falls (Population 5,193 )

Date of Award: 10/13/2010

Total Project Cost: $250,000

Amount Requested: $83,000

Amount Awarded: $58,000

Project Description: This project includes the major renovation of the 1937 two-story, 2000-square-foot log lodge on the Iowa River. Specific project components consist of replacing the foundation; repairing the deteriorating lower level; and improving the structural design including energy efficiency and green building practices.


Applicant: City of Hubbard

Project Name: Hubbard Public Library

City: Hubbard (Population 885)

Date of Award: 7/14/2010

Total Project Cost: $1,444,890

Amount Requested: $349,061

Amount Awarded: $325,000

Project Description: This project includes the construction of a new 7,080-square-foot public library in downtown Hubbard.


Applicant: Iowa Valley Community College District and Ellsworth Community College

Project Name: EQUINE CENTER Agricultural and Renewable Energy Center

City: Iowa Falls (Population 5,193)

Date of Award: 10/10/2007

Total Project Cost: $3,380,400

Amount Requested: $731,600

Amount Awarded: $475,000

Project Description: This project will offer a state-of-the-art arena with seating for 350 people; additional bleacher seating and announcers box for hosting contests, rodeos, clinics and expositions. The Equine Center will also offer boarding stalls, large animal labs, washroom, tack room, changing area, vending area, and restrooms.


Applicant: Hardin County Agricultural Society

Project Name: Hardin County Fair Grandstands Seating Project

City: Eldora (Population 3,035)

Date of Award: 2/14/2007

Total Project Cost: $95,000

Amount Requested: $28,990

Amount Awarded: $24,000

Project Description: This project includes the repair of the flooring and seating in the existing amphitheatre.


Applicant: City of Eldora

Project Name: Aquatic Center

City: Eldora (Population 3,035)

Date of Award: 8/10/2005

Total Project Cost: $2,084,600

Amount Requested: $127,267

Amount Awarded: $100,000

Project Description: The City of Eldora plans to construct a new aquatic center, which will replace the City’s existing pool. Plans for the new facility include a zero-depth entry area, diving area, lap swimming area, basketball goal, concession area, a grass deck area and play features.


Applicant: City of Eldora

Project Name: Grand Theatre New Auditorium Seating

City: Eldora (Population 3,035)

Date of Award: 5/11/2005

Total Project Cost: $34,000

Amount Requested: $13,500

Amount Awarded: $11,500

Project Description: This project involves removing the old theater seats, sealing/ repairing the floor, and installing 205 new theater seats.


Applicant: City of Iowa Falls

Project Name: Iowa Falls Carnegie-Ellsworth Library Renovation and Retrofit

City: Iowa Falls (Population 5,193)

Date of Award: 2/13/2002

Total Project Cost: $881,653

Amount Requested: $305,134

Amount Awarded: $150,000

Project Description: The state’s investment will assist the city of Iowa Falls’ plan to refurbish the historic Carnegie Ellsworth Library. The building will eventually serve as a visitor center and will house the offices of the Iowa Falls Development Corporation, the Iowa Falls Chamber of Commerce and Iowa Falls Main Street. A special exhibit of Bill Riley memorabilia and the Pat Clark Art Collection will also be on display at the library.


Harrison

Applicant: City of Logan

Project Name: Jim Wood Aquatic Center

City: Logan (Population 1,545)

Date of Award: 5/14/2008

Total Project Cost: $2,130,000

Amount Requested: $100,000

Amount Awarded: $100,000

Project Description: This project includes the construction of a 5,025-sq. ft. aquatic facility with zero depth entry, large spiral slide, six swimming lanes, shade umbrellas and bathhouse.
Applicant: City of Missouri Valley

Project Name: Watson Steam Train Restoration and Station/Museum

City: Missouri Valley (Population 2,992)

Date of Award: 3/12/2008

Total Project Cost: $587,932

Amount Requested: $279,391

Amount Awarded: $225,000

Project Description: This project will include the complete restoration of the 1948 miniature Ottaway Steam Train for the riding enjoyments of local and visiting children. In addition, a 3,400 square foot station/museum will be constructed in the Missouri Valley City Park. The building will store and display the 1948 Ottaway steam train, plus two miniature pump cars and a second antique train. The display will include a large, functioning train village, and numerous museum quality items.


Applicant: City of Dunlap

Project Name: Boyer Valley Youth Athletic Complex

City: Dunlap (Population 1,139)

Date of Award: 5/11/2005

Total Project Cost: $540,332

Amount Requested: $269,000

Amount Awarded: $220,000

Project Description: This recreation park will include a softball field, a baseball field, two soccer fields, a walking path, a bike path, exercise stations, parking, picnic area, an arboretum, two grand stands, restrooms, concessions stands, fencing, lighting, and a utility shed. A water well will also be located on this site to service the fire hydrants, restrooms, and irrigation system.


Henry

Applicant: Salem Crew Library Building Trust Fund Committee

Project Name: Salem Crew Public Library Building Project

City: Salem (Population 464)

Date of Award: 9/10/2008

Total Project Cost: $834,000

Amount Requested: $250,000

Amount Awarded: $250,000

Project Description: This project includes the construction of a new 4,280-square-foot library. The library will include a children’s library, adult reading space, activity room, computer stations, genealogy area and archiving of one-room school house history in southeast Iowa. Also included will be healthcare, tourism and early childhood education information areas.
Applicant: City of Wayland & WACO Community School District

Project Name: All Weather Walking/Running Facility

City: Wayland (Population 945)

Date of Award: 8/9/2006

Total Project Cost: $290,655

Amount Requested: $100,000

Amount Awarded: $80,000

Project Description: The All Weather Outdoor Walking/Running Facility that is being developed will be the complete re-landscaping and construction of an all weather track that will provide health activities for the community and athletic activities for the local High School.


Applicant: Midwest Old Threshers

Project Name: Food Service Building Project

City: Mt. Pleasant (Population 8,751)

Date of Award: 5/11/2005

Total Project Cost: $498,781

Amount Requested: $125,000

Amount Awarded: $100,000

Project Description: This project includes construction of a new Food Service Building at the Old Threshers Reunion site in Mt. Pleasant. This facility would include a 22,500 square foot building and 50’x 60’ dining area. The building will include 5 separate kitchen areas that will be able to serve numerous food providers.


Applicant: City of Mt. Pleasant

Project Name: Mt. Pleasant Library / Community Center

City: Mt. Pleasant (Population 8,751)

Date of Award: 10/9/2002

Total Project Cost: $8,064,047

Amount Requested: $1,850,000

Amount Awarded: $1,000,000

Project Description: The Mount Pleasant Library and Community Center will utilize the former Mount Pleasant Community High School building to create a new public library and community center. Major components of the facility include a 30,000-squre-foot library and a refurbished auditorium. Plans also call for the development of rental office space and public coffee bar.


Applicant: Midwest Old Threshers

Project Name: Carousel Pavilion and Events Facility

City: Mt. Pleasant (Population 8,751)

Date of Award: 3/6/2001

Total Project Cost: $551,837

Amount Requested: $150,000

Amount Awarded: $120,000

Project Description: The state funds will offset a portion of the costs incurred by constructing an enclosed pavilion to house an 1894 steam-powered carousel. The carousel, which was purchased in 1994, is currently available to the public only during the Midwest Old Threshers event. The pavilion will give the public increased access to the carousel.


Howard

Applicant: City of Elma

Project Name: Elma Memorial Hall and Trail Head/Welcome Center

City: Elma (Population 598)

Date of Award: 9/8/2010

Total Project Cost: $487,825

Amount Requested: $143,825

Amount Awarded: $140,000

Project Description: This project includes the expansion and renovation of the existing Memorial Hall. Specific changes include a new kitchen, reconstructing the existing toilet facilities into a storage room, new HVAC units, remodeling of Legion Hall, new exterior covered patio, and thermal protection updates. This project also includes the renovation of the former railroad depot into a welcome center and trail head.
Applicant: Howard County Agricultural Society

Project Name: Howard County Historical Preservation & Education Center

City: Cresco (Population 3,905)

Date of Award: 3/9/2005

Total Project Cost: $394,641

Amount Requested: $142,500

Amount Awarded: $75,000

Project Description: The Howard County Historical Preservation and Education Center will be a 15,000-square-foot pre-engineered steel building, divided into four areas. The largest area of the Center, 10,500-square-feet, will be devoted to the display of large artifacts relating to the agricultural, industrial and community life of Howard County. Another area, 3,500-square-feet, will serve as the Education Center of the facility and will be able to host workshops and seminars relating to the history of Howard County. The third area, 1,500-square-feet will be used for the display of smaller historical items and collections, such as photographs, coins, books, clothing, old records and the like. Special display cases will be used to ensure the artifacts are safe and protected for outside elements. This area of the Center will be climate controlled, and serve as the formal office and main entry into the Center. The fourth area of the Center will serve as the administrative offices for the Agricultural Society and also as the office of the Mighty Howard County Fair.


Humboldt

Applicant: City of Humboldt

Project Name: Humboldt Family Aquatic Center

City: Humboldt (Population 4,452)

Date of Award: 8/11/2004

Total Project Cost: $3,295,802

Amount Requested: $240,000

Amount Awarded: $93,000

Project Description: This project includes demolition of the existing pool and construction of the new aquatic center that will include zero-depth entry, a diving area, swimming lanes, concession area, waterslides, and a bathhouse.

Ida


Applicant: City of Holstein & Galva Holstein Community School District

Project Name: Galva Holstein Performing Arts Center

City: Holstein (Population 1,470)

Date of Award: 6/10/2009

Total Project Cost: $2,358,854

Amount Requested: $361,954

Amount Awarded: $350,000

Project Description: This project includes the construction of a 400-seat performing arts center that will be directly connected to the Galva Holstein High School building. The facility will have two levels totaling approximately 12,000 square feet, dressing rooms with multiple make up stations, rest rooms with a shower, a green room, prop and storage areas, and meeting and potential classroom space.


Applicant: City of Ida Grove

Project Name: Ida Grove Community / Recreational Center

City: Ida Grove (Population 2,350)

Date of Award: 8/14/2002

Total Project Cost: $900,000

Amount Requested: $210,000

Amount Awarded: $165,000

Project Description: This project is a 19,000-square-foot facility that includes a community room, kitchen, basketball/volleyball court and senior card/internet center.


Iowa
Applicant: Williamsburg Public Library

Project Name: Williamsburg Public Library Project

City: Williamsburg (Population 2,622)

Date of Award: 7/8/2009

Total Project Cost: $4,069,489

Amount Requested: $630,000

Amount Awarded: $600,000

Project Description: This project includes the construction of a new public library on land purchased by the city located on the northwest corner of the downtown square.


Applicant: Friends of Iowa County Conservation and Iowa County Conservation Board

Project Name: Lake Iowa Nature Center Project

City: Ladora (Population 287)

Date of Award: 2/11/2009

Total Project Cost: $1,107,166

Amount Requested: $428,166

Amount Awarded: $428,000

Project Description: This project includes the construction of the 7,000-square-foot Lake Iowa nature center. The main floor will contain an interactive and interchangeable display area, a meeting space, office space and ADA compliant restrooms. The upper floor will have additional display areas, the children’s corner and storage space. The lower floor will contain a large classroom, field lab, severe weather shelter, and restrooms with showers.


This project will also include the construction of outdoor teaching spaces; wetland septic system interpretation trail; an amphitheatre; historical forest; wildflower beds; oak-savanna habitat restoration and wildlife feeding stations. Additional trail extensions will be made to the pond and children’s animal homes trail.
Applicant: City of Marengo

Project Name: Marengo Downtown Revitalization – Streetscape Phase I

City: Marengo (Population 2,535)

Date of Award: 2/13/2008

Total Project Cost: $1,588,000

Amount Requested: $342,000

Amount Awarded: $240,000

Project Description: This project will include the following improvements over a three block area: new sidewalks that will incorporate decorative concrete and/or pavers; trash receptacles, benches, and decorative planters; decorative lighting; an underground electrical system; utilization of reclaimed bricks in crosswalks or sidewalks; landscaping such as bump outs and perennial plantings; ADA updates to make the downtown handicapped accessible; other utility updates; and park improvements including new playground equipment.


Applicant: Iowa County

Project Name: Historic Amana Main Street - Phase III

City: Amana (not an incorporated city)

Date of Award: 3/8/2006

Total Project Cost: $1,699,620

Amount Requested: $488,000

Amount Awarded: $244,000

Project Description: The project consists of a restored historic streetscape, ADA compliant sidewalks and pedestrian routes, a bike trail, as well as improved drainage and vehicular traffic circulation.


Applicant: Friends of the Marengo Public Library

Project Name: Marengo (Carnegie) Public Library Renovation/Expansion

City: Marengo (Population 2,535)

Date of Award: 8/11/2004

Total Project Cost: $2,140,208

Amount Requested: $600,000

Amount Awarded: $400,000

Project Description: The Marengo (Carnegie) Public Library renovation/expansion project will enhance the lives of city residents, those in surrounding rural areas, returning alumni and visitors by offering an updated and enlarged facility. The new/enhanced facility will become handicapped accessible and will include a children’s area, an adult area, technology room, genealogy work and research room, community room with kitchenette, modern restrooms and children’s programming space.


Applicant: Amana Colonies Historical Sites Foundation

Project Name: Historic Amana Revitalization

City: Amana (not an incorporated city)

Date of Award: 10/8/2003

Total Project Cost: $1,200,000

Amount Requested: $500,000

Amount Awarded: $500,000

Project Description: Phase I of the Historic Amana Revitalization project includes land acquisition, renovation of the corn crib, renovation of the granary, construction of a new roof for the Festhalle barn, stabilization of the Festhalle barn, utility connections, parking and landscaping.


Jackson


Applicant: City of Bellevue

Project Name: Walkways for Life

City: Bellevue (Population 2,350)

Date of Award: 8/8/2007

Total Project Cost: $426,725

Amount Requested: $188,568

Amount Awarded: $130,000

Project Description: This project includes two components. The first component is to upgrade the pedestrian transportation system in the commercial area of the City. This project is intended to correct the safety and access issues while also presenting a finished décor that maintains the historical ambience of the area. The upgrade will include rehabilitating the sidewalks in the downtown, improve the landscaping, and installing period streetlights and receptacles on each block. The second component of this project is the construction of a half mile paved trail to run parallel to scenic Mill Creek.


Applicant: City of Maquoketa

Project Name: Area Recreational Center, The ARC

City: Maquoketa (Population 6,112)

Date of Award: 4/13/2005

Total Project Cost: $4,493,403

Amount Requested: $900,000

Amount Awarded: $825,000

Project Description: The Area Recreation Center will be a 36,000-square foot facility, which will include an indoor swimming pool an outdoor mist plaza, a gymnasium and jogging / walking track, an exercise / aerobic room, a weight room, and a lobby / reception area.


Applicant: Maquoketa Fine Arts Center, Inc.

Project Name: Maquoketa Fine Arts Center

City: Maquoketa (Population 6,112)

Date of Award: 8/8/2001

Total Project Cost: $2,463,125

Amount Requested: $393,649

Amount Awarded: $143,649

Project Description: The Maquoketa Fine Arts Center will include a 700-seat auditorium, large reception hall and art display area.


Jasper

Applicant: Lynnville-Sully Community School District

Project Name: Diamond Trail Fitness Center

City: Sully (Population 904)

Date of Award: 4/13/2005

Total Project Cost: $574,315

Amount Requested: $140,000

Amount Awarded: $100,000

Project Description: This project involves the construction of a new recreation and fitness center. The building will include free weights area, aerobics area, therapy room, an area for aerobic equipment and office space. The facility will contain state of the art aerobic and training equipment and computer kiosks which will provide information on health and fitness.
Jefferson

Applicant: City of Fairfield

Project Name: Community Recreation Project

City: Fairfield (Population 9,464)

Date of Award: 8/13/2014

Total Project Cost: $8,046,414

Amount Requested: $1,040,000

Amount Awarded: $1,000,000

Project Description: This project includes the construction of an outdoor aquatic center and multipurpose gymnasium. The aquatic center will include a zero-depth entry pool, mechanical building, waterslides, interactive play system, shade structures and diving tower. The gymnasium will include multipurpose courts, multiuse track, storage area, check-in area and restrooms.
Applicant: Jefferson County Civic Center, Inc.



Download 0.88 Mb.

Share with your friends:
1   2   3   4   5   6   7   8   9   10




The database is protected by copyright ©ininet.org 2024
send message

    Main page