A – General Details



Download 1.41 Mb.
Page6/6
Date28.05.2018
Size1.41 Mb.
#51567
1   2   3   4   5   6

Parking:


DRIVING

The SatNav postcode for MediaCityUK is: M50 2EQ.

Salford Quays is less than 4 miles from Manchester City Centre.

From Manchester City Centre - The main approach is via Mancunian Way (A57)

Continue along to Regents Road (A57)

Take the first turning at the large roundabout onto Trafford Road

(A5063) and then the first right turning onto Broadway

MediaCityUK is just past the Pie Factory
PARKING

For loading/Rigging please liaise with Rob Lawson, Turnaround Manager Studio – 07407 731 068








Welfare:


Toilets: There are toilets on every floor, except the 3rd floor. Nearest toilets to studio are located just outside the studio doors. For disabled toilets, please use general facilities in the building.
Food & Drink: Crew and production to provide own lunch; there are various options available:

Costa Coffee, Ground Floor next to Bridge House. Pokusevskis on The Mezzanine and next door to Costa. Penelopes in the Open Centre of Studio and at the Pie Factory, Lowry Shopping Centre Food Hall (Burger King, Subway, Fat Jacks, Harry Ramsdens etc). Free fresh water is available, tap water is drinkable in Studio.


Smoking: is not allowed in any building. If you wish to smoke please do so outside, away from windows and doors. The designated smoking area at MediaCity is at the side of Quay House and the canal side of Bridge House, front entrances should be avoided.
Cash Machines: The nearest cash machines are in the main hall of The Studio block or Booths.

Client – Out of hours





Design Changes


Production Designer


BBC Safety


, Safety Adviser


F – Other Considerations

Studio Plan available from



Designers Drawings available from
A hard copy of all Risk Assessments and Method Statements will be kept in the Green Room off HQ3 Studio Floor.


Use of the form

This document is a simple planning document and will be shared with the contractors and designers and any other crew members who are involved in the construction work.

For small straightforward tasks, contractors should in turn have risk assessments /method statements / safe systems of work in place to allow the work to be undertaken safely.


Download 1.41 Mb.

Share with your friends:
1   2   3   4   5   6




The database is protected by copyright ©ininet.org 2024
send message

    Main page