Acac cns/atm study Update & Strategic Planning Supplemental Data Collection Questionnaire Project Manager



Download 2.67 Mb.
Page19/26
Date02.02.2017
Size2.67 Mb.
#15945
1   ...   15   16   17   18   19   20   21   22   ...   26

11FIR Navigation (NV):


Please provide the following FIR Navigation information:

SAMPLE: (NV-1): Identify your facility’s CURRENT and FUTURE navigation systems and capabilities. Please use the facility type abbreviations listed below when responding. Indicate your response with an “X”.

AC = Area Control Center

AP = Approach Control Facility

AD = Aerodrome Facility


Navigation – Sample

Table : NV-1, Sample Navigation Specifications

Type of Navigation

Current

2020

2025

2030

FACILITY Type:

AC

AP

AD

AC

AP

AD

AC

AP

AD

AC

AP

AD

Navigation Type

VOR

X

X




X

X




X

X




X

X




DME




X







X







X







X




RNAV 5










X







X







X







RNP APCH






















X







X




ILS/DME







X







X







X







X

(NV-1): Identify your facility’s CURRENT and FUTURE navigation systems and capabilities. Please use the facility type abbreviations listed below when responding. Indicate your response with an “X”.

AC = Area Control Center

AP = Approach Control Facility

AD = Aerodrome Facility
Insert Response Here:

Table : NV-1, Navigation System Identification




Type of Navigation

Current

2020

2025

2030

FACILITY Type:

AC

AP

AD

AC

AP

AD

AC

AP

AD

AC

AP

AD

Navigation Type

VOR





































DME





































TACAN





































VORTAC





































NDB





































LOC/DME





































ILS/DME





































Marker Beacons





































GBAS-GLS (Ground-Based Augmentation System Landing System)





































PAR (Precision Approach Radar)





































MLS (Microwave Landing System)





































RNAV-10





































RNAV-5





































RNAV-2





































RNAV-1





































RNP-4





































RNP-2





































RNP-1





































RNP APCH





































RNP AR APCH





































RNP .03





































Other (Specify)





































Other (Specify)





































Other (Specify)






































(NV-1-1): Additional comments, as appropriate.

Insert Response Here:

(NV-2): Does this FIR have a strategic plan to implement Global Navigation Satellite System (GNSS) capabilities? If Yes, please provide a copy of that plan.

Insert Response Here: or Submit Document Via FTP Site:

(NV-2-1): If No, identify the constraints that are restricting planning/implementation of GNSS capabilities.

Insert Response Here:



Download 2.67 Mb.

Share with your friends:
1   ...   15   16   17   18   19   20   21   22   ...   26




The database is protected by copyright ©ininet.org 2024
send message

    Main page