Installation & Operation Manual



Download 1.82 Mb.
Page6/17
Date05.05.2018
Size1.82 Mb.
#48249
1   2   3   4   5   6   7   8   9   ...   17

STEP 1
Wire Phoenix Terminal Block to end of cable run from FS-03 microphone input and plug into connection module.





STEP 2
Drill ½” hole in the tile at desired location. Push microphone barrel, with attached 18” cable and mini XLR connector up through ½” hole in tile until lip stops against tile. Secure on top of tile with friction clip.



STEP 3
Plug mini XLR connector at end of 18” cable into male jack on connection module. Rest connection module on top of tile.



Directory: wp-content -> uploads -> 2017
2017 -> Leadership ohio
2017 -> Ascension Lutheran Church Counter’s Schedule January to December 2017
2017 -> Board of directors juanita Gibbons-Delaney, mha, rn president 390 Stone Castle Pass Atlanta, ga 30331
2017 -> Military History Anniversaries 16 thru 31 January Events in History over the next 15 day period that had U. S. military involvement or impacted in some way on U. S military operations or American interests
2017 -> The Or Shalom Cemetery Community Teaching on related issues of Integral
2017 -> Ford onthult samenwerking met Amazon Alexa en introduceert nieuwe navigatiemogelijkheden van Ford sync® 3 met Applink
2017 -> Start Learn and Increase gk. Question (1) Name the term used for talking on internet with the help of text messege?
2017 -> Press release from 24. 03. 2017 From a Charleston Car to a Mafia Sedan
2017 -> Tage Participants
2017 -> Citi Chicago Debate Championship Varsity and jv previews

Download 1.82 Mb.

Share with your friends:
1   2   3   4   5   6   7   8   9   ...   17




The database is protected by copyright ©ininet.org 2024
send message

    Main page