Risk assessment form



Download 1.07 Mb.
Page1/2
Date24.03.2021
Size1.07 Mb.
#56166
  1   2
TRA-Installation of Field Instruments
ADNOC Toolbox Talk Awareness Material 2020, ADNOC Toolbox Talk Awareness Material 2020, OILGAS, Road Maintenance Plan & Status-Map Format




System Title

Page of


Document No.

ADM-FRM-005-1

INTEGRATED HEALTH, Safety and Environment Standard Procedures

Procedure Title

Effective Date

15 July 2019

HSE Risk MAnagement

Revision / Date

1 / 15 July 2019




HSE RISK ASSESSMENT FORM




Risk Assessment Type

New Review

Date of Issue




Company

Al Nasr Contracting

Division/Department

HSE Department

Describe Activity and Location

Installation of Field Instruments - Design and Construction of KIZAD Gas Network- Phase-1 Abu Dhabi.

Prepared by

Name

Imran Khan

Designation

HSE Lead

Date and Signature




Approved by

Name

Tijo Sebastian

Designation

Construction Manager

Date and Signature




Ports HSE Department Approval

Name




Designation




Date and Signature






SLN.

Hazard Title

Hazard Detail

Causes

Consequences

Existing Legal Requirements

Legal Compliance

Risk Assessment

Existing Controls

Additional Controls Proposed

Residual Risk Assessment




Y

N

P

A

E

R

RI

P

A

E

R

RI




Activity: Mobilization of People, Vehicles, Materials and Equipment to site

1




  • Physical hazard.




  • Vehicle & Equipment Movement




  • Poor condition of Vehicle & Equipment




  • Possible presents of reptiles.






  • Personnel entering vehicle movement area

  • Struck by machinery.

  • Over speeding.

  • Incompetent drivers/ workers/Operators.

  • Vehicle Mechanical Failure







  • Personnel injury

  • Damage to assets




  • COP:44 Traffic Management and Logistics,




  • OSHAD – SF Cop 33.0

– working on of adjacent to a road.

Y

-

3C

2A

2A

3B


Medium

  • Ensure AD Ports Permit along with Al Nasr internal permit and TBT available at site.

  • AD Ports Permit is valid within the specified work location only.

  • Equipment used should be zone 2/ intrinsically safe and continuous gas monitoring (As per area requirement).

  • All equipment’s should have valid third-party certificate.

  • All drivers must be holders of valid UAE driving license.




  • Certified First Aider shall be mobilized along with manpower

  • Emergency procedures to be

Cascaded.

  • Stay away from line of fire

  • All vehicles and equipment’s should have inspection and approval from the clients (As per area requirement).

  • Equipment movement without certified banks man is strictly prohibited at site.

  • If found any species reports to concerned authorities.

  • Do not kill /attack the endangered species.

  • Always maintain High supervision

  • Use only approved tracks/ route.

  • Vehicle to be parked in designed areas only

  • Wear PPEs (Cover all,

high visibly jacket, hard

hat, Safety Goggle, Escape hood, Personal Gas Monitor, Safety Shoe- As per area requirement.




1C

1C

1C



1C

Low




Activity: Manual Handling




2

  • Physical hazard

  • Musculoskeletal disorders, Hand injuries, cut, bruises

  • Sharp edges




  • Unbalanced load

  • Striking a person

  • Improper lifting practices

  • Incompetent workers

  • Poor housekeeping

  • Personnel Injury

  • Property damage

  • Back pain and muscle strain



  • 14.0Manual Handling and Ergonomics v3.1




  • 2.0 Personal Protective Equipment v3.1

Y

-

3C

2C




3C

Medium

  • PTW system

  • Approved Method statement and TRA

  • TBT prior to start of the activities

  • Handling load to be limited

  • Manual handling training should be for all workers



  • JP/Supervisor must monitor the activities closely and corrective actions to be taken as required – full time supervision,

  • Be aware of awkward shaped loads and unevenly balanced loads

  • Use correct lifting technique by pushing up with leg instead of back.

  • Proper housekeeping to be maintained on daily basis.

  • Awareness posters to be display should be available at site.

  • Loads to be lifted close to his body

  • Proper handling procedure to be followed

  • Appropriate Hand gloves shall be used.

  • Seek assistance if load is too heavy for one person to lift.



1C

1C

-

1C

Low







SLN.

Hazard Title

Hazard Detail

Causes

Consequences

Existing Legal Requirements

Legal Compliance

Risk Assessment

Existing Controls

Additional Controls Proposed

Residual Risk Assessment

Y

N

P

A

E

R

RI







P

A

E

R

RI

Activity: Installation of Field Instruments (Rigging and Lifting)

5

  • Physical Hazard

  • Suspended load.

  • Swinging load.

  • Movement of equipment.

  • Collision with existing facilities.

  • Pinch points

  • Slip trips & fall

  • Fire from equipment.




  • Personnel under suspended load

  • Crane not positioned on level ground.

  • Improper signaling to

operator.

  • Failure of equipment.

  • Failure of lifting gears.

  • Incompetent workers & supervisor

  • Falling and tripping.

  • Unbalanced load

  • Outriggers rest on loose surface.

  • Limited access



  • Fatality

  • Personal injury.

  • Electrocution

  • Asset damage.

  • Fire & explosion




  • 21.0 - Permit to Work Systems v3.1




  • 34.0 - Safe Use of Lifting Equipment and Lifting Accessories v3.0

Y

4D

3E

3E

4D

4D

High

  • Ensure that PTW, Approved MSRA available and TBT prior to start the activities

  • TBT and pre-lifting plan to be conducted before commencing the activity

  • Clear the lifting area of unauthorized workers.

  • Continuous monitoring of wind speed & stop lifting activity if wind speed exceeds 32KPH.

  • Follow approved drawing for installation.

  • Skilled and certified riggers shall be carried out slinging and lifting operations.

  • Closed supervision at all time.

  • Proper warning signs, traffic cones and barriers must be placed in the area of lifting.

  • Fall protection must be used while working at height above 1.8 meter.

  • Ensure full compliance of PPE.




  • Appointed Person and Lifting Supervisor shall supervise all Lifting Activities.

  • Daily inspection of equipment prior to start of work.

  • Approved Lifting plan

  • Warning signs at the existing track crossings.

  • Flagman shall be present at cross over.

  • Crane to be positioned on level & compacted ground.

  • All lifting gear shall be color coded and have valid certificate.

  • Use only certified riggers.

  • Use taglines to control the load swing.

  • Trained and competent instrument fitters shall carry out assembly, bolting during Erection

  • Equipment with diesel engine shall be fitted with Spark arrester and zone II as per the area requirement.




1C

1C

1C

1C

Low




SLN.

Hazard Title

Hazard Detail

Causes

Consequences