ANNEX IV: Indicative List of Minor Projects - Water

No

Name of the Investment Activity

Province/Municipality

Investment Value

1

Kırşehir Water and Wastewater

Kırşehir

€ 25,000,000

2

Doğubayazıt Wastewater Project 2nd Package

Ağrı

€ 16,000,000

3

Kuşadası Water and Wastewater

*Aydın Greater Municipality

€ 25,000,000

4

Van Water and Wastewater

*Van Greater Municipality

€ 25,000,000

5

Trabzon Water and Wastewater

*Trabzon Greater Municipality

€ 20,000,000

6

Bozüyük (Bilecik) Water and Wastewater

Bilecik

€ 10,000,000

7

Bismil Water and Wastewater

*Diyarbakır Greater Municipality

€ 10,000,000

8

Viranşehir Water and Wastewater

*Şanlıurfa Greater Municipality

€ 10,000,000

9

Elbistan Water and Wastewater

*Kahramanmaraş Greater Municipality

€ 22,000,000

10

Çanakkale Water and Wastewater

Çanakkale

€ 27,900,000

11

M,Kemalpaşa Water and Wastewater

*Bursa Greater Municipality

€ 28,000,000

ANNEX V: Indicative Main List of Major Projects – Waste

Major Project No:

1

Project title:

Ordu Integrated Waste Management Project

Brief description of its aim and intended results:

Project population: 187,000

The measures considered as part of the project are listed as follows:



  • Construction of waste landfill site

  • Rehabilitation of dumpsites

  • Construction of transfer station

  • Construction of leachate management system

Project value and funding sources:

EUR 57 million

Sources of Funding:

Implementation period:

2 years + DNP

Stage of preparation:

IPA application is being prepared by on-going service contractor of technical assistance project to prepare integrated waste management projects.



Major Project No:

2

Project title:

Elbistan Solid Waste Management Project

Brief description of its aim and intended results:

The measures considered as part of the project are listed as follows:

  • Provision of equipment (containers and collection trucks) for the improved waste storage and collection in the entire Kahramanmaraş Environmental Infrastructure Basic Services Union, according to the provisions of the Master Plan

  • Construction of one regional landfill in Afşin to dispose of the waste from urban and rural areas of the Kahramanmaraş Environmental Infrastructure Basic Services Union

  • One new composting plant with windrow compost process located at the landfill site in Afşin, aimed at treating the organic fraction from households and commercial entities in the Union’s service area

  • One sorting plant at landfill site in Afşin

  • Construction of two new transfer stations

  • Closure (in-situ) and remediation of Elbistan, and Afşin dumpsites

  • Relocation and closure of small dumpsites in the urban and rural areas of the Kahramanmaraş Environmental Infrastructure Basic Services Union

  • Implementation of the Technical Assistance project

Project value and funding sources:

EUR 33 million

Sources of Funding:

  • EU IPA Grant Funds

  • National Sources

Implementation period:

2 years + DNP

Stage of preparation:

Master Plan has been prepared by on-going service contractor of technical assistance project to prepare integrated solid waste management projects.

ANNEX V: Indicative Reserve List of Major Projects - Waste

Major Project No:

1

Project title:

Siverek Solid Waste Management Project

Brief description of its aim and intended results:

The measures considered as part of the project are listed as follows:

  • Provision of equipment (containers and collection trucks) for the improved waste storage and collection in the entire Siverek Environmental Services Union, according to the provisions of the Master Plan

  • Construction of one regional landfill in Siverek to dispose of the waste from urban areas of the Siverek Environmental Services Union

  • One new composting plant with windrow compost process located at the regional landfill in Siverek municipality, aimed at treating the organic fraction from households and commercial entities in the Union’s service area, including composting of animal manure. In addition construction of a number of collection platforms for animal waste.

  • One sorting plant at landfill site in Siverek

  • Construction of one new transfer station (TS) in Hilvan Municipality

  • Rehabilitation in situ of Hilvan dumpsite and Siverek dumpsite

  • Implementation of the Technical Assistance project

Project value and funding sources:

EUR 31 million

Sources of Funding:

  • EU IPA Grant Funds

  • National Sources

Implementation period:

2 years + DNP

Stage of preparation:

Master Plan has been prepared by on-going service contractor of technical assistance project to prepare integrated solid waste management projects.



Major Project No:

2

Project title:

Hakkari Solid Waste Management Project

Brief description of its aim and intended results:

The measures considered as part of the project are listed as follows:

  • Provision of equipment (containers and collection trucks) for the improved waste storage and collection in the entire Hakkâri Union, according to the provisions of the Master Plan, including collection of MSW, recyclables, and ash

  • Construction of one regional landfill in Akçali to dispose of the waste from urban and rural areas of the Hakkâri Union

  • One new composting plant with windrow compost process located at the landfill site in Akçali, aimed at treating the organic fraction from households and commercial entities in the Union’s service area

  • One sterilization plant for medical waste located at the landfill site in Akçali, aimed at treating the medical waste from the entire Union’s service area

  • One sorting plant at landfill site in Akçali

  • Complete closure of two main dumpsites at Hakkâri and Yüksekova Municipalities and simplified closure of Çukurca dumpsite

  • Closure and transfer of waste from the dumpsites at Şemdinli, Esendere and Derecik

  • TA for supervision and institutional building

Project value and funding sources:

EUR 32 million

Sources of Funding:

  • EU IPA Grant Funds

  • National Sources

Implementation period:

2 years + DNP

Stage of preparation:

Master Plan has been prepared by on-going service contractor of technical assistance project to prepare integrated solid waste management projects.




Major Project No:

3

Project title:

Viranşehir & Ceylanpınar Solid Waste Management Project

Brief description of its aim and intended results:

The measures considered as part of the project are listed as follows:

  • Procurement of Containers and collection trucks

  • Construction of civic amenity area at TS –in Viranşehir

  • One Sorting Plant

  • Construction of Transfer Stations

  • Construction of Composting Plant with windrow compost process located at the landfill site in Viranşehir

  • Complete closure of two existing disposal sites

  • Construction of one regional landfill in Viranşehir to dispose of the waste from urban and rural areas of the Viranşehir and Ceylanpınar Municipalities

  • Solid Waste Management Union

Project value and funding sources:

EUR 31 million

Sources of Funding:

  • EU IPA Grant Funds

  • National Sources

Implementation period:

2 years + DNP

Stage of preparation:

Master Plan and Draft Feasibility Study have been prepared by on-going service contractor of technical assistance project to prepare integrated solid waste management projects.



Major Project No:

4

Project title:

ÇOKAB Solid Waste Management Project

Brief description of its aim and intended results:

The measures considered as part of the project are listed as follows:

  • Provision of an integrated system for collection and transfer of waste by means of side-loaded compaction trucks with demountable containers, platforms for parking containers, and a transfer system by truck/trailers

  • Construction of one regional landfill in Tekeli to dispose of the waste from urban and rural areas of the ÇOKAB Union

  • One new composting plant with windrow compost process located at the landfill site in Tekeli (Oltu), aimed at treating the organic fraction from households and commercial entities in the Union’s service area

  • One sorting plant for recyclable waste established at landfill site in Oltu

  • Complete in-situ closure and rehabilitation of four dumpsites in the ÇOKAB service area, e.g. Oltu, Uzundere, Artvin, and İspir

  • Closure by relocation of the waste from dumpsites in the ÇOKAB

  • Implementation of the Technical Assistance project

Project value and funding sources:

EUR 33 million

Sources of Funding:

  • EU IPA Grant Funds

  • National Sources

Implementation period:

2 years + DNP

Stage of preparation:

Master Plan and Draft Feasibility Study have been prepared by on-going service contractor of technical assistance project to prepare integrated solid waste management projects.



Major Project No:

5

Project title:

Bodrum Solid Waste Management Project

Brief description of its aim and intended results:

The measures considered as part of the project are listed as follows:

  • Construction of waste landfill site

  • Rehabilitation of dumpsites

  • Construction of transfer station

  • Construction of leachate management system

Project value and funding sources:

EUR 34 million

Sources of Funding:

  • EU IPA Grant Funds

  • National Sources

Implementation period:

2 years + DNP

Stage of preparation:

Master Plan and Draft Feasibility Study have been prepared by on-going service contractor of technical assistance project to prepare integrated solid waste management projects.



1 http://www.worldbank.org/en/country/turkey/overview

2 http://www.worldbank.org/en/country/turkey/overview

3 http://www3.weforum.org/docs/CSI/2012-13/GCR_Rankings_2012-13.pdf

4 http://data.worldbank.org/indicator/NY.GDP.MKTP.KD.ZG

5 http://www.economy.gov.tr/index.cfm?sayfa=ulusticgundem&icerik=070C58D4-CB84-EE3F-2624FD0439943ABA

6 http://www.worldbank.org/en/country/turkey/overview

7 http://www.chamber.org.il/images/Files/24821/24821.ppt http://epp.eurostat.ec.europa.eu/tgm/table.do?tab=table&init=1&language=en&pcode=tps00006&plugin=1

8 10th Development Plan of Turkey, p. 28, http://pbk.tbmm.gov.tr/dokumanlar/10-kalkinma_plani.pdf

9 The figures given in Table relate to investments needs. Technical assistance requirements (including small scale investments, if applicable) are not included in the table. In addition, technical assistance requirements related with the disaster and emergency management are not also inserted in this table.

10 TurkStat, 2014

11 Toolkit on Mainstreaming Gender Equality in EC Development Cooperation, European Commission, 2004

12 TurkStat, 2014.

13 TurkStat, Waste Water Treatment Plants Database of the Water and Soil Management Department of MoEU, 2014

14 TurkStat, MoEU, Waste Management Department, 2014

15 Disaster risks are the potential hazards and/or harms on the society, people, property, land, environment etc. borned by natural and man D made/technological disasters.

** For the purposes of the HR Development programme only

** There have been preliminary discussions with the Government regarding development of a Turkey Investment Programme (TIP). Such a financing programme could be a framework for investments under IPA II with the aim of providing leverage for EU, IFIs, bilateral and private funding. It would complement existing facilities and programmes. The MEUA has to be aware that the total budget assigned to a specific sector includes the budget allocated to the TIP, and foresees a specific allocation for this programme.



*



*



** For the purposes of the HR Development programme only

** In the case Turkey Investment Programme (TIP) will be launched in the future, necessary arrangements and budget allocations could be ensured under SOP.



*



*



** For the purposes of the HR Development programme only

** In the case Turkey Investment Programme (TIP) will be launched in the future, necessary arrangements and budget allocations could be ensured under SOP.



*



*



** For the purposes of the HR Development programme only

** There have been preliminary discussions with the Government regarding development of a Turkey Investment Programme (TIP). Such a financing programme could be a framework for investments under IPA II with the aim of providing leverage for EU, IFIs, bilateral and private funding. It would complement existing facilities and programmes. The MEUA has to be aware that the total budget assigned to a specific sector includes the budget allocated to the TIP, and foresees a specific allocation for this programme.



*



*



16 Considering N+5 rule, investment activities will be reviewed from 2020 onwards.

17 Considering the mid-term evaluation of the programme, Acquis related institutional building activities are reviewed for 2017.

18 According to Municipality Law No 6360, total number of municipalities decreased from 2,950 to 1,395. Hence, this target will be revised whilst TurkStat publishes 2014 data.

19 These data are planned to be generated for IPA II period. For IPA I period, given the current time limits, such an analysis can also be made and included in the next update of the SOP document.

20 These data are planned to be generated for IPA II period. For IPA I period, given the current time limits, such an analysis can also be made and included in the next update of the SOP document.

21 Update of UÇES is planned to be completed in 2015.