PTW Assessment Preparation
3a-Work site examination box

22- Work site examination first day
Yes
23- Validate required everyday
Yes



40

5-Agreement by other effected custodian
24- There is other effected custodian
No

6a-

Production coordinator
25- The permit approved by Production coordinator
Yes














41

Scenario number 4
Permit type Class Ab b1-Application and description box
26- work order title
Mechanical work
27- Permit Nob
28- Location
Lekwaire
29- Work site
Malan site
30- No. in work party
6
31- Work description
To carryout Replacement flow line from well number 2456 to the station which include multiple activity which are cold cutting, welding, grinding and shifting and lifting.
32- Activity No. Refer to PTW system
(1.1 - 1.3 - 1.5 – 6.1 - 6.4 - 6.14 - 11.1)
33- Area classification


42

The aera is process facility
34- Associate permit number
No association
35- Work Order / EWP Nob Sb- Planner agrees in frozen plan
Yes
37- Hazardous area classification
Zone 2
38- NORM contaminated area
Yes
39- Mercery potential
No
40- HS facility classification
It is sour
41- Expected max PPM
200 ppm
42- Vehicle entry required
Yes