1 Done by: P. H. Muath Alaadi ptw assessment Preparation



Download 1.54 Mb.
View original pdf
Page25/29
Date12.11.2023
Size1.54 Mb.
#62580
1   ...   21   22   23   24   25   26   27   28   29
PTW Assessment Preparation

6a-

Production coordinator
25- The permit approved by Production coordinator
Yes















38

Scenario number 3
Permit type Class Ab b1-Application and description box
1- work order title
Mechanical work
2- Permit Nob
3- Location
Lekwaire
4- Work site
B station site
5- No. in work party
6
6- Work description
To carryout New flow line from well number 054 to the station which include multiple activity which are welding, grinding and shifting and lifting.
7- Activity No. Refer to PTW system
(1.1 - 1.3 - 1.5 - 6.4 - 6.14 - 11.1)
8- Area classification
The aera is hydrocarbon
9- Associate permit number


39

No association
10- Work Order / EWP Nob Sb- Planner agrees in frozen plan
Yes
12- Hazardous area classification
Zone 2
13- NORM contaminated area
No
14- Mercery potential
No
15- HS facility classification
It is sweet
16- Expected max PPM
80 ppm
17- Vehicle entry required
No
2-Certificate attached to permit box

18- Certificate attached with permit
- Confined space certificate
- OHL certificate
3-Gas testing requirement box

19- Gas to be tested
(Hydrocarbon – HS – Oxygen – Other)
20- Gas test to be repeated at interval
No
21- Continuous gas monitoring required during execution of the work
Yes