12 55- Your actions when permit is suspended? • Check that the work site and equipment affected by work site have been left in a safe condition.
• Sign Box c of the pink/blue copy of the permit to confirm that work has been suspended.
• Take
the permit to the issue point, sign the green copy and give it to the area authority who will keep it there until ready tore start the work if the work is in a process facility this must be done.
56- What you will check in permit 1. Permit type
2. Permit No.
3.
Work description 4. Location
5. Dates
6. Signs
7. Attached certificates
8.
Job HSE plan 9. TRIC card
10. Procedures
11
Lifting plan 12. Drawings
57- What will a Permit Holder do when you take permit from Applicant? I will take briefing from Applicant about job, location and requirements of job HSE plan then
I will check the description, activities, type of permit and attached documents. If everything is complete and correct, I accept the permit and I go for validation.
Share with your friends: