Acac cns/atm study Update & Strategic Planning Supplemental Data Collection Questionnaire Project Manager



Download 2.67 Mb.
Page13/26
Date02.02.2017
Size2.67 Mb.
#15945
1   ...   9   10   11   12   13   14   15   16   ...   26

6.11Physical Infrastructure


(FO-2): Identify whether your facilities and their infrastructure are capable of sustaining and advancing effective and efficient operations into the following time frames? Insert your responses into the table. Please identify any facility and/or infrastructure changes needed.

Insert Response Here:

Table : FO-3, Physical Infrastructure



Facility Name

Facility Infrastructure Ability to Support Future Operations (‘Y’ or ‘No’)

Present

to 2020

2020 to2025

2025 to2030

Planned Changes

Example (ACC)

Yes

No

Yes

2022 Planned Building Extension

ACC(s)













Approach Controls













Aerodromes













Flight Services













Other (Specify)













Other (Specify)














(FO-2-1): Additional comments, as appropriate.

Insert Response Here:

7FIR Communications (CM):


Please provide the following FIR Communications information:
SAMPLE - (CM-1): Identify your facility’s CURRENT and FUTURE communication methods in both the (1) Air to Ground, and (2) Ground to Ground environments. Please use the facility type abbreviations listed below when responding. Indicate your response with an “X”.

AC = Area Control Center

AP = Approach Control Facility

AD = Aerodrome Facility

FS = Flight Services

Communications – Sample

Table : CM-1, Sample, Communication Methods

Type of Communication

Current

2020

2025

2030

Air to Ground

FACILITY:

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

Communication Type

VHF

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

CPDLC

























X










X










Ground to Ground

AIDC / OLDI

























X










X










Land Lines

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

Sat Phone













X

X







X

X







X

X

X

X


(CM-1): Identify your facility’s CURRENT and FUTURE communication methods in both the (1) Air to Ground, and (2) Ground to Ground environments. Please use the facility type abbreviations listed below when responding. Indicate your response with an “X”.
Insert Response Here:

Table : CM-1, Communication Methods



Type of Communication

Current

2020

2025

2030

Air to Ground

FACILITY Type:

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

Communication Type

VHF

















































UHF

















































HF

















































CDPLC

















































SATCOM

















































Other (Specify)

















































Ground to Ground

FACILITY Type:

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

Communication Type

AIDC / OLDI

















































Landlines

















































Sat Phone

















































Commercial Phone Lines

















































Other (Specify)

















































(CM-1-1): Additional comments, as appropriate.

Insert Response Here:

SAMPLE - (CM-2): What is the CURRENT DAY level of adequacy of the communication methods used within this FIR? Please use the criteria defined in Part 1 and the facility type abbreviations listed below when responding. Indicate your response with an “X”.
AC = Area Control Center

AP = Approach Control Facility

AD = Aerodrome Facility

FS = Flight Services


Communications – Sample

Table : CM-2, Sample, A/G Communications

Type of Communication

Adequate (9-10)

Moderately Adequate

(6-8)

Minimally Adequate

(3-5)

Not Adequate At All

(0-2)

Not Applicable

Air to Ground

FACILITY :

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

Comm. Type

VHF

X













X

X













X

























UHF













X

X













X













X













Ground to Ground

AIDC / OLDI

















































X

X

X

X

Landlines













X




X

X




X































Commercial Phone Lines

X

X




X







X








































(CM-2): What is the CURRENT DAY level of adequacy of the following two communication methods used within this FIR? Please use the criteria defined in Part 1 and the facility type abbreviations listed below when responding. Indicate your response with an “X”.

AC = Area Control Center

AP = Approach Control Facility

AD = Aerodrome Facility

FS = Flight Services

Air to Ground

Insert Response Here:

Table : CM-2, A/G Communications



Type of Communication

Adequate (9-10)

Moderately Adequate

(6-8)

Minimally Adequate

(3-5)

Not Adequate At All

(0-2)

Not Applicable

Air to Ground

FACILITY:

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

Comm. Type

VHF





























































UHF





























































HF





























































CDPLC





























































SATCOM





























































Other (Specify)






























































AC = Area Control Center

AP = Approach Control Facility

AD = Aerodrome Facility

FS = Flight Services

Ground to Ground

Insert Response Here:

Table : CM-2, G/G Communications



Type of Communication

Adequate (9-10)

Moderately Adequate

(6-8)

Minimally Adequate

(3-5)

Not Adequate At All

(0-2)

Not Applicable

Ground to Ground

FACILITY:

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

Comm. Type

AIDC / OLDI





























































Landlines





























































Sat Phone





























































Commercial Phone Lines





























































Other (Specify)































































(CM-2-1): Additional comments, as appropriate.

Insert Response Here:



Download 2.67 Mb.

Share with your friends:
1   ...   9   10   11   12   13   14   15   16   ...   26




The database is protected by copyright ©ininet.org 2024
send message

    Main page