From:
|
To
|
Position
|
Vsl`s name
|
Vsl`s type
Type of DP System
|
Vsl`s flag
|
DWT
|
Engine
type
|
Total HP
|
Propulsion type
|
Crane Type/ Lifting capacity
|
DP Time\ Activity Code
|
Area of
operation
|
Company or Manager’s name
|
13.08.17
|
14.09.17
|
Chief Engineer
|
AKADEMIK CHERSKIY
|
DP-3 Ultra Deep Water Pipe S-Lay/
Heavy Lift/DSV
Construction Vsl/
Kongsberg
|
Gibraltar
|
30146
|
8 x EMD
20-710G7B
|
40000
|
2xFPP Azi
7xFPP Azimuth Retractable Thr-s
1xCPP Tunnel Thr
Rolls Royce
|
HUISMAN Itrec
1800m Ton/27m,
600m Ton Heave Compensated Hoist;
2x TTS, 40m Ton
Pedestal Cranes
|
OT
|
South China Sea, Pacific Ocean
|
Kuiper International / FOX Offshore/ MRTS
|
31.05.17
|
13.07.17
|
Chief Engineer
|
AKADEMIK CHERSKIY
|
DP-3 Ultra Deep Water Pipe S-Lay/
Heavy Lift/DSV
Construction Vsl/
Kongsberg
|
Gibraltar
|
30146
|
8 x EMD
20-710G7B
|
40000
|
2xFPP Azi
7xFPP Azimuth Retractable Thr-s
1xCPP Tunnel Thr
Rolls Royce
|
HUISMAN Itrec
1800m Ton/27m,
600m Ton Heave Compensated Hoist;
2x TTS, 40m Ton
Pedestal Cranes
|
OT
|
Singapore/
South China Sea
|
Kuiper International / FOX Offshore/ MRTS
|
06.03.17
|
20.04.17
|
Chief Engineer
|
AKADEMIK CHERSKIY
|
DP-3 Ultra Deep Water Pipe S-Lay/
Heavy Lift/DSV
Construction Vsl/
Kongsberg
|
Gibraltar
|
30146
|
8 x EMD
20-710G7B
|
40000
|
2xFPP Azi
7xFPP Azimuth Retractable Thr-s
1xCPP Tunnel Thr
Rolls Royce
|
HUISMAN Itrec
1800m Ton/27m,
600m Ton Heave Compensated Hoist;
2x TTS, 40m Ton
Pedestal Cranes
|
OT
|
Singapore/
South China Sea
|
Kuiper International / FOX Offshore/ MRTS
|
14.12.16
|
25.01.17
|
Chief Engineer
|
AKADEMIK CHERSKIY
|
DP-3 Ultra Deep Water Pipe S-Lay/
Heavy Lift/DSV
Construction Vsl/
Kongsberg
|
Gibraltar
|
30146
|
8 x EMD
20-710G7B
|
40000
|
2xFPP Azi
7xFPP Azimuth Retractable Thr-s
1xCPP Tunnel Thr
Rolls Royce
|
HUISMAN Itrec
1800m Ton/27m,
600m Ton Heave Compensated Hoist;
2x TTS, 40m Ton
Pedestal Cranes
|
OT
|
Singapore/
South China Sea
|
Kuiper International / FOX Offshore/ MRTS
|
21.09.16
|
03.11.16
|
Chief Engineer
|
JASCON 18
|
DP-3 Ultra Deep Water Pipe S-Lay/
Heavy Lift/DSV
Construction Vsl/
Kongsberg
|
Gibraltar
|
30146
|
8 x EMD
20-710G7B
|
40000
|
2xFPP Azi
7xFPP Azimuth Retractable Thr-s
1xCPP Tunnel Thr
Rolls Royce
|
HUISMAN Itrec
1800m Ton/27m,
600m Ton Heave Compensated Hoist;
2x TTS, 40m Ton
Pedestal Cranes
|
OT
|
Singapore/
South China Sea
|
Kuiper International / FOX Offshore/ MRTS
|
30.06.16
|
11.08.16
|
Chief Engineer
|
JASCON 18
|
DP-3 Ultra Deep Water Pipe S-Lay/
Heavy Lift/DSV
Construction Vsl/
Kongsberg
|
Gibraltar
|
30146
|
8 x EMD
20-710G7B
|
40000
|
2xFPP Azi
7xFPP Azimuth Retractable Thr-s
1xCPP Tunnel Thr
Rolls Royce
|
HUISMAN Itrec
1800m Ton/27m,
600m Ton Heave Compensated Hoist;
2x TTS, 40m Ton
Pedestal Cranes
|
OT
|
Singapore/
South China Sea
|
Kuiper International / FOX Offshore/ MRTS
|
29.03.16
|
18.05.16
|
Chief Engineer
|
JASCON 18
|
DP-3 Ultra Deep Water Pipe S-Lay/
Heavy Lift/DSV
Construction Vsl/
Kongsberg
|
Gibraltar
|
30146
|
8 x EMD
20-710G7B
|
40000
|
2xFPP Azi
7xFPP Azimuth Retractable Thr-s
1xCPP Tunnel Thr
Rolls Royce
|
HUISMAN Itrec
1800m Ton/27m,
600m Ton Heave Compensated Hoist;
2x TTS, 40m Ton
Pedestal Cranes
|
OT
|
Singapore/
South China Sea
|
Kuiper International / MRTS
|
18.11.15
|
19.02.16
|
Chief Engineer
|
JASCON 18
|
DP-3 Ultra Deep Water Pipe S-Lay/
Heavy Lift/DSV
Construction Vsl/
Kongsberg
|
Gibraltar
|
30146
|
8 x EMD
20-710G7B
|
40000
|
2xFPP Azi
7xFPP Azimuth Retractable Thr-s
1xCPP Tunnel Thr
Rolls Royce
|
HUISMAN Itrec
1800m Ton/27m,
600m Ton Heave Compensated Hoist;
2x TTS, 40m Ton
Pedestal Cranes
|
OT
|
Singapore/
South China Sea
|
Kuiper International / MRTS
|
01.09.15
|
11.10.15
|
Chief Engineer
|
JASCON 18
|
DP-3 Ultra Deep Water Pipe S-Lay/
Heavy Lift/DSV
Construction Vsl/
Kongsberg
|
Gibraltar
|
30146
|
8 x EMD
20-710G7B
|
40000
|
2xFPP Azi
7xFPP Azimuth Retractable Thr-s
1xCPP Tunnel Thr
Rolls Royce
|
HUISMAN Itrec
1800m Ton/27m,
600m Ton Heave Compensated Hoist;
2x TTS, 40m Ton
Pedestal Cranes
|
OT
|
Singapore/
South China Sea
|
Kuiper International / MRTS
|
24.12.14
|
12.02.15
|
Chief Engineer
|
ARMADA HAWK /
Ex. ACERGY HAWK (Subsea7)
|
DP-2 Construction/ F PipeLay/Heavy Lift/ DSV/ROV
Vessel / Converteam
|
Panama
|
4346
|
6 x Daihatsu
6 DSM-32
|
8200
|
2x Kamome CPP
4x Kamome Tunnel Thrusters
|
Liebherr BOS 240/5000; 240t
Pedestal Type
|
PL,HL, D, Accom,
ROV, A/
605 Hrs
|
Cluster 7/ONGC
India
|
BUMI ARMADA
BERHARD / (Construction division)
|
26.08.14
|
01.11.14
|
Chief Engineer
|
ARMADA HAWK /
Ex. ACERGY HAWK (Subsea7)
|
DP-2 Construction/ F PipeLay/Heavy Lift/ DSV/ROV
Vessel / Converteam
|
Panama
|
4346
|
6 x Daihatsu
6 DSM-32
|
8200
|
2x Kamome CPP
4x Kamome Tunnel Thrusters
|
Liebherr BOS 240/5000; 240t
Pedestal Type
|
HL, D, Accom,
ROV, A/
105 Hrs
|
Bach Oil Field
Vietnam/PV GAS
|
BUMI ARMADA
BERHARD / (Construction division)
|
27.05.14
|
10.07.14
|
Chief Engineer
|
ARMADA HAWK /
Ex. ACERGY HAWK (Subsea7)
|
DP-2 Construction/ F PipeLay/Heavy Lift/ DSV/ROV
Vessel / Converteam
|
Panama
|
4346
|
6 x Daihatsu
6 DSM-32
|
8200
|
2x Kamome CPP
4x Kamome Tunnel Thrusters
|
Liebherr BOS 240/5000; 240t
Pedestal Type
|
HL, D, Accom,
ROV, A/
444 Hrs
|
Bach Oil Field
Vietnam/PV GAS
|
BUMI ARMADA
BERHARD / (Construction division)
|
26.02.14
|
18.04.14
|
Chief Engineer
|
ARMADA HAWK /
Ex. ACERGY HAWK (Subsea7)
|
DP-2 Construction/ F PipeLay/Heavy Lift/ DSV/ROV
Vessel / Converteam
|
Panama
|
4346
|
6 x Daihatsu
6 DSM-32
|
8200
|
2x Kamome CPP
4x Kamome Tunnel Thrusters
|
Liebherr BOS 240/5000; 240t
Pedestal Type
|
HL, D, Accom,
ROV, A/
302 Hrs
|
Bach Oil Field
Vietnam/PV GAS
|
BUMI ARMADA
BERHARD / (Construction division)
|
03.07.13
|
29.08.13
|
Chief Engineer
|
CCC
MARITIME 2
|
DP-2 DSV/ROV Support Vessel/
Kongsberg DPS700
|
Panama
|
2512
|
2xNigata 6L26HLX
4x CAT C32
|
6844
|
2xNigata Azimuth Thrusters 2xKawasaki Tunnel Thrusters
|
Offshore Crane MCT 30t, Subsea Telescopic type
|
D/ROV
512 Hrs
|
Miri Oilfield, Malaysia
|
CCC Underwater Engineering S.A.L.
|
18.04.13
|
20.06.13
|
Chief Engineer
|
TOPAZ
COMMANDER
|
DP-2 MPSV DSV/ROV Support Vessel
Kongsberg K-pos
|
St.Vincent
|
3465
|
2xUlstein Bergen
3xCaterpillar
|
9600
|
2 x CPP Ulstein
1x Azimuth Thruster Ulstein
3 x Tunnel Thrusters Ulstein
|
Offshore Crane100t, Knuckle Jib Type
|
D/ROV
672 Hrs
|
Borkum West-2, North Sea;
RS Diving,
Germany.
|
Topaz Energy & Marine Pte Ltd
|
01.08.12
|
01.11.12
|
Chief Engineer
|
LEWEK
CRUSADER
|
DP-3
Pipe Lay/ Heavy Lift/Construction/ DSV/2x ROV/
Accommodation
Converteam
|
Singapore
|
18 006
|
2 x MAK
9L32
4 x Caterpillar
3512B
3 x Caterpillar
3516B
|
28 000
|
4 x Azimuth Thrusters Ulstein Aquamaster
2xTunnel Thrusters
Kamewa Ulstein
|
HUISMAN
400t, Pedestal Type
MacGregor
150t, Subsea Knuckle Jib Type
|
HL, PL, D, Accom,
ROV, A/
864 Hrs
|
Arkutun Dagi, Sakhalin-1;
TGT Oil Field, Vietnam
|
EMAS AMC / AKER,Marine
1st Project:
Exxon Mobil,
Sakhalin Energy.
2nd Project: Saipem
|
14.01.12
|
05.03.12
|
Chief Engineer
|
Allied Jane
|
DP-2 MP DSV/
Accommodation
Kongsberg K-pos
|
Malaysia
|
3389
|
2 x Wartsila
9L20
3 x Caterpillar 3408
|
4850+
2010
|
2 x Wartsila Azimuth Thrusters with CPP
2x Kawasaki Tunnel Thrusters
|
Offshore Crane
100t, Knuckle Jib Type
|
D,Accom,
504 Hrs
|
Samarang Oil Field
PETRONAS
|
Allied Marine Sdn Bhd
|
08.08.11
|
01.11.11
|
Chief Engineer
|
Allied Jane
|
DP-2 MP DSV/
Accommodation
Kongsberg K-pos
|
Malaysia
|
3389
|
2 x Wartsila
9L20
3 x Caterpillar 3408
|
4850+
2010
|
2 x Wartsila Azimuth Thrusters with CPP
2x Kawasaki Tunnel Thrusters
|
Offshore Crane
100t, Knuckle Jib Type
|
D, Accom, A/
732 Hrs
|
Bach Oil Field
Vietnam/PV GAS
|
Allied Marine Sdn Bhd
|
16.12.10
|
26.02.11
|
Chief Engineer
|
SWIBER
ATLANTIS
|
DP-2 MP DSV/
Accommodation
Kongsberg K-pos
|
Majuro
|
3389
|
2 x Wartsila
9L20
3 x Caterpillar 3408
|
4850+
2010
|
2 x Wartsila Azimuth Thrusters with CPP
2x Kawasaki Tunnel Thrusters
|
Offshore Crane
100t, Knuckle Jib TypeSubsea Crane, 25t, Knuckle Jib Type
|
D/ROV, Accom, A/348 Hrs
|
ONGC /
Tapti Field India
|
SWIBER
Offshore
|
29.09.10
|
15.10.10
|
Chief Engineer
|
REM
POSEIDON
|
DP-2 MP
Construction /
ROV / DSV
Kongsberg
|
Nassau
|
4869
|
4 x Caterpillar
3516
|
11 300
|
2 x Rolls-Royce Azimuth Thrusters AZP,
2 x Ulstein Tunnel Thrusters
1 x Retractable
Azimuth Thruster
|
Hydromarine
100t, Subsea Knuckle Jib Type
|
OT/D
|
Abu-Dhabi
|
Adams Offshore
|
10.04.10
|
11.06.10
|
Chief Engineer
|
Offshore
Intervention
ex Geofjord / DOF
|
DP-2 MP
DSV/ROV Kongsberg
|
Malaysia
|
3746
|
2x Sulzer
6ZL 40/48
2xCummins
|
10 125
|
2xKort Nozzles CPP,
4 x Ulstein Tunnel Thrusters
1 x Ulstein Retractable
Azimuth Thruster
|
Hydromarine
150t, Subsea Knuckle Jib Type
|
OT/D
330 Hrs
|
SHELL /
South China Sea
|
Offshore Works
Sdn Bhd
|
23.12.09
|
23.02.10
|
Chief Engineer
|
Offshore
Intervention
ex Geofjord / DOF
|
DP-2 MP
DSV/ROV Kongsberg
|
Malaysia
|
3746
|
2x Sulzer
6ZL 40/48
2xCummins
|
10 125
|
2xKort Nozzles CPP,
4 x Ulstein Tunnel Thrusters
1 x Ulstein Retractable
Azimuth Thruster
|
Hydromarine
150t, Subsea Knuckle Jib Type
|
D/ROV, A/
240 Hrs
|
Talisman Energy
South China Sea
|
Offshore Works
Sdn Bhd
|
07.09.09
|
09.11.09
|
Chief
Engineer
|
Offshore
Stephaniturm
|
DP-2
DSV/ROV
Nautronix
|
Malaysia
|
1980
|
2xDeutz 8M528
3 x Deutz 12M816
5xDeutz
8M816
|
2400+3800
|
2xKort Nozzles FPP Lips,
3 x Jastram Azimuth CPP Thrusters,
2 x Ulstein Tunnel Thruster
|
Offshore Crane
30t, Subsea Knuckle Jib Type
|
D/ROV, A/
744 Hrs
|
Talisman Energy
South China Sea
|
Offshore Works
Sdn Bhd
|
15.05.09
|
16.07.09
|
Chief
Engineer
|
Offshore
Stephaniturm
|
DP-2
DSV/ROV
Nautronix
|
Malaysia
|
1980
|
2xDeutz 8M528
3 x Deutz 12M816
5xDeutz
8M816
|
2400+3800
|
2xKort Nozzles FPP Lips,
3 x Jastram Azimuth CPP Thrusters,
2 x Ulstein Tunnel Thrusters
|
Offshore Crane
30t, Subsea Knuckle Jib Type
|
D/ROV/
A/
150 Hrs
|
Petronas /
South China Sea
|
Offshore Works
Sdn Bhd
|
14.02.09
|
29.03.09
|
2nd
Engineer
|
ZAMIL 51
|
DP-2 DSV/Multipurpose
ASD prop/Rolls-Royce
|
Bahrain
|
1736
|
4 x Yanmar 6EY26L
|
9860
|
2 x Azimuth Thrusters CP Ulstein Aquamaster FPP
2xTunnel Thrusters
Kamewa Ulstein
|
Offshore Crane
30t, Telescopic Type
|
D/
400 Hrs
|
Zulof Field
Persian Gulf/
ARAMCO
|
ADPS / Zamil Offshore/Marine
Service/ARAMCO
|
24.11.08
|
05.01.09
|
2nd
Engineer
|
ZAMIL 51
|
DP-2 DSV/Multipurpose
ASD prop/Rolls-Royce
|
Bahrain
|
1736
|
4 x Yanmar 6EY26L
|
9860
|
2 x Azimuth Thrusters CP Ulstein Aquamaster FPP
2xTunnel Thrusters
Kamewa Ulstein
|
Offshore Crane
30t, Telescopic Type
|
D/
370 Hrs
|
Zulof Field
Persian Gulf/
ARAMCO
|
ADPS / Zamil Offshore/Marine
Service/ARAMCO
|
13.07.08
14 days
|
26.07.08
Planed Contract
|
Chief Engineer
|
Caledonian Vision
|
DP-2
MRV/PSV
ASD prop. / Alstom
| Cayman
Island
|
5700
|
4 x MAK
8L 25
|
11 050
|
2 x Azimuth Thrusters CP Ulstein,
43x Ulstein Tunnel Thrusters
1 x Ulstein Retractable
Azimuth Thruster
|
Hydromarine
ARC davit
300t
|
SB/OT
140Hrs
|
Bruce Gas Field
North Sea / BP
|
Vector Offshore / UK
North Sea operation
|
18.12.07
|
21.02.08
|
Chief
Engineer
|
SEA JAGUAR
|
DP–2
AHTS/Deep water / Kongsberg
| Limassol |
2952
|
2xWartsila
12V32
2xCat 3408
|
15 000
|
2xWartsila Lips CPP
3xTunnel Thrusters
|
Telescopic Boom Type, 6t
|
OT AHTS, 350 Hrs
|
Total Charter
Energy Searcher
Location
|
Deep Sea Supply ASA/ Norway
|
30.08.07
|
29.10.07
|
Chief Engineer
|
SEA JAGUAR
|
DP–2
AHTS/Deep water / Kongsberg
| Limassol |
2952
|
2xWartsila
12V32
2xCat 3408
|
15 000
|
2xWartsila Lips CPP
3xTunnel Thrusters
|
Telescopic Boom Type, 6t
|
OT, AHTS,
705 Hrs
|
Kikeh Oilfield/
Murphy Oil
|
Deep Sea Supply ASA/ Norway
|
17.03.07
|
16.05.07
|
Chief
Engineer
|
TEAM
MUSCAT
|
DP–2
DSV/ROV
Kongsberg
| Kingstown |
2124
|
6L32
2xWartsila
1xCummins
KTA38M2
3xCummins
|
7400+1206
|
2xKort Nozzles CPP
2xUlstein Tunnel Thrusters
1xRetractable HRP Azimuth Thruster
|
Norcrane
25t, Subsea Knuckle Jib Type
|
D/ROV
220Hrs
|
Gas Field/PMS-
Petrobel
|
Topaz Energy & Marine Pte Ltd
|
11.11.06
|
17.01.07
|
Chief
Engineer
|
TEAM
MUSCAT
|
DP–2
DSV/ROV
Kongsberg
| Kingstown |
2124
|
6L32
2xWartsila
1xCummins
KTA38M2
3xCummins
|
7400+1206
|
2xKort Nozzles CPP
2xUlstein Tunnel Thrusters
1xRetractable HRP Azimuth Thruste
|
Norcrane
25t, Subsea Knuckle Jib Type
|
D/ROV/
Cable Lay/ 320Hrs
|
Gas Field/PMS-
Petrobel
|
Topaz Energy & Marine Pte Ltd
|
20.07.06
|
15.09.06
|
Chief
Engineer
|
TEAM
MUSCAT
|
DP–2
DSV/ROV
Kongsberg
| Kingstown |
2124
|
2xWartsila
6L32
1xCummins
KTA38M2
3xCummins
|
7400+1206
|
2xKort Nozzles CPP
2xUlstein Tunnel Thrusters
1xRetractable HRP Azimuth Thruste
|
Norcrane
25t, Subsea Knuckle JibType
|
D/ROV
600Hrs
|
Gas Field/PMS-
Petrobel
|
Topaz Energy & Marine Pte Ltd
|
14.05.06
13.02.06
|
06.06.06
10.04.06
|
2nd
Engineer
|
CCC PIONEER
|
DP–2 DSV/Construction
Alstom/ASD prop.
| Panama |
4002
|
5xWartsila
9L20
|
10 200
|
2 x Azimuth Thrusters Ulstein Aquamaster
3xTunnel Thrusters
Kamewa Ulstein
|
National Oilwell 75t, Subsea Telescopic type
|
D/ROV/
Accom/
228Hrs
|
Qatar / Karkara
Tapti Field India
|
CCC Underwater Engineering
|
22.08.05
|
21.11.05
|
Chief
Engineer
|
KATHY
|
AHTS / ROV
Vsl
| Turkmenistan |
1618
|
3 x Crappelle
6PSN3L
|
4320
|
3xKort Nozzles CPP Lips
2xTunnel Thrusters
|
Telescopic Boom Type, 6t
|
ROV/
AHT
|
Caspian
BP Oil Fields
|
GAC Marine Co.
|
19.02.05
|
17.05.05
|
Chief
Engineer
|
OTS YEOMAN
|
DP–1
DSV/ROV
Nautronix
| Panama
|
1700
|
2x GM EMD
V16-645-E2
3xDetroit 8V71
2 x Cat D348
|
3900 + 2134
|
2xKort Nozzles CPP Lips
2 x Jill Jet Thrusters
|
Offshore Crane
25t, Subsea Knuckle Jib Type
|
D/ROV/
Survey/FL
725Hrs
|
Oil Field/LikPin
|
Delmar Marine Transport
|
04.07.04
|
12.09.04
|
Chief
Engineer | SVITZER SOHAR |
Azimuth Drive AHT
ASD prop.
| Belize |
418
|
2xYanmar
8N29A
|
3900
|
2 x Azimuth Thrusters CP Ulstein
|
Telescopic Boom Type, 4t
|
AHT
|
Oman Oil Field
|
Svitzer Wijsmuller
|
15.03.04
|
17.05.04
|
Technical
Supervisor
|
KOVAMBO
|
DP–3
Pipe Lay / ROV Class4
(ex. DSV)/Alstom
|
Norway
|
3284
|
3xWartsila
6R32
|
7800
|
2xKort Nozzles CPP Lips
3xUlstein Tunnel Thrusters
1xRetractable HRP Azimuth Thruster
|
Hydromarine
60t, Subsea Knuckle Jib Type
|
ROV4/FL/PL
300Hrs
|
Namibia Field
|
Arktikmor - Oil/Gas
Exploring Company/Samicor
|
22.01.01
3 months ON
|
01.07.03
1month OFF
|
2nd Eng / Acting
Chief
Engineer
|
CATTOUF,
AL HAMRA,
UMM EL ZEMOUL,
AL SADR
|
HD CSD
|
U.A.E.
|
11500
10200
10200
15340
|
2xWartsila
9L36,
Hyundai H32/40V,
8KM32
|
14 800
11800
11800
27155
|
Spud-Carriers,
Mooring Winches
|
Offshore Cranes
150t,
80t
|
Trenching,
Dredging
|
Abu-Dhabi Oil Fields
|
N.M.D.C
Abu-Dhabi
|