Armenian Railways: Five Year Business Plan



Download 0.9 Mb.
Page20/22
Date05.08.2017
Size0.9 Mb.
#26304
1   ...   14   15   16   17   18   19   20   21   22

Revenues


The Transportation CJSC collects and reports operating revenues in three categories: passenger, freight and other. We understand that “other” operating revenue stems from services that local station staff provide to freight customers, so it is allocated to the freight line of business. The table below summarizes the allocation of Transportation CJSC revenues.
Allocation of Revenues between

Passenger & Freight Lines of Business



Description



2000 Forecast

(AMD Millions)


Line of Business



Passenger

141

Passenger

Freight

4,098

Freight

Other

301

Freight



Rollingstock Costs


The fees the Transportation CJSC pays to the Rollingstock CJSC cover both operating costs and cost of asset ownership for rollingstock. The activity measures upon which the fees are based and the level of the fees determine the cost attributable to passenger and freight business units.20 These fees are based on operating activity measures that railways normally collect and on the fleet requirement (expressed in ownership hours) for each type of activity. Locomotives are used for both passenger and freight, so their measures must be collected by line of business. Other equipment types are used for only one service (e.g., coaches for passenger, wagons for freight), so require no split. The measures upon which the fees are based and how they allocate expenses between passenger and freight are shown in the table below for the 2000 Base Case.
Rollingstock Fees Separated between

Passenger & Freight Lines of Business

(Based on 2000, Base Case)

Fee Basis


Activity


Measure -

Passenger


Activity


Measure -

Freight


Fee for

Passenger

(AMD

millions)



Fee

Freight


(AMD

millions)



Operating Activity Measures













Electric locomotive km

205,098

797,631

238

926

Diesel locomotive km

10,131

8,910

10

9

Diesel locomotive shunting

Minutes


-0-

952,919

-0-

162

Electric train km

403,696

-0-

204

-0-

Wagon-km on AR lines

-0-

8,003,010

-0-

163

Passenger coach km

1,381,942

-0-

80

-0-

Train km

585,622

562,622

76

73
















Cost of Assets













Electric locomotive hours

34,162

205,507

86

516

Diesel locomotive hours

12,826

67,699

16

85

Electric train hours

58,902

-0-

69

-0-

Wagon days

-0-

350,494

-0-

189

Passenger coach days

5,340

-0-

54

-0-
















Total







832

2,124





Download 0.9 Mb.

Share with your friends:
1   ...   14   15   16   17   18   19   20   21   22




The database is protected by copyright ©ininet.org 2024
send message

    Main page