ii. Any property of material of concrete such as aggregate, slump, air content, silt content of sand, quality of admixture, cement etc.
iii. Weighbridge checks of laden and unladen vehicle weights.
iv Stock control of materials.
v Diagnosis and correction of faults identified from complaints.
vi Control of designed and the prescribed mixes a quality control system shall be operated to control the strength of design mixes to the required levels. The system shall include continues analysis of result from cube tests to compare actual with the target value together with the procedures for modifying mix design; periodic and systematic checks shall be made to ensure that the cementious material content of prescribed mixes match with their mix proportion.
vii In case of R.M.C. work being carried out the contractor/agency will submit the original bill/vouchers of approved plant at the time of each and every loaded truck brought at site. All these bills/vouchers will be kept by the divisional office and entries in the M.B. of the vouchers/bills, address of approved source be made. These will be kept with the work file and the files must be kept in safe custody for all time to come.
Executive Engineer
Municipal Corporation
Faridabad
Sr. No
|
NS Item
|
Description of item
|
Qty
|
Unit
|
Rate to be quoted by agency
|
1
|
NS
|
P/F plain POP false ceiling with Gypsteel G.I. Framework & 25 mm thk POP Providing & fixing suspended false ceiling consisting of 25 mm thk POP on mesh and G.I. framework to consists of G.I. perimetre channels 0.55mm thk.x20mm.x30mm. along the perimetre of false ceiling; screw fixed to wall/partition with nylon sleeves & screws @600mm c/c. suspending Intermediate channels of size 0.9mm thk.x45mmx15mm. From the soffit at max. distance 1220mm. c/c with ceiling angle 0.55 mm.thk. x25mm.x10mm. Fixed to soffit using proprietary supplied GI. Cleats & steel expansion fasteners. Rate includes all types of cut-outs, grooves & plain troughs for tube lights as directed by the Architect. The rate shall include cost of providing support framework formed of perimetre channels for fixing light fixtures, A.C. grills/diffusers etc. Alsoto provide concealed perimetre channel support as required to support modular grid ceiling sections at junction between false ceiling & modular grid tile ceiling. The rate also includes verticals beyond 150 mm high in POP/Gypsum in straight or curved shaped.
|
275
|
Sft
|
|
2
|
NS
|
Providing and fixing of POP punning of walls to get level surface etc complete as per design.
|
1654
|
Sqft
|
|
3
|
NS
|
PAINTING WORK (i) P/A Luster paint Providing & applying two coats of Luster paint of Berger/Asian or equivalent make & matching colour shade; on wall surface. The surface to be painted shall be prepared to the satisfaction of the Architect. The surface shall be applied with two coats of primer, two coats of putty & touch up putty if required to achieve smooth finish. The item rate shall be inclusive of scaffolding, tools & tackles required for the painting work. (ii) Oil Bond Distemper Two ore more coats of Acrylic oil bond distemper with brush over the existing wall surfaces, after scrappingthe existing finish, applying one coat of cement premier and one coat of putty to repair the wall as per the site condition including all materials, labour etc complete.
|
1731
|
Sft
|
|
4
|
NS
|
FURNISHING WORK P/F Wardrobe Shutters
a. Wardrobe shutters Laminate finished Providing & fixing 18mm board shutters (or as directed by the
Architect); covered with 1 mm. thk. laminate from one side and 0.6mm thk laminate on the balance side includes handles and lock etc. complete as per design.
|
80
|
Sft
|
|
5
|
NS
|
P/F Wardrobe for Storage Providing & fixing 4' x 8' wardrobe and 4' x 2' loft using 12mm ply box and 6mm ply back with 0.6mm thk laminate finish as per Architects selection and 18mm plywood shutters (or as directed by the Architect); covered with 1 mm. thk. laminate from one side and 0.6mm thk laminate on the balance side all exposed edges to be finished with edge tape of colour matching to laminate used, includes harware and lock etc. complete as per design.
|
75
|
Sft
|
|
6
|
NS
|
P/F Glazed main door a. Glass Door Providing & fixing 4' x 7' 12mm toughned glass door with floor spring mechanism of make Hardwyn/Ebco or equivalent , provided with heavy duty al. door lock, door stopper, al. handles & other required hardware etc. complete as per design
|
1
|
Nos.
|
|
7
|
NS
|
P/F solid flush doors with both side laminate finish Providing & fixing solid door made out of 1 1/2" flush door finished with 1.00 mm. thk. laminate. T.W. lipping of door should be finished with french polish of approved shade. The door should be fitted with 5"x1.25" hinges to the partition as per design & necessary fixtures like door closer, cyllindrical locks, door stoppers, tower bolts should be fitted on it with necessary hardware etc. complete as per design.
|
5
|
Nos.
|
|
8
|
NS
|
P/F Running counters Providing fixing table runner (3'6” x 2'6”) made up of 16mm thk. Plywood framework and 18mm, 12mm & 6mm plywood for drawers as per detail drawing for PA room
|
1
|
Nos.
|
|
9
|
NS
|
P/F soft boards P/F soft board made up of 12 mm. Thk. Soft board mounted on 12mm thk. Comm. Plywood & wrapped with cloth of approved colour, shade & quality. The notice board shall have
1 1/2" x 1/2" liiping patti to all sides with polish on it. The notice board shall be fixed on wall &/or partition as per direction.
|
1
|
Nos.
|
|
10
|
NS
|
P/F white board of 6'0” x 3'6”
|
1
|
Nos.
|
|
11
|
NS
|
P/F S.S. dustbin Providing & fixing readymade S.S. dust-bin as per directions.
|
2
|
Nos.
|
|
12
|
NS
|
P/F Sun/privacy Control film. P/F matt white film to be used as per Architects instructions on glass etc. complete as per design.
|
24
|
Sft
|
|
13
|
NS
|
Workstation – Desks
Providing and fixing Imported Executive Desk with runner 8'0”
x 3'6” etc complete as per design
|
1
|
Nos.
|
|
14
|
NS
|
Providing and fixing Working desk in 18mm board and 1mm laminate finish and 0.6mm laminate on balancing side with storage etc complete as per design.
|
2
|
Nos.
|
|
15
|
NS
|
Workstation – Seating Providing DICE Executive chair with Imported Letterette
|
1
|
Nos.
|
|
16
|
NS
|
Providing DICE Visitor chairs with Imported Lettherette
|
3
|
Nos.
|
|
17
|
NS
|
Providing Workstation chairs with SS legs and fabric finish etc complete as per design.
|
5
|
Nos.
|
|
18
|
NS
|
Providing and fixing 2 seater sofa with 50mm x 50m wooden frame and fabric upholstered etc complete as per design
|
1
|
Nos.
|
|
19
|
NS
|
Providing and fixing waiting chairs with wood frame and fabric upholstered etc complete as per design
|
4
|
Nos.
|
|
20
|
NS
|
Providing ad fixing a coffee table as per selection of Architect etc complete as per the design
|
1
|
Nos.
|
|
21
|
NS
|
Carpet 48” x 72” Aurora Hand Loom Carpet
|
1
|
Nos.
|
|
22
|
NS
|
Vertical Blinds
12'6” x 7'0”
|
1
|
Nos.
|
|
|
NS
|
3'6” x 4'0”
|
2
|
Nos.
|
|
23
|
NS
|
Sanitary Fittings (a) Providing and fixing of wall mounted WC of Kohler or equivalent make etc complete as per design.
|
1
|
Nos.
|
|
|
NS
|
(b) Providing and fixing of Wash basin etc complete as per design.
|
1
|
Nos.
|
|
|
NS
|
(C) Providing and fixing of single diverter Pillar cock for wash basin etc complete as per design
|
1
|
Nos.
|
|
|
NS
|
(d) Providing and fixing of Health Faucet for WC etc complete as per design
|
1
|
Nos.
|
|
|
NS
|
(e) Providing and fixing straight angle valve etc complete
|
3
|
Nos.
|
|
|
NS
|
(f) Providing and fixing of bottle trap etc complete
|
1
|
Nos.
|
|
24
|
NS
|
Wood Framework All wood must be well seasoned, Free from knots, other defects for the toilet window
|
1
|
Nos.
|
|
25
|
NS
|
FLOORING Wooden Laminate Flooring Providing and fixing at site 10mm wooden laminate flooring to be fixed at the site with help of adhesive including all materials, labour etc complete.
|
285
|
Sft
|
|
26
|
NS
|
Tile Flooring Providing & Laying Floor & Wall Tile ( kajaria/somany/nitco) of approved shade and make over a base of 20mm cement mortor, setting the tiles in cement slurry, joins filled and finished neat with white cement complete.) for the extended area(toilet & passage)
|
280
|
Sft
|
|
27
|
NS
|
Providing and Fixing of Artificial grass of 25mm thickness for balcony includes adhesive and labour charges etc complete
|
164
|
Sft
|
|
28
|
NS
|
ELECTRICAL WORKS
Providing and fixing at site Copper
wire of Finolex/RR make, for general lighting and power and
AC points etc complete
(1) Providing and fixing at site 5amp light point in1.5 sqmm PVC insulated copper wire of Finolex/ RR Make only in 18 Guage MS Conduits including all fittings, including Circuit wiring in 2.5 sqmm Copper wire of Finolex/RR make, and earthing of third
pin with 1.6 sqmm copper wire etc complete. with switches and sockets, Boxes etc of Norisys/ Crabtree Make etc complete.
(2) 20 Amp metal socket power point for AC in 6.0 sqmm PVC insulated copper wiring of Finolex/RR make etc complete on a single circuit with metal socket and 32 amp SPMCB outlet for AC
(3) Providing and fixing at Site 3 x 5 Amp Switch & 1 no.
16amp switch sockets of MDS Modular series through the UPS in 2.5sqmm PVC Insulated wires of Finolex/ RR make in 18 Guage MS Conduits with One
point per circuit including 1.6 sqmm PVC insulated wire for earthing to the third pin etc complete as per the site requirements.
|
1
|
Nos.
|
|
29
|
NS
|
Providing & fixing at site 10W LED spot light fittings including fixing the same in the false ceiling including all acessories etc complete.
|
10
|
Nos.
|
|
30
|
NS
|
Providing and fixing at site circular 15W LED discreet light fittings at site including all accessories etc.complete
|
12
|
Nos.
|
|
31
|
NS
|
Providing and fixing Mitsubishi split AC of 2 tonne capacity with wiring and copper piping etc complete as per design
|
1
|
Nos.
|
|
32
|
NS
|
Providing and fixing Window AC of 1 tonne capacity with wiring and pointing etc complete per desgin
|
1
|
Nos.
|
|
33
|
NS
|
Providing and fixing of ceiling fan(4' dia.) etc complete
|
3
|
Nos.
|
|
34
|
NS
|
CIVIL WORKS
Additon of Toilet Block & the passage to Terrace Providing and laying 5” thk slab using , including scaffolding, curing, ets., compelete as directed
Providing and laying plain cement concrete for flooring using cemenent concrete 1:5:10 for under floors complete after cinder filling to raise floor level by 6” etc complete as per design
Providing and laying 10-12mm thick plaster mortar 1:2:2 (1cement : 2 fine sand : 2 coarse sand) to all brick surfaces at all heights
Providing and fixing of 4” dia soil pipe
Providing and fixing of water supply pipe etc complete as per design.
|
1
|
Nos.
|
|
35
|
NS
|
UPVC Windows (Ground & First Floor) Providing and fixing of UPVC windows includes glass and specified hardware etc complete as per design
|
4
|
Nos.
|
|
36
|
NS
|
Wallpaper
|
220
|
Sft
|
|
37
|
NS
|
Potted plants
|
1
|
Nos.
|
|
38
|
NS
|
10mm Toughened Glass Railing with connectors in
Balcony
|
25
|
Rft
|
|
39
|
NS
|
Floor Lamp
|
1
|
Nos.
|
|
40
|
NS
|
Table/Study Lamp
|
1
|
Nos.
|
|
|
|
Total
|
|
|
1488485
|