As the manager of the environmental management plan of the project, Shangrao Sanqingshan Co., Ltd has the obligation to restrict the behaviors of the contractors of the project. The contract agreement includes the article of environmental protection, see appendix, and clear the relevant articles of punitive measures for violating the article of environmental protection.
Principles for punitive measures are:
(1) When the contractor has the conditions of violating the article of environmental protection during the construction, the client has the right to put forward a written warning and supervise the contractor to correct promptly and take remedial action. Before the contractor takes corrective action and obtains the confirmation of relevant environmental protection administrative department and the contractor, the client has the right to refuse to pay for residual contract payment. The contractor shall take responsibility for all expenses caused by remedial measures because the contractor violates the articles of environmental protection.
(2) The contract also shall take responsibility for the liability for damage because the contractor violates the articles of environmental protection in the contract.
6.11 Estimation of environmental protection costs
The environmental impact mitigation measure costs, monitoring costs and other costs in the environment management plan of “Jiangxi Shangrao Sanqingshan Airport Project” are shown in Table 7-1.
Table 6-11-1 Estimation Table of Environmental Protection Costs
Items
|
Name of project expenses
|
Rough estimate value (10,000 Yuan)
|
Environmental protection investment during the period of construction and operation
|
Sewage treatment
|
Sewage treatment system (project investment)
|
485
|
912
|
Water reuse system (project investment)
|
175
|
Rain and sewage pipeline network (project investment)
|
220
|
Waste water, waste sedimentation pond, latrines during the construction period
|
2
|
Oil water separator
|
30
|
Solid waste
|
Garbage temporary storage station (project investment)
|
10
|
Ground water
|
Oil depot area, groundwater monitoring wells of downstream of the sewage treatment plant
|
4
|
Ecology
|
Vegetation and afforestation recovery in the airfield, terminal area (project investment)
|
670.89
|
Forest vegetation recovery costs (already included in forestry researching investment)
|
721
|
Bird prevention facilities
|
183
|
Water conservation measures costs (already included in the water conservation investment)
|
231.97
|
Protection of plants (camphor) transplanting costs
|
541.61
|
Drainage works investment in the airport
|
Broadening reinforcing downstream gully lines of the airport outfall
|
440
|
Rural roads reconstruction costs
|
Reconstructing the blocked rural roads due to the construction of the airport
|
510.6
|
Environmental monitoring costs
|
Construction period
|
1.3
|
Operation period
|
4.6
|
Personnel training costs
|
Training for contractors and environmental specialists in the construction sites
|
6
|
Training for the environmental supervision engineers
|
9
|
Training for Sanqingshan Airport Limited and its environmental managers
|
3
| 7. Public Consultation and Information Disclosure
According to the requirements of nation and World Bank, there are two times of public consultation and two times of information disclosure for the Jiangxi Shangrao Sanqingshan airport. The main methods are to issue the project information to the public, particularly the affected people, in the regions with direct influence by this project, including the outline of environmental impact assessment, the first draft of the report of environmental impact assessment and environmental management plan, as well as the Environemntal Management Framework. After the public knows the situations, working group of environmental impact assessment visits the public, hold various public meetings, issue questionnaires to the public, collect their opinions, suggestions and requirements, and give feedback to them.
Share with your friends: |