7.2 Public consultation


7.2.1 The first time of public consultation

The first time of public consultation is carried out after the outline of environmental impact assessment and before the draft EIA, with the people in the regions with direct influenceof this project. This time of consultation is designed to introduce the project information and possible environmental impacts to the people affected by the project and learn their comments and concerns. Then the EA team holds various public meetings, issue questionnaires to the public, collect their opinions, suggestions and requirements. This period is from January 31st 2012 to February 2nd 2012. The statistics of questionnaires and survey result of the first time of public consultation sees appendix.

The conditions for the first time of public consultation see Figure 7-2-1.
Figure 7-2-1 Result of the first time of public consultation

Time

Place

Conference location for public consultation

Public information content

Participation public

Public problems and suggestion

Reply for public opinions

2012.1.31-2012.2.2

Zaotou town

Conference meeting on the 5th floor of the town government in Zaotou town of Shangrao

Conference meeting on the 3rd floor of the township government in Zunqiao town of Shangrao

Conference meeting on the 2nd floor of village committee of Tashui village of Maojialing street in Xinzhou district


Outline of environmental impact assessment;

Information announcement on project environmental protection management



Local people;

Representative of village committee, surrounding school, representative of seniors’ home

(118 people in total)


Local people, representatives from each group support the construction of the airport project, but they are worried about the potential environmental problems. The public think that the most serious environmental problems are noting in the construction period and operation period. Besides, there are also many people worry about the project construction and road construction may have bad impact on local transportation.

Sanqingshan airport Co., Ltd and the evaluation unit make a preliminary evaluation on the possible environment impact of the project. Consider the problems of noise and traffic inconvenience proposed by the public and based on the public’ opinions, the relevant problems shall take into account in the environmental impact assessment of airport. It also shall put forward the feasible prevention, retarding measure, guide and supervise the project contractor and the operating unit of airport to do environmental protection.

Xiangshan village

Tashui village

Zhoushi village

Zhouxu village

7.2.2 The second time of public consultation

The second time of public consultation is carried out after the draft EA is prepared, including the environmental management plan and environmental management framework to people in the regions with direct influence on this project, it is designed to introduce the latest project information and detailed environmental impacts and mitigation measures. This period is from September 29th 2012 to September 30th 2012. It adopts public meetings, interview with affected people on site, issue questionnaires to the public, collect their opinions, and suggestions. The statistics of questionnaires and survey result of the second time of public consultation sees appendix.


The conditions for the second time of public consultation see Figure 7-2-2
Figure 7-2-2 Result of the second time of public consultation

Time

Place

Conference location for publish consultation

Public information content

Participation public

Public problems and suggestion

Reply for public opinions

2012.9.29-

2012.9.30



Xiangshan village of Zaotou town

Conference meeting on the 5th floor of the town government in Zaotou town of Shangrao

Conference meeting on the 3rd floor of the township government in Zunqiao town of Shangrao

Conference meeting on the 2nd floor of village committee of Tashui village of Maojialing street in Xinzhou district


the first draft of the report of environmental impact assessment; environmental management plan; framework of environmental management plan

Representatives of village committee; villagers representative to attend the forum, visiting people

(99 people in total)



①whether the land expropriation compensation meets with the standards;

② Noise problem during the operation period of airport

③The irrigation problem after requisition the part ponds

④Blocking problem on country road

⑤Problem of installation and site selection by residents

⑥The public point out that some farmland and a pond are blocked in Tashui Xujia after the construction of airport, which brings inconvenience for farmers’ cultivation. It shall conduct the land acquisition and deal with the insurance of land for farmers



For the problems raised by the public, Sanqingshan Airport Co., Ltd promises that the land and pond requisition shall be in accordance with the national standard, The noise impact has been carefully considered, thus it can be mitigated by proposed measures; site selection of settlement and rural roads will not cuase environmental and traffic problems since they have been assessed and mitigation measures are effective.

Fujia village

Maowan village

Zhoushi village

Zhouwu village in Zunqiaoxiang

Tashui village

Cangding


Download 3.9 Mb.