In items (i) and (j), the word "Surface" or "Grooved" will be inserted in the first blank and the word "Profiled" or "NonProfiled" will be inserted in the second blank.
SP00867 (2015 Specifications: 11-13-14) (This Section requires SP00850.)
(Follow all instructions. If there are no instructions above a subsection, paragraph, sentence, or bullet, then include them in the project. The specifications may be modified to include project specific specifications, but all additions, deletions, or modifications must be sent to the ODOT Technical Resource and Senior Specifications Engineer for review and approval.)
Comply with Section 00867 of the Standard Specifications modified as follows.
00867.90 Payment – Add the following pay items at the end of the pay item list:
(s) Pavement Bar, Type ____ : Green Bike Lane Markings Square Foot
(t) Pavement Legend, Type ____ : “BIKE” Each
(u) Pavement Legend, Type ____ : Bicycle Sharrow Stencil Each
(v) Pavement Legend, Type ____ : Bicycle Positioning Stencil Each
(w) Pavement Legend, Type ____ : Bicycle Box Each
Delete the sentence beginning with "In items (a) through (r)…" and replace with the following:
In items (a) through (w), the type of pavement marking materials will be inserted in the first blank.
Add the following paragraphs after the paragraph that begins “Item (r) includes…”
Item (u) includes both the bicycle symbol and the chevron arrows placed directly above the bicycle symbol.
Item (v) includes the bicycle stencil and bars above and below the stencil.
Item (w) includes the bicycle symbol, arrow, background, and all of the bars the are required for the Bicycle Box detail as shown in the Plans.
SP00905 (2015 Specifications: 11-13-14)
SECTION 00905 - REMOVAL AND REINSTALLATION OF EXISTING SIGNS
(Follow all instructions. If there are no instructions above a subsection, paragraph, sentence, or bullet, then include them in the project. The specifications may be modified to include project specific specifications, but all additions, deletions, or modifications must be sent to the ODOT Technical Resource and Senior Specifications Engineer for review and approval.)
Comply with Section 00905 of the Standard Specifications.
SP00910 (2015 Specifications: 10-15-15) (This Section requires SP02190.)
SECTION 00910 - WOOD SIGN POSTS
(Follow all instructions. If there are no instructions above a subsection, paragraph, sentence, or bullet, then include them in the project. The specifications may be modified to include project specific specifications, but all additions, deletions, or modifications must be sent to the ODOT Technical Resource and Senior Specifications Engineer for review and approval.)
Comply with Section 00910 of the Standard Specifications.
SP00920 (2015 Specifications: 10-08-15) (This Section requires SP00440 & SP02560)
SECTION 00920 - SIGN SUPPORT FOOTINGS
(Follow all instructions. If there are no instructions above a subsection, paragraph, sentence, or bullet, then include them in the project. The specifications may be modified to include project specific specifications, but all additions, deletions, or modifications must be sent to the ODOT Technical Resource and Senior Specifications Engineer for review and approval.)
Comply with Section 00920 of the Standard Specifications modified as follows:
Add the following subsection:
00920.05 Shoring Plans, Calculations, and Construction Inspection – Submit stamped shoring plans and design calculations according to 00150.35 except as modified by this subsection.
Design shoring according to the ODOT Geotechnical Design Manual.
Submit a Shoring Design Summary and complete a Shoring Design Checklist prepared by the shoring design engineer, to accompany the plans and calculations. Include the following in the summary:
-
A list of shoring members with their capacities and design stresses.
-
Design loading assumptions for each member
-
Design specifications
-
Subsurface materials and conditions used in design
Complete the checklist included in the Special Provisions.
Submit five sets (nine sets if railroad approval is required) of the plans, and three copies (five copies of railroad approval is required) of the calculations, summary, and checklist.
The Engineer will provide a list of construction concerns at least 2 days prior to the shoring design engineer’s inspection. Upon completion of the shoring construction, the shoring design engineer of record, accompanied by the Engineer, shall field inspect the shoring. Do not continue construction until:
-
The shoring design engineer furnishes the Engineer a written statement that the shoring conforms to the design and will serve the intended purpose and;
-
The Engineer agrees in writing that all construction concerns have been addressed and the shoring will serve the intended purpose
00920.80 Measurement - Add the following to the end of this subsection:
(Use the following paragraph and table when minor sign supports are required. Obtain support types and quantities from the Designer.)
The estimated quantities of concrete for minor sign supports are:
Support Type Material Quantity
Triangular Base Breakaway
Sign Supports Concrete XX.X1 cu. yd.
(Use the following paragraphs and table when major sign supports are required. Obtain locations and quantities from the Designer. Copy list as necessary for additional locations. Delete what does not apply.)
The estimated quantities of materials for major sign supports are:
Location Material Quantity
US26 Deer MP 71.91 Excavation 22 13 cu. yd.
Backfill 7 4 cu. yd.
Temporary Shoring 155 sq ft. Concrete, Class 3300 15 cu. yd.
Reinforcement 2633 5589 pound
Miscellaneous Steel 2483 pound
I-84 E MP 3.55lephant Excavation 22 17 cu. yd.
Backfill 7 6 cu. yd.
Temporary Shoring 155 sq ft. Concrete, Class 3300 15 cu. yd.
Reinforcement 2633 5589 pound
Miscellaneous Steel 2483 pound
I-84 Hippopotamus Excavation 22 17 cu. yd.
Backfill 7 6 cu. yd.
Temporary Shoring 155 sq ft. Concrete, Class 3300 15 cu. yd.
Reinforcement 2633 5589 pound
Miscellaneous Steel 2483 pound
SHORING DESIGN CHECKLIST
Instructions - This shoring design checklist was developed to facilitate the design, review, and erection of shoring to be used for ODOT bridge construction projects. This checklist is intended to act as a reminder to design or check for specific important aspects of this construction. It is not a substitute for plan and/or design criteria or specification requirements.
The Checklist is to be completed and signed by the shoring design engineer. Answer every question. Attach to the Checklist an explanation of any negative responses.
Submit the Checklist according to 00510.04.
|
|
|
|
YES
|
NO
|
N/A
|
|
|
|
|
|
|
|
A.
|
Contract Plans, Specifications, Permits, etc.
|
|
|
|
|
|
|
|
|
|
|
|
|
1.
|
Are the shoring plans prepared, stamped, and signed by an engineer registered to practice in Oregon?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
2.
|
Have three copies (five copies if railroad approval is required) of the complete design calculations accompanied the shoring drawings submittal?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
3.
|
Are shoring plans in compliance with the requirements of the construction plans general notes?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
4.
|
Are shoring plans in compliance with contract plan structural details?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
5.
|
Are shoring plans in compliance with the requirements of the Oregon Standard Specifications for Construction, subsection 00150.35?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
6.
|
Are all existing, adjusted or new utilities in proximity with the proposed shoring shown on the shoring plans and is protection of these utilities addressed?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
7.
|
Are clearance requirements satisfied and shown on the shoring plans?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
B.
|
Loads
|
|
|
|
|
|
|
|
|
|
|
|
|
1.
|
Are the magnitude and location of all loads, equipment and personnel that will be supported by the shoring shown or noted on the shoring plans?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
2.
|
Are design loads and material properties used to determine design stresses shown for each different shoring member shown on the shoring plans?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
3.
|
Does the shoring design assume water saturated soil pressure acts on the full height of the shoring?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
4.
|
Has percolation into the excavation been addressed?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
C.
|
Allowable Stresses
|
|
|
|
|
|
|
|
|
|
|
|
|
1.
|
Have the design loads used for shoring design of all members been noted in the design calculations?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
2.
|
Are the allowable stress and the calculated stress listed in the summary for each different shoring member?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
D.
|
Timber Construction
|
|
|
|
|
|
|
|
|
|
|
|
|
1.
|
Are timber grades consistent with material to be delivered to the construction site and noted on shoring drawings and in accompanying calculations for all timber shoring material?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
2.
|
If "rough" lumber is specified for shoring by the shoring designer are the actual lumber dimensions used in calculations shown?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
E.
|
Steel Construction
|
|
|
|
|
|
|
|
|
|
|
|
|
1.
|
Are steel structural shapes and plates identified by ASTM number on the shoring plans and in the calculations?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
2.
|
Have steel beams been checked for bending, shear, web crippling and buckling of the compression flange?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
F.
|
Compression Members, Bracing, Members and Connections
|
|
|
|
|
|
|
|
|
|
|
|
1.
|
Has general buckling been evaluated for all compression members?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
2.
|
Has bracing been provided at all points of assumed support for compression members?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
3.
|
Is bracing strength and stiffness sufficient for the intended purpose?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
4.
|
Have all connections been designed and detailed?
|
|
____
|
____
|
____
|
_________________________ _______________
Designer's Signature Date
SP00921 (2015 Specifications: 12-10-15) (This Section requires SP02001)
Share with your friends: |