5.2.1 Range and standard of assessment
In accordance with Specification for Environment Impact Assessment of Highway, range of assessment of road construction’s noise impact refers to the range of 50m on the two sides of proposal items of road construction. Because the Project has been constructed as district, there are many sensitive points of noise environment within the range of 50m on the two sides of the road; therefore, key point of assessment on noise in construction period is the impact of noise in the construction period on noise environment. Its standard of assessment adopts Noise Standard on Construction Site (GB12523—90) , which provides noise limits on construction site in construction period as the following Table 5.2-1.
Table 5.2-1 Noise Standard on Construction Site (GB12523—90)
Unit: dB(A)
Construction Period
|
Main noise sources
|
Noise limits
|
Daytime
|
Nighttime
|
Earthwork
|
Bulldozer, excavator, pay loader etc.
|
75
|
55
|
Piling
|
Various piling machines etc.
|
85
|
It is not allowed to construct
|
Structure
|
Concrete mixer, vibrator, and electric saw etc.
|
70
|
55
|
Decoration
|
Crane, elevator etc.
|
65
|
55
| 5.2.2 Investigation on noise intensity of construction equipment
There are various mechanical equipments used in road construction. According to actual investigation and comparative analysis, main mechanical equipments used in construction include excavator, bulldozer, grader, concrete mixer, road roller, pay loader and spreader etc. Noise values produced by construction mechanical equipments in operating period are listed in table 5.2-2.
Table 5.2-2 Noise values of various construction mechanical equipments Unit: dB(A)
S/N
|
Type of Machinery
|
Distance from measuring point to construction equipment (M)
|
Lmax
|
1
|
Wheel Loader
|
5
|
90
|
2
|
Grader
|
5
|
90
|
3
|
Vibratory Roller
|
5
|
86
|
4
|
Two-Wheel Double-Vibration Roller
|
5
|
81
|
5
|
Tri-Wheel Roller
|
5
|
81
|
6
|
Wheel Roller
|
5
|
76
|
7
|
Bulldozer
|
5
|
86
|
8
|
Hydraulic Wheel Excavator
|
5
|
84
|
9
|
Spreader
|
5
|
87
|
10
|
Generator
|
5
|
98
|
11
|
Truck
|
5
|
92
|
12
|
Concrete Mixing Truck
|
5
|
91
|
13
|
Concrete Pump
|
5
|
85
|
14
|
Mobile Crane
|
5
|
96
|
15
|
Pneumatic Hammer And Rock Drill
|
5
|
98
|
16
|
Vibrator
|
5
|
84
|
17
|
Pneumatic Wrench
|
5
|
95
| 5.2.3 Forecasting result of noise
Noise sources of construction of the Project can be disposed as point noise source appreciatively. According to damping mode of noise from point noise source, noise values within different distance from noise source in construction period can be estimated, as the following forecasting mode:
In the arithmetic formula : -- Forecasting value [dB(A) ] of construction noise within the distance of r m from noise source;
--Reference noise level [dB(A) ]within the distance of m from noise source
According to noise value of various construction machineries, forecasting noise value of different construction machineries within different distances can be calculated. See the following Table 5.2-3.
Table 5.2-3 Forecasting noise value of different construction machinery within different distances
Distance (M)
Equipment
|
5
|
10
|
20
|
40
|
50
|
Standard value
|
Superstandard situation
|
Daytime
|
Nighttime
|
Daytime
|
Nighttime
|
Wheel loader
|
90
|
84
|
78
|
72
|
70
|
75
|
55
|
Reach the standard
|
15
|
Grader
|
90
|
84
|
78
|
72
|
70
|
75
|
55
|
Reach the standard
|
15
|
Vibratory Roller
|
86
|
80
|
74
|
68
|
66
|
75
|
55
|
Reach the standard
|
11
|
Two-Wheel Double-Vibration Roller
|
81
|
75
|
69
|
63
|
61
|
75
|
55
|
Reach the standard
|
6
|
Tri-Wheel Roller
|
81
|
75
|
69
|
63
|
61
|
75
|
55
|
Reach the standard
|
6
|
Wheel Roller
|
76
|
70
|
64
|
58
|
56
|
75
|
55
|
Reach the standard
|
1
|
Bulldozer
|
86
|
80
|
74
|
68
|
66
|
75
|
55
|
Reach the standard
|
11
|
Hydraulic Wheel Excavator
|
84
|
78
|
72
|
66
|
64
|
75
|
55
|
Reach the standard
|
9
|
Spreader
|
87
|
81
|
75
|
69
|
67
|
75
|
55
|
Reach the standard
|
12
|
Generator
|
98
|
92
|
86
|
80
|
78
|
75
|
55
|
3
|
23
|
Truck
|
92
|
86
|
80
|
74
|
72
|
75
|
55
|
Reach the standard
|
17
|
Mobile Crane
|
96
|
90
|
84
|
76
|
74
|
65
|
55
|
9
|
19
|
Pneumatic Hammer And Rock Drill
|
98
|
92
|
86
|
80
|
78
|
75
|
55
|
3
|
23
|
Vibrator
|
84
|
78
|
72
|
66
|
64
|
70
|
55
|
Reach the standard
|
9
|
Pneumatic Wrench
|
95
|
89
|
83
|
77
|
75
|
75
|
55
|
Reach the standard
|
20
|
Concrete mixer
|
80
|
74
|
68
|
62
|
60
|
75
|
55
|
Reach the standard
|
5
|
Concrete transfer pumping
|
85
|
79
|
73
|
67
|
65
|
75
|
55
|
Reach the standard
|
10
|
According to forecasting results in Table 5.2-3, in construction period of the Project, noise exceeds 3~9dB(A) over the standard regulated Noise Standard on Construction Site (GB12523—90) in the daytime; in the nighttime, it also exceeds 1~23dB(A) over the standard. It is obvious that noise produced by construction will bring about impact within the range of 50m around the construction site, especially in nighttime.
5.2.4 Assessment of noise during construction period
According to forecasting result of **, during construction period of the Project, noise exceeds 3~9dB(A) over the standard regulated Noise Standard on Construction Site (GB12523—90) in the daytime; in the nighttime, it also exceeds 1~23dB(A) over the standard. It is obvious that noise produced by construction will impact within the range of 50m around the construction site, especially in nighttime. Therefore, strict measures must be taken to relieve impact caused by noise on surrounding environment in construction of the above-mentioned regions.