Open Systems Manager (Front Cover)



Download 0.88 Mb.
View original pdf
Page48/88
Date24.01.2022
Size0.88 Mb.
#58120
1   ...   44   45   46   47   48   49   50   51   ...   88
Open Systems Manager
Required Setting
J1 1-2
open
2-3
short
J2 1-2
short
2-3
open
J3 1-2
short
J4 1-2
open
J5 open 5-6 J open 5-6 J 1-2
open
2-3
short
J8 1-2
open
2-3
short
J9 1-2
open
J10 1-2
short
J11 1-2
open
J12 1-2
open
J13 1-2
open
2-3
short
J14 1-2
open
2-3
short
J15 1-2
open
2-3
short
J16 1-2
open
J17 1-2
open
J18 1-2
short


INSTALLATION
OPEN SYSTEMS MANAGER INSTALLATION - 12
WBPEEUI350001B0
®
INESM01 ADAPTER BOARDS
There are three adapter boards attached to the ESM module:
video, Ethernet and SCSI adapters. The jumpers are set on these boards when they are installed on the ESM module in the factory. Table
3-3
lists the required adapter board jumper settings. Figures
3-10
through
3-12
show the layouts of the adapter boards. Figure
3-13
shows how the adapter boards mount on the ESM module. Verify that the adapter boards are in place before installing the ESM module.
Figure 3-9. INESM01 Circuit Board Layout
T00570A
D1
D2
D3
D4
STATUS
HD
L1
L2
P7
SW1
P4
SW0 1
1 1
1 1
1 1
1
J10
J3
J4
J7
J9
J12
J13
J1
J2
J8
J11
J5
J6
J17
J16
J18
J15 J14
P1
P3
P2
COM1
STOP
KEYBD
RESET
2 7
8 2
7 OPEN 2 3 4 5 6 7 8
SW2
Table 3-3. Adapter Board Jumper Settings
Adapter Board
Jumper
Jumper Setting
Required Setting
Ethernet
J1 1-2
short
3-4
open
5-6
open
J2 1-2
short
3-4
open
5-6
open
J3 1-2
short
3-4
open
5-6
open
7-8
open
SCSI
J1 open J open 5-6


INSTALLATION'>INSTALLATION
OPEN SYSTEMS MANAGER INSTALLATION
WBPEEUI350001B0 3 - 13
SCSI
(continued)
J3 1-2
open
3-4
open
5-6
short
7-8
open
J4 1-2
short
J5 1-2
open
2-3
Video
J1 1-2
open
2-3
Table 3-3. Adapter Board Jumper Settings
(continued)
Adapter Board
Jumper
Jumper Setting
Required Setting
Figure 3-10. Ethernet Adapter
Circuit Board Layout
Figure 3-11. SCSI Adapter
Circuit Board Layout
P1A
P1B
P3
U1
J1
J2
J3
T00574A
1 1
1 1
1 1
2 8
7 2
6 5
2 6
5
P1A
P1B
P3
U1
J1
J5
J2
J3
T00575A
1 1
1 1
1 1
1
J4
F1 2
8 7
2 5
6 6
5 2


INSTALLATION
OPEN SYSTEMS MANAGER INSTALLATION - 14
WBPEEUI350001B0
®
MODULE INSTALLATION
To install the INESM01 module. Verify that jumper J has been properly installed. Verify that the adapter boards are in place. Guide the top and bottom edges of the circuit board along the top and bottom rails of its assigned MMU slot (Figure. Slide the module partway into the MMU slot. Cable connections from the disk drive module and SCSI connector module are required before securing the module in the MMU unit. Proceed to Disk Drive Module Installation to connect cables from the disk drive module to the ESM module.
Disk Drive Module Installation
The disk drive module (DDM) is shipped with the required cables and is ready to install. Before installing the module,
verify that the cable connections are secure. Figure shows the disk drive module circuit board layout.
To install the disk drive module. Guide the top and bottom edges of the circuit board along the top and bottom rails of its assigned MMU slot ( Figure. Slide the module partway into the MMU slot.
3. Connect the ribbon cable from the P connector on the
DDM module to the P connector on the ESM module.
Figure 3-12. Video Adapter
Circuit Board Layout
P1
P2
U1
P4B
P4A
U2
U3
J1 1
2 3
T00573A


INSTALLATION
OPEN SYSTEMS MANAGER INSTALLATION
WBPEEUI350001B0 3 - 15 4. Connect the ribbon cable from the P connector on the
DDM module to the P connector on the ESM module. Slide the ESM and DDM modules into the mounting slots. Proceed to SCSI Connector Module Installation.
Figure 3-13. INESM01 Adapter Board Mounting
T00581A
P1
P3
P2
P1
P2
U1
P4B
P4A
U2
U3
J1 1
2 3
P1A
P1B
P3
U1
J1
J5
J2
J3 1
1 1
1 1
1 1
J4
F1
P1A
P1B
P3
U1
J1
J2
J3 1
1 1
1 ETHERNET BOARD
GRAPHICS BOARD
SCSI BOARD
INESM01


INSTALLATION
OPEN SYSTEMS MANAGER INSTALLATION - 16
WBPEEUI350001B0
®

Download 0.88 Mb.

Share with your friends:
1   ...   44   45   46   47   48   49   50   51   ...   88




The database is protected by copyright ©ininet.org 2024
send message

    Main page