Nomination of Project Ideas


CoCC engineers and planners developed their prospective projects by assessing gaps and identifying future needs. The CoCC PIUCC met to discuss and approve the project ideas. Classification of infrastructure and components shown in Tables 4-2 to Table 4-7 are given by LGED.

        1. Transport


Table 4‑17: Summary of Existing and Proposed Infrastructure (Transport)

No.

Name of Component

Project Type

Unit

Comilla City Corporation

Existing Quantity

Proposed

(Additional)

Quantity

Proposed Tentative Cost (Crore)

New

Improved

1

Road

Primary Road (100 ft to 150 ft)

km

43.00

0.00

13.00

13.00

Second Road (60 ft to 100 ft)

km

10.00

0.00

5.00

4.00

Tertiary Road (20 ft to 60 ft)

km

130.00

0.00

90.00

74.25

Goli Road6 (12 ft to 20 ft)

km

249.00

0.00

74.25

99.08

Pedestrian (6 ft to 8 ft)

km

50.00

0.00

0.00

0.00

Total Road Length

km

482.00

0.00

182.25




2

Bridge / Culvert

Bridge

#

60

12

0

7.43

Pedestrian Overpass

#

Nil

1

0

10.00

Flyover

#

Nil

1

0

50.00

Under pass

#

Nil

1

0

25.00

Culvert

#

279

0

20

0.80

3

Traffic Management

Traffic Signal/Signs

#

0

8

0

8.00

Divider / Island

km

1.00

15.00

0

0.45

Road Marking

km

2.00

41.00

0

0.15

4

River Boat Landing

River Boat Landing

#

0

0

0

0.00







Total Sector Cost













292.16

Source: CoCC


        1. Drainage


Table 4‑18: Summary of Existing and Proposed Infrastructure (Drainage)

No.

Project Type

Unit

Comilla City Corporation

Existing Quantity

Proposed (Additional)

Quantity

Proposed Tentative Cost (Crore)

New

Improved

1

Khal /Canal/ Outfall Drain

km

40.00

0.00

34.00

5.33

2

Primary Drainage

km

0.00

0.00

0.00

0.00

3

Second Level Drainage

km

37.00

37.00

0.00

45.00

4

Third Level Drainage

km

140.00

83.00

100.00

175.00

5

Cleaning Blockage

km

10.00

0.00

10.00

5.00

6

Re-sectioned Outfall (Earth)

km

0.00

0.00

0.00

0.00

7

Total Drain Length & Sector Cost




217.00

120.00

134.00

230.33

Source: CoCC

        1. Solid Waste Management (SWM)


Table 4‑19: Summary of Existing and Proposed Infrastructure (SWM)

No.

Project Type

Unit

Comilla City Corporation

Existing Quantity

Proposed

(Additional)

Quantity

Proposed Tentative Cost (Crore)

New

Improved

1

Transfer Station

#

7

27

0

0.81

2

Dumping Ground/Landfill Site

#

1

2

1

10.00

3

Compost Plant

#

0

1

0

0.50

4

Roadside Movable Dustbin

#

0

60

0

3.00

5

Solid Waste Recycle Plant (3R)

#

0

1

0

25.00

6

Electric Waste Disposal

#

0

0

0

0.00

7

Medical Waste Disposal

Ton

2.00

1.00

0.00

0.50

8

Electronic Waste

Ton

0.20

1.00

0.00

0.12

9

Biogas Plant

#

0.00

5.00

0.00

0.15




Total Sector Cost













40.08

Source: CoCC

        1. Water Supply System (WSS)


Table 4‑20: Summary of Existing and Proposed Infrastructure (WSS)

No.

Project Type

Unit

Comilla City Corporation

Existing Quantity

Proposed (Additional)

Quantity

Proposed Tentative Cost (Crore)

New

Improved

1

Production Well (PTW)

#

23

52

20

27.00

2

Surface Water Treatment Plant

#

-

1

0

12.00

3

Overhead Tank (OHT)

#

6

13

4

15.70

4

Distribution Network

km

146.00

300.00

80.00

130.00

5

Hand Tube Well

#

100

360

20

2.00

6

Public Stand Pipe (Street Hydrant)

#

300

0

0

0.00

7

Metering (Domestic and Bulk Meter)

#

-

-

-

0.00

8

Iron and arsenic removal plants for water quality

#

-

2

-

10.00

9

Rainwater Harvesting

#

-

-

-

0.00




Total Sector Cost













196.70

Source: CoCC

        1. Sanitation


Table 4‑21: Summary of Existing and Proposed Infrastructure (Sanitation)

No.

Project Type

Unit

Comilla City Corporation

Existing Quantity

Proposed

(Additional)

Quantity

Proposed Tentative Cost (Crore)

New

Improved

1

Slaughter House

#

1

3

1

5.40

2

Twin Pit Latrine

#

5,000

8,000

0

2.40

3

Single Pit Latrine

#

500

0

0

0.00

4

Public Toilet

#

12

5

8

3.50

5

Wash Station

#

Nil

1

0

100.00

6

Transfer Station for Sludge Disposal

#

Nil

0

0

0.00

7

Common Septic Tank

#

Nil

10

0

0.80

8

Wastewater Treatment Plant (Drain)

#

Nil

0

0

0.00




Total Sector Cost













112.10

Source: CoCC

        1. Municipal Facilities, Streetlight & Beautification



Table 4‑22: Summary of Existing and Proposed Infrastructure
(Municipal Facilities)


No.

Component

Project Type

Unit

Comilla City Corporation

Existing

Quantity

Proposed (Additional)

Quantity

Proposed Tentative Cost (Crore)

New

Improved

1

Bus Terminal

Terminal building, platform and internal drainage

#

2

1

2

16.50

2

Truck Terminal

Terminal building, platform and internal drainage

#

-

1

-

20.00

3

Vehicle Parking

For motor vehicles, CNG vehicles, and rickshaw

#

-

15

-

1.80

4

Market

Kitchen markets and super market

#

5

2

3

45.00

5

City Corporation Office Building

CC main office, community center and ward office

#

2 main offices +
0 branch offices

1 main office + 2 branch offices

0

54.00

6

Auditorium, Public Hall, Cultural Center

Auditorium, public hall and cultural center

#

0

3

0

50.00

7

Open Space

Park, ground

#

1

1

1

5.50

8

Street Light (Light and Pole)

Light, pole, and solar panel

#

5,000

7,358

5,000

62.48

9

Landscaping and Beautification

Planting, water body improvement, and monuments

#

-

1

-

20.00

10

Graveyard

Gates, walls, lighting, and drainage

#

15

2

15

15.00

11

Sports Facility

Gyms and stadiums

#

0

2

0

20.00

12

Upgrading Informal Settlement

Rearrangement of informal shops

#

0

0

0

0.00




Total Sector Cost













310.28

Source: CoCC

The cumulative cost for subprojects identified in Tables 4-2 to 4-7 is 1181.65 Crore BDT.