SECTION 3: ANTICIPATED IMPACTS OF THE PROPOSED ACTIVITY

1.10impacts related to the input/outputs of the life cycle phases


Section 2 summarise the inputs and outputs for each phase of the Plant’s life. The in- and output tables, in turn, were used to develop the impact tables, Table 12 to Table 16 for each of the life cycle phases.

These impacts are evaluated and assessed for their effects on the affected (receiving) environment in Chapter 4.

Table 12: Construction Phase : Input/Output Related Impacts (Duration 24 Months)

Input

Impact




Output

Impact

Excavation




Stockpiling of spoil material

Displacement of fauna & flora (f & f)

The module

Surface disturbance and displacement of fauna and flora.







Service trenches

Temporary displacement of fauna and flora (f & f)







Dewatering of excavation until Module construction has advanced to surface level

Temporary localised change in water table depth

Saline effluent released to the sea

Nil

Building materials supplied from commercial sources

Accelerated production at mines/supply sources

Increased traffic

Risk of accidents

Construction equipment

Capital expenditure, employment

Energy expenditure

Noise, dust and emissions and maintenance waste


Construction works

Temporary disruption of the biophysical environment. Construction waste & Domestic waste

Capital

Stimulation of economy on a local to international level

Completed module

Visual (aesthetics)

Employment










Construction

Housing requirements

Service requirements (materials, water, sewage, telecoms, energy, schools, health etc). Emergency Plan (EP) for Koeberg.



Temporary/Permanent stimulation of economy

Improved levels of income

Change to Koeberg Emergency Plan


Communicable disease.

Capacity of service provides and facilities e.g. Authorities, professional and commercial capabilities



Component manufacturing







Stimulation of the local/regional economy.

Transmission upgrades

Localised construction activities

Linkage to the national grid for supply and demand

Increased reliability of the network

Table 13: Commissioning Phase : Input/Output Related Impacts (Duration 6 Months)

Input

Impact




Output

Impact

Cold Commissioning













Nitrogen gas

Nil




Assurance MPS integrity assurance

Nitrogen Helium emissions

Energy (Electricity)

Use of energy for non production




Operate the turbo compressor(s) and drive the helium cycle.

Nil

Sea water

Nil




Thermal sea water @1.7m3/s

and a delta temp of 40°C



Hot water plume within the near shore marine environment that may affect the F & F.

Potable water

Use of additional fresh water resource(s)




Water for human consumption and use; Water for the intermediate cooling cycle & Demineralised water.

Effluent Domestic

Labour

Increased levels of permanent employment




Increase in income and stimulus to local economy

Increased demands on local services and facilities (professional, commercial and authority capacities)

Hot Commissioning













Fuel spheres

Special safety and security measures for fissile material.




Heat that is employed to generate electricity.

Operation of the Plant.



Spent fuel that contains HLRW.

Radioactive waste LLW & ILW



Graphite

Nil




Moderation to the nuclear fission reaction

Radioactive waste

LLW & ILW



Helium Gas

International purchases of Helium gas.




Reactor coolant and turbine drive fluid

Helium emissions

Impacts 3, 4 & 5 above







As above

As above

Protective Clothing/Equipment Replacement parts

Nil




Radioactive Waste emissions, Effluents, Solid Wastes

Radioactive and inert wastes

Table 14: Operational Phase : Input/Output Related Impacts (Duration 40 Years)

Input

Impact




Output

Impact

Nuclear fuel spheres

Safety (radiological) and security




Heat that is converted to produce electricity.

Spent fuel

Graphite

Nil




Moderation of the nuclear reaction

Radioactive waste

Helium Gas

Outflow of currency since it due to importation




Reactor coolant and medium to drive the turbine generator.

Gaseous emissions (Helium)

Production of electricity



Sea water

Nil




Thermal sea water @ 1.7m3/s at a delta temperature of 40°C.

Hot water plume in the near shore marine environment that may affect the fauna and flora

Potable water

Additional use of fresh water resource(s)




Water for human consumption and use. Water for the intermediate cooling cycle & demineralised /decontamination water.

Domestic effluent

Radioactive effluents



Labour

Increased levels of permanent employment




Increase in income and stimulus to local economy

Used protective clothing



Increased demands on local services and facilities (professional, commercial and authority capacities).

LLRW


Maintenance













Filters

Expenditure




Replaced filters will contain radioactive substances

LLW & ILW that require management and security.

Replacement Parts

Expenditure




Scrap (radioactive and non-radioactive)




Environmental monitoring

Nil

Data on Environmental quality

Assurance on public/ environmental safety

Table 15: Decommissioning Phase : Input/Output Related Impacts (Duration About 1 Year)

Input

Impact




Output Direct

Impact

Energy (Electricity)

Non productive use of energy




Operation of the cooling system for the spent fuel

Expenditure

Sea Water

Nil




Indirect cooling of the spent fuel storage area

Thermal outflows to the sea

Labour (reduced)

Employment loss





Retrenched/pensioned/redeployed staff

Local economics may/can suffer

Finance

Non productive expenditure




Safeguarding society against nuclear accidents

Assurance to public safety

Replacement parts

Expenditure




Securing the integrity of the Plant

Assurance to public safety &

Scrap (non- and irradiated)



Environmental Monitoring

Nil




Securing environmental data on environment and human health

Assurance on public/ environmental safety

Table 16: Dismantling Phase: Input/Output Related Impacts (Duration 1 – 2 Years)

Input

Impact




Output

Impact

Energy

Electricity



Non productive use of energy

Operation of coolant systems for the spent fuel storage area

Expenditure

Liquid Fuels

Expenditure

Operation of construction equipment

Emissions

Labour

Influx of people to the area

Temporary stimulation of the economy

Capacity of services

Construction equipment

Expenditure




Dismantling of equipment and building structures

Noise, dust, emissions, waste

(non & irradiated)



Sea water (cooling)

Nil




Indirect cooling of the spent fuel storage area

Thermal effluent

Potable Water

Natural Resource use




Water for: Human consumption and Decontamination

Effluent and Radioactive Liquid waste

Environmental Monitoring

Nil

Data on environmental quality

Assurance to public on environmental /human safety

Clean up of MPS and Reactor

Radioactive waste

Non radioactive waste



Secured and safe Plant

LW, ILW and HLW