Proposed position


Name of assignment or project



Download 98.38 Kb.
Page65/76
Date04.03.2021
Size98.38 Kb.
#55993
1   ...   61   62   63   64   65   66   67   68   ...   76
Sam's CV (current as of Aug 2019) Envi Only
Name of assignment or project: Environmental Impact Assessment of Salcon Coal Power Plant

Year: 2004

Location:

Client: TEST Consultants, Inc/ Salcon Power Corporation/ DENR-EMB

Main project features: The Project will entail stabilization of existing ash pond, earthmoving to make way for the expansion and construction of new power plant facilities and coastal protection measures. The project involved the preparation of the necessary EIS document for the procurement of the ECC for the said power plant.

Position held: Lead Environmental Inland and Coastal Hydrologist


Download 98.38 Kb.

Share with your friends:
1   ...   61   62   63   64   65   66   67   68   ...   76




The database is protected by copyright ©ininet.org 2024
send message

    Main page