Enclosure 12: Defense Business Systems (DBS) • DBS Requirements • DBSs generally do not employ JCIDS procedures for the development/validation of requirements documents • Documentation required in the DBS Problem Statement suffice • DBS Phase Requirements • Business capability definition precedes the MDD • Analyzes the problem, capability gap, or opportunity • Documents results in a Problem Statement • Problem Statement – used as the requirements document for DBS • Prepared and reviewed by the IRB. Approved by the IRB Chair and provided to the MDA 30 days before the MDD. 54