The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page15/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   11   12   13   14   15   16   17   18   ...   82

1.2Site 2




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

2




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey

22/02/11

1

Name of dumpsite

Southeast Lokbatan settlements

2

Coordinates

40 19 25.5

49 45 08.3



3

Settlements which use the dumpsite

Lokbatan

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Garadagh municipality

5

General description of the situation in the dumpsite

The dumpsite extents at both sides of the road and along the nearby lake at the distance of 500 m

6

Total years of operation of the dumpsite

3 years

7

Date of initiation

2008

8

Date of closure

Operating

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

50 m x 30 m = 1,500 m2

11

Type of waste disposed (define with percentages)

95% household waste, 5% construction and rubble. (M)

12

Municipal waste, wastewater treatment sludge, sewage water

Only municipal waste

13

Inert and bulky

Yes

14

Green and agricultural

No

15

Medical waste, toxic waste, slaughter house waste

No

16

Other (describe)

Bulky rubble

17

Total volume (m3)

1500 m2 x 0.25 m = 375 m3

18

Total quantity (tn)

120 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Dispersion, no cover, sometimes auto-ignited

20

Quantity of gas generated

No gas

21

Bedrock (main formation)

Productive aquifer strata of middle Pliocene : sand with silt and rare intercalations of clays

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Flat area next to a lake with formation waters

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

No capping

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

< 2 m

26

Site Distance from:

R

27

Settlements, schools, working places

50 m, 760 m , 270 m

28

Stream with permanent flow

No

29

Forest

No

30

Agricultural activities, pastures

No

31

Wells / boreholes

No

32

Sea shore

3 km

33

Other (describe)

2 km from New Sederek Trade Centre

34

Existing infrastructure

South east residential area with gas, and supply of potable water pipes and sewerage

35

Fencing

No

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

Industrial premises at a distance of 300 m

40

Nuisances and Hazards

Yes

41

Odors and dust

Yes

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

Yes

44

Fires

Randomly

45

Rainfall values (<100mm, 100-200mm, >200mm)

100 – 250 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 10 yrs

48

Use of the receptor (no use, irrigation, drinking-recreation)

Aquifer with no use

49

Sensitivity of the receptor (low, medium, high)

Medium

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Medium

51

Other information

Degraded landscape to trade center visitors




Photograph 2: Site 2


Download 4.64 Mb.

Share with your friends:
1   ...   11   12   13   14   15   16   17   18   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page