The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page17/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   13   14   15   16   17   18   19   20   ...   82

1.4Site 4




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

4




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey

22/01/11

1

Name of dumpsite

Lokbatan 1 km towards the north eastern direction

2

Coordinates

40 20 21,6

49 45 33,0



3

Settlements which use the dumpsite

Illegal gathering of waste from the wider area of Lokbatan village

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Garadagh

5

General description of the situation in the dumpsite

Lokbatan village and its settlements co-disposing

6

Total years of operation of the dumpsite

10

7

Date of initiation

2001

8

Date of closure

Still operating

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

200 m x 150 m = 30,000 m2

11

Type of waste disposed (define with percentages)

90% household waste, 10 construction and demolition solid waste and debris. (M)

12

Municipal waste, wastewater treatment sludge, sewage water

Municipal

13

Inert and bulky

No

14

Green and agricultural

No

15

Medical waste, toxic waste, slaughter house waste

No

16

Other (describe)

Illegal shorting of municipal waste takes place

17

Total volume (m3)

30,000 m2 x 1 m = 30,000 m3

18

Total quantity (tn)

10,000 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Dispersion and incineration

20

Quantity of gas generated

Small quantities

21

Bedrock (main formation)

Productive aquifer strata of middle Pliocene : sand with silt and rare intercalations of clays

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Flat area near a very small lake

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

No capping

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

<2 m

26

Site Distance from:

I

27

Settlements, schools, working places

Isolated site far from settlements schools and working places

28

Stream with permanent flow

No

29

Forest

No

30

Agricultural activities, pastures

No

31

Wells / boreholes

10 m from oil pumping wells

32

Sea shore

4,5 Km

33

Other (describe)

Oil spills

34

Existing infrastructure

No

35

Fencing

No

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

Among the 15 largest dumpsites

40

Nuisances and Hazards

Yes

41

Odors and dust

Yes

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

Yes

44

Fires

Yes

45

Rainfall values (<100mm, 100-200mm, >200mm)

100-250 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 50 yrs

48

Use of the receptor (no use, irrigation, drinking-recreation)

No use

49

Sensitivity of the receptor (low, medium, high)

Medium

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Fires, smokes and gas. Pollution of receptors medium

51

Other information

Continuous auto ignition and burning of waste




Photograph 4: Site 4


Download 4.64 Mb.

Share with your friends:
1   ...   13   14   15   16   17   18   19   20   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page