The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page9/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   5   6   7   8   9   10   11   12   ...   82

Table 4.1. Characterization of landfills and unauthorised dump sites closure projects’ impact as the function of weak points


During the next process, the recommendations were prepared for the project activities regarding the closure of unauthorised dump sides in the Greater Baku area based on the discussions held between the representatives of “Tamiz Shahar” OJSC and HPC-PASECO Ltd Company, Advisor for “Designing of the rehabilitation and/or closure of facilities designed for making the wastes in the Greater Baku area including the Balakhany landfill harmless”. When preparing the recommendations, besides the environmental issues the economic criteria (expenditure) that is one of the main factors for the project sustainability were also taken into account.

4.3. THE ENVIRONMENTAL IMPACT ASSESSMENT

In this section are given:


a. the results of assessment of the current condition of UDS impact on the environment and

b. impact of the planned project activities on the environment

4.3.1. Assessment of unauthorised dump sites impact on the environment
4.3.1.1. Introduction

Destruction of solid waste in the open landfills is a general primitive procedure and at the first sight is considered to be a profitable economic alternative. But this procedure requires very high ecological expenses regarding safe waste management.


The population living close to the project site and neighbouring area is exposed to heavy social and health risks. The following is included in the environmental problems of general character related to the open dump sites:


  • Impact Regarding the Air Contamination: atmosphere contamination as a result of waste decay and waste incineration (CH4, CO, CO2, NOx, SO2, as a result of stink, other gases including dioxine emissions). Emission of toxic gases as some industrial wastes are also observed to be disposed to these site.




  • Social Impacts and Impacts on Health: spread of infection circulators from the sanitary point of view (parasites, breathing and contacts of waste with skin increase a risk of transmissible diseases, gas and aerozol emissions can cause serious health problems). These impacts can increase due to the availability of pathogene and dangerous microbes. When moving (in the transport) deterioration of existing roads and transports also create negative impacts. The availability of places where a poor strata of population lives and which are mainly not far from the waste sites (unofficial workers live in inadequate places and are engaged in collecting selected waste, child labour is also used here, the working condition is very bad and the income is nor enough to cover the necessary requirements). Also, high risks are available regarding nutrition and sanitary. All these problems are also directly connected with poverty and unemployment.




  • Impact on Water Quality. Generation and dispersion of effluents from water masses. Contamination of surface and ground water.




  • Impact on Ground: Contamination of ground due to disposal and incineration of waste not in properly managed way.

  • Impact on Landscape: Spreading of waste in large areas affect the landscape of those areas.




  • Impact on Flora and Fauna: Improper management of waste, its disposal in the areas has a negative impact on the surrounding areas, natural residential environment, natural water basins and ground water zones thus affecting fauna and flora.

4.3.1.2. Results of assessment of UDP impact on the environment


First of all, 99 important dump sites were examined by ACEP Company in the Greater Baku area. PIU was regularly informed about the results of the field researches. Researches were carried out in close coordination with the Ecological Department of “Tamiz Shahar” OJSC.
As the initial research results, a catalogue of dump sites and an electronic map of dump sites dislocation were prepared. The initial information was discussed with the representatives of HSE Company.
During the project implementation period, “Tamiz Shahar” OJSC cleaned 32 dump sites. For this reason, further assessment activities covered only 67 unauthorised dump sites.



District

Number of dumpsite

Quantity of sites

Binagadi

5, 6, 7, 10, 11, 12, 46, 47, 48, 58, 61, 63,

12

Khazar

19, 20, 21, 22, 23, 25, 55, 56, 57, 60, 62, 67, 71

13

Khatai

17, 18, 73

3

Garadag

1, 2, 3, 8, 9, 32, 33

7

Narimanov

29, 30, 31

3

Nesimi

-

0

Nizami

--

0

Sabunchu

27, 28, 40, 41, 42, 49, 50, 51, 52, 59, 65, 66, 69, 72, 75, 76, 77, 78

18

Sabail

64

1

Surakhany

13, 14, 16, 53

4

Yasamal

34, 35, 36, 37, 38, 39

6

Total:




67

Landfill types identified according to the types of the placed waste are mentioned below:




  • 26 areas contain solid waste mainly

  • 22 areas contain domestic waste

  • 5 areas contain domestic and industrial waste

  • In 2 areas waste composition was not identified because they were covered

During the next process, the risk assessment work at dump sites was carried out jointly with the representatives of HSE Company that had prepared the Feasibility Study Report for closing unauthorised dump sites.


From the point of view of the risks created by dump sites for the human health and environment their dividing into categories and ranging for the rehabilitation were done after the treatment of the survey results. The risk assessment was analysed for the dump sites covering an area more than 200 m2.
The risk assessment was carried out with the participation of ACEP Company representatives based on criteria shown below for each site:


  • Specific criteria for each dump site (distance to the nearest water supply source, the depth of waste filling, distance to the critic natural environment as swamp and protected forest, distance to surface water places, distance to the nearest village during the windy whether, public sympathy, etc.)

  • Criteria for waste characteristics at dump sites

  • Approximate calculation of time for the rehabilitation (time required for covering or disposal),

  • Environmental impact of dump sites

The results of reports6 prepared for each dump site by HPC-PASECO Ltd Company with the participation of ACEP specialists regarding UDS risk assessment are given in Annex 3.


The final results of risk assessment prepared taking into account the closure criteria for each dump site by HPC-PASECO Ltd Company are given in Table 4.2
Table 4.2. Risk ranking of unauthorized dump sites


No.

Name of dumpsite

Settlements which use the dumpsite

1) Groundwater Risk Ranking:

2) Surface Water Risk Ranking for Small Landfills:

3) Gas Risk Ranking:

4) Surface Contact Risk Ranking:

Overall characterisation



Lokbatan ravine

East Lokbatan settlements

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk



Southeast Lokbatan settlements

Lokbatan

Low Risk

Medium Risk

Low Risk

High Risk

High Risk



Lokbatan 1 km towards the north eastern direction

Illegal gathering of waste from the wider area of Lokbatan village

Low Risk

Low Risk

Medium Risk

High Risk

High Risk



Khodjasan, former Hokmali way

Binagadi village

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



Outskirts of Khodjasan

Khodjasan village

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk



Khodjasan, at the Northest part of the elongated Khodjasan lake, at the side of City Bypass Road

Binagadi and Absheron Settlements

Low Risk

High Risk

Medium Risk

Medium Risk

High Risk



North part of Chikh beach, nearby Shahin ridge quarries

Lokbatan, Sabayil

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



Lokbatan, Bina Shopping Center

Shopping centers around the dumpsite

Medium Risk

High Risk

Medium Risk

High Risk

High Risk



Binagadi, east of highway, north west of Boyuk Gol lake, behind Zangezur restaurant

Binagadi

Low Risk

Medium Risk

Low Risk

High Risk

High Risk



Binagadi inside NQCI area

Binagadi village and settlements

Low Risk

Medium Risk

Low Risk

Low Risk

Medium Risk



Binagadi, near temporary storage, at the side of the car road

Binagadi settlements

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk



Zigh north west open area

Various settlements - open dumpsite area open to everybody

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



Surakhani, Zighl landfield

It was used by Surakhani and Qaracuxur

Low Risk

Low Risk

Medium Risk

Low Risk

Medium Risk



Zigh lake, north west

Zigh settlements

Low Risk

High Risk

High Risk

Medium Risk

High Risk



Guneshli Khatai region

Guneshli settlements

Low Risk

Medium Risk

High Risk

Low Risk

High Risk



Pirallachi island seaside

Pirallachi settlements

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



Pirallachi island living area

Pirallachi settlements

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



Pirallahi south east

Pirallahi settlements

Low Risk

Low Risk

Low Risk

High Risk

High Risk



Shuvalan

Shuvalan, Mardakan and Surakhani settlements

Low Risk

Low Risk

Medium Risk

Low Risk

Medium Risk



Buzovna

Buzovna settlement and seaside residences.

High Risk

High Risk

Medium Risk

High Risk

High Risk



Buzovna station west 2

NQCI area , solid and oily liquid waste from the oil company

Low Risk

Medium Risk

Low Risk

Low Risk

Medium Risk



Raman lake south east

NQCI area , solid and oily liquid waste from the oil company and domestic waste from new residential area

Medium Risk

High Risk

Medium Risk

Medium Risk

High Risk



Raman lake west

NQCI area , solid and oily liquid waste from the oil company and domestic waste from new residential area

Medium Risk

High Risk

Medium Risk

Medium Risk

High Risk



South of Boyuk Shor lake coast

Entities which use the dumpsite: quarries, farms, auto repair shops and dangerous waste from different enterprises of the city.

Low Risk

Low Risk

Medium Risk

Low Risk

Medium Risk



South coast of Boyuk Shor lake

Entities which use the dumpsite: quarries, farms, auto repair shops and dangerous waste from different enterprises of the city.

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



Ziya Bunyadov avenue south coast of Boyuk Shor lake

Entities which use the dumpsite: quarries, farms, auto repair shops and dangerous waste from different enterprises of the city

Medium Risk

High Risk

High Risk

High Risk

High Risk



Qobustan (Garadagh region)

Qobustan village and settlements

Low Risk

High Risk

Medium Risk

Medium Risk

High Risk



Primorsk beach

New beach settlement (Yeni Sahil)

Low Risk

Medium Risk

Low Risk

Low Risk

Medium Risk



Asad Ahmado, Yasamal

At a backyard excavation of refuge building block of flats

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk



Bunyadzade street, Yasamal

Building and construction waste and debris

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



Kamal Rahimov, Umid Akbarov, cross streets – Yasamal

Nearby residential houses

Low Risk

Medium Risk

Low Risk

Medium Risk

Medium Risk



Yasamal, Gangli Gol lake 1

More than forty settlements all around the city of Yasamal.

Medium Risk

High Risk

High Risk

High Risk

High Risk



Yasamal, Gangli Gol lake 2

More than forty settlements all around the city of Yasamal.

Medium Risk

High Risk

High Risk

High Risk

High Risk



Qanli Gol Lake, east coast

Residential buildings next to the dumpsite

Low Risk

High Risk

High Risk

High Risk

High Risk



Mehdiabad. On the way to Pirshaga village

Mehdiabad settlements

Low Risk

Low Risk

Low Risk

High Risk

High Risk



Kurdaxani

Kurdaxani village

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk



Mashtaga

Mashtaga village and settlements

High Risk

Medium Risk

Low Risk

High Risk

High Risk



Biladjari, west coast of Boyuk Shor lake 1

Biladjari

Low Risk

Medium Risk

Low Risk

High Risk

High Risk



Bilagardi, west coast of Boyuk Shor lake

Bilagardi

Low Risk

Medium Risk

Low Risk

High Risk

High Risk



Biladjari, west coast of Boyuk Shor lake (3)

Biladjari

Low Risk

Medium Risk

Medium Risk

High Risk

High Risk



Zabrat 1, north coast of oil water fields lake

Zabrat

Low Risk

Medium Risk

Low Risk

Low Risk

Medium Risk



Zabrat 1, near the cemetery

Zabrat

Low Risk

Medium Risk

Low Risk

Low Risk

Medium Risk



Zabrat to Balakhani

Zabrat

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk



Yeni Balakhani

Balakhani

Low Risk

Medium Risk

Medium Risk

High Risk

High Risk



Bulbul lake, north coast

Razin

Low Risk

High Risk

High Risk

High Risk

High Risk



Buzovna settlement

Buzovna

Low Risk

Low Risk

Low Risk

High Risk

High Risk



Mardakan beach

Khazar

Low Risk

Medium Risk

Medium Risk

High Risk

High Risk



Qala - Turkan along the road

Khazar village

Low Risk

Low Risk

Medium Risk

High Risk

High Risk



Lokbatan ravine

East Lokbatan settlements

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



Lokbatan ravine

East Lokbatan settlements

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



Lokbatan ravine

East Lokbatan settlements

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



International Bus Station

Alatava 2, Binagadi settlements and refugee settlement inside the site

Low Risk

High Risk

Low Risk

High Risk

High Risk



Taiyev drilling and oil company NQCI area

Bozovna Settlement

Medium Risk

High Risk

Medium Risk

Medium Risk

High Risk



Zali lake

Binagadi settlements and 10 refugee inside the dumpsite

High Risk

Medium Risk

Low Risk

Medium Risk

High Risk



Badamdar forest site

Badamdar settlement and Sabayil municipality

Low Risk

Medium Risk

Low Risk

High Risk

High Risk



Zabrat 2 test stone excavations

Zabrat

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



Sabunchu, Chursudbanou Navatan street

Sabunchu

Medium Risk

High Risk

Medium Risk

High Risk

High Risk



Buzovna settlement

Buzovna

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



NQCI oilfield area, Binagadi

Binagadi

High Risk

High Risk

High Risk

High Risk

High Risk



Muchtarov area with refugee houses

Muchtarov and Ramana

Low Risk

Medium Risk

Medium Risk

High Risk

High Risk



Ilgar Mezidov street No 231 behind the school, Gurgan settlement

Gurgan

Low Risk

Low Risk

Low Risk

Low Risk

Low Risk



Rufulla Axundov street 35, Zabrat 1raillway crossing

Zabrat 1

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk



Ilgar Musayev street, developed along the fence of a cemetery opposite banquets’ Layla House

Chatai

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk



Mastaga oil area

Mastaga settlements

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk



Balakhani oil dumpsite

Balakhani

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk



New Balakhani oil area

Balakhani

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk

67.

Mastaga

Mastaga

Low Risk

Low Risk

Low Risk

Medium Risk

Medium Risk