7Audio

7.1Audio Performance Specifications

7.1.1Audio Parametric/ Digital Audio FunctionalityTest

Vendor Submit: Certification



Step#

Procedure

Pass/Fail

PICS Item



Proper documentation in Host package Submitted by vendor to include the following:

Dolby Digital Decoding Certification and Dolby Acceptance Letter.







Audio.15

HstIBCS.30

HstIBCS.182

HNETdig_aud.2

HNETdig_aud.4

HNETdig_aud.5

HNETdig_aud.6

HNETdig_aud.7

HNETdig_aud.8

HNETdig_aud.9

HNETdig_aud.11

HNETdig_aud.12




8Host Device Powering States

8.1.1Host Power Supply Test


This test measures the ability of the Host Power Supply to remain within regulation limits with the peak current load of the CableCARD applied.
Equipment:

DUT, DC Electronic load devices, (Such as Kikusui PLZ153W or equivalent), DC Voltmeter, Ohmmeter, Sycard PCExtend 140A, quantity ≤ 25cm lengths of 22AWG cables with correct connector types.


Setup: Verify the host power cord is disconnected use ≤ 25cm length 22AWG hook up wires for the following connections.
1.) Connect the two VCC pins on J1 and J2 of the extender card to the positive terminal of the first electronic load. Connect two of the GND pins of J1 and J2 to the negative terminal of the first electronic load.
2.) Connect the VPP2 on J2 of the extender card to the positive terminal of the second electronic load. Connect two of the GND pins of J1 and J2 to the negative terminal of the second electronic load.

Connect the extender card to the Host under test.


3.) Set the electronic loads to constant current mode. Set the VCC load to 1.0A and the VPP2 load to 0.125A. (Consult the electronic load manual for operation detail if necessary.)

Plug in the Host.


Note: Due to power supply design options (regulation may be based on VCC output), it may be necessary to apply a load to VCC for VPP2 voltage test.

Figure 8.1-1 – DUT Power Suply Test Set-up


Procedure:


Step#

Procedure

Pass/Fail

PICS Item



Apply Power to the DUT.

N/A






Insert the SYCARD PCextender CARD into the DUT.

N/A






Measure the voltage between the VCC and GND test points on the extender card with the DC voltmeter.

Verify that the VCC pins are at a High-Z with the Ohmmeter.



Note: The Host shall not apply 3.3V on VCC pins until Card-type identification and M-CARD discovery is performed.




HPower.12



Measure the voltage between the VPP2 and GND test points on the extender card with the DC voltmeter.

Verify that the VPP2 pin is at a High-Z with the Ohmmeter.



Note: The Host shall not apply 5V on VPP2 pin until Card-type identification and M-CARD discovery is performed.




HPower.12



Bring up the HPNx Pro software on the given PC. Verify that the PC and HPNx Pro are on the same isolated network.

N/A






Note the last 4 (mac address) digits of HPNx Pro you are using.

(Information is on the back side of card)



N/A






Under the Device tab, enter the 4 digits in the blank space labeled “Your HPNx Pro ID”

N/A






Insert the HPNx Pro extender card into the DUT. From the HPNx Pro trace window, check that the status of the HPNx Pro goes ready and the resource manager opens its session.

N/A






Set the VCC electronic load to on. Verify the load is drawing 1.00A with the load meter.

If necessary, adjust the current setting to draw 1.00A.



N/A






Measure the voltage between the VCC and GND test points on the extender card with the DC voltmeter.

Record the results.



Note: The Host shall apply 3.3V ± 0.3 VDC on VCC pins after Card-type identification and M-CARD discovery is performed.




Hpower.11

Hpower.12 Hpower.13

Hpower.15




Set the VPP2 electronic load to on. Verify the load is drawing 0.125A with the load meter. If necessary adjust the current setting to draw 0.125A.

N/A






Measure the voltage between the VPP2 and GND test points on the extender card with the DC voltmeter.

Record the results.



Note: The Host shall apply 5.0V ± 0.25 VDC on VPP2 pin after Card-type identification and M-CARD discovery is performed.




Hpower.11 Hpower.12

Hpower.14

Hpower.15

8.1.2Host Standby Mode Test


This test verifies the operation of the Host device in Standby Mode.

Equipment: DUT, HPNx Pro, SYCARD PCCextend 140A, logic analyzer, modified1 logic analyzer CableCARD adapter card

Software: Logic Analyzer configuration file: “HOST_437._A” (this need to be clarified which config file shall be used, and what is the difference between both of them)



Setup:

Connect the DUT to CableCARD extender card, HPNx Pro to extender card. Connect the modified 2logic analyzer CableCARD adapter to the CableCARD extender card and insert all 4 logic analyzer connectors into the adapter.

Table 8.1-1 – Pin Signals


Signals Monitored

Pin Number

Pin Name

12

CRX

25

CTX

11

DRX


Procedure:

Step#

Procedure

Pass/Fail

PICS Item



Power up the Agilent Logic Analyzer Model number 1672G. Click Analyzer, Select system.

Click External I/O, select hard disk. Scroll down until you find “HOST_437._A” Click Load, followed by Execute. This will load the analyzer configuration.



N/A






Insert in the SYCARD PCCextend 140A into the DUT. Connect the modified logic analyzer adapter to the PCCextend 140A and insert all 4 logic analyzer connectors into the adapter.

Insert HPNx Pro extender into the SYCARD PCCextend 140A.



N/A






Bring up the HPNx Pro software on the given PC. Verify that the PC and HPNx Pro are on the same isolated network.

N/A






Note the last 4 (mac address) digits of HPNx Pro you are using.

(Information is on the back side of card)



N/A






Under the Device tab, enter the 4 digits in the blank space labeled “Your HPNx Pro ID”

N/A






Insert the HPNx Pro extender card into the DUT. From the HPNx Pro trace window, check that the status of the HPNx Pro goes ready and the resource manager opens its sesion.

N/A






Right click on the Trace window to select SPDU and Payload for full vision of all layers.

N/A






Select the “Host Control” tab. And then press the Play button to open the Host Control resource.

N/A






Verify that the DUT establishes a session to the Host Control and reports support for Application Information resource = 0x00200081.

S [01:39:57.814] open_session_request from Host Control

[ 91 04 00 20 00 81 ]

S [01:39:57.854] open_session_response on resource Host Control, Status = 0x00, SessionNb = 2

[ 92 07 00 00 20 00 81 00 02 ]


N/A






Using the HPNx Pro test tool, send oob_rx_tune() requests with the following parameter values, and verify that the DUT replies with an oob_rx_tune_cnf() with “tuning granted”.

Frequency = 75250KHz, Bit rate = 2048kbps, Spectrum = 0 (non-inv)



N/A






Capture the signal traces at the logic analyzer.

Change MENU from “SYSTEM” to “ANALYZER”. Change display from “CONFIGURATION” to “WAVEFORM”. Select “RUN” to initiate the capture process. The analyzer will trigger continuously on the rising edge of CRX. Verify that the clock signal, CRX, is present as well as DRX.





N/A






Put the DUT in standby mode (follow manufacturer provided instructions).

N/A






Verify that there is no change to any of the signals.




Hstby.1

Hstby.2


Hpower.9




Figure 8.1-2 – Analyzer Capture