Western and central african office report of the tenth informal coordination meeting for the improvement of air traffic services


DATA COLLECTION PROCEDURES AND STATISTICAL PRESENTATION



Download 1.27 Mb.
Page6/8
Date31.03.2018
Size1.27 Mb.
#44474
1   2   3   4   5   6   7   8

DATA COLLECTION PROCEDURES AND STATISTICAL PRESENTATION


Whit the data provider by Canarias ACC, SATMA will do all statistics about movements in the EUR-SAM Corridor from the first of January 2002.


Daly movements data between FL 250 and FL 410 will be the source for statistics.
Cape Verde, Senegal and Brazil will supply information about flight level changes and re routing made in its corresponding airspace. This information will be send to SATMA on a monthly basis.
For Crossing Traffic and UB 623, Cape Verde, Senegal and Brazil will supply all related information. This information will be sent to SATMA on a monthly basis.
Data related to deviations will be send to SATMA as soon as possible.
Operators and ACC´s will send information related with deviations or no deviation reports as follows:
If deviation occurred: as soon as possible using the Navigation Deviation Investigation Form

If no deviation were reported: inform on this situation during the first five days of the following month.


Deviations cleared by ATC are also required to be send to SATMA.

AIRCRAFT INFORMATION

SATMA will manage a data base of European RVSM certified aircraft. It is also required information of other aircraft that are not in that data base, for example:




  • Air Afrique

  • South African Airways (already received)

USAF


SAT/10

APPENDIX C

C-1





Data to be considered for RNP and RVSM post implementation safety assessment program
General issues


  1. occupancy prior to RVSM implementation

  2. post implementation assessment with data of two month

RVSM safety assessment




  1. monitoring data for Altimeter System Error (ASE);

b) mode C data collection

  1. collect data on large Aircraft deviations (AAD) due to turbulence

  2. update occupancy estimates after RVSM, including crossing traffic;

  3. air navigation equipment data;

  4. data on large height deviation;

  5. update upper bonds for two allowable large deviation rates.

RNP 10/50 NM assessment




  1. update occupancy estimates after implementation;

  2. collect data on large deviations from track.




D-1

APPENDIX D

SAT/10




PORTUGAL/SPAIN MEETING FOR COORDINATION ON SAT/10 AGENDA


(Madrid, 7th December 2001)

Taken into account that, due to the representatives agenda, Portugal cannot assist to the SAT/10 meeting scheduled for next December 10/13 at Dakar, and that there are some items on the SAT/10 agenda that can affect to the Lisbon and Santa María Oceanic ACC’s, an informal meeting was agreed between Portugal and Spain delegates so as to bring to the SAT/10 meeting the items related.
Under the agreed agenda the following items was considered:
1.- New western ATS route
The need and convenience of the new western ATS route was discussed with the following conclusions:


  1. The new route will follow the actual UN 742 from ABALO to a point to be defined at Brazil.




  1. According with the RNP10, this route will have a minimum lateral separation of 50NM with the ATS route UN741.




  1. Portugal will extend this ATS route to XERES (Lisbon /Madrid boundary).




  1. The traffic orientation will be Northbound for the new ATS route UN742 so as to maintain the Southbound flow for the UN741.




  1. Due to the traffic growth on the actual UN741 and the regulations on that route, it will be desirable to establish a calendar so as to publish the new ATS route before May 2002.




  1. It will be also desirable to avoid the even/odd flight levels change on that part of the FIR’s. For this reason Portugal support the Spain proposal for the South Atlantic flight levels allocation to be maintained on ODD southbound and EVEN northbound with the application of the RVSM.




SAT/10

APPENDIX D

D-2





2.- CAFSAT network
Nowadays there are no direct dedicated communication between Santa María Oceanic and Piarco and the commercial PPT network is used.
There is a need for the establishment of data/voice communication to facilitate the co-ordination as well as to eliminate the shortcomings in this area.
The CAFSAT network at Lisbon and Santa María Oceanic is expected to be on service by the end June 2002.
Due to the need of communication, Portugal support the IATA proposal for the extension of the CAFSAT network to Piarco.
3.- Eur/Sam corridor RVSM readiness
Portugal inform that they are technical and operational ready for the RVSM implementation over the Eur/Sam corridor by January 24th 2002.

--------------------------------------------




E-1

APPENDIX E

SAT/10


GRAPHIC PROPOSAL OF ATS ROUTES, CAPE TOWN/ASCENSION ISLAND/ANTIGUA/ATLANTA AND JOHANNESBURG/ATLANTA








SAT/10

APPENDIX F

F-1





Notam related to crossing track procedures to the EUR/SAM corridor

Traffic crossing the EUR/SAM corridor should flight plan to enter and exit the EUR/SAM corridor RVSM airspace at the following published points: ……….. The estimates time over each point must be insert at the item 18 of flight plan.



G-1

APPENDIX G

SAT/10


RVSM IMPLEMENTATION DATE NOTAM

As announced in the respectives AICs and AIP AMDTs of Spain, Cape Verde, Senegal and Brazil, the application of RVSM along the EUR/SAM corridor will begun on January 24th 2002 at 00:01 UTC.





SAT/10

APPENDIX H

H-1






Download 1.27 Mb.

Share with your friends:
1   2   3   4   5   6   7   8




The database is protected by copyright ©ininet.org 2024
send message

    Main page