Table 1 and 2 update the planned transmission and generation projects, respectively, in PG&E service area that were presented in PG&E’s 2012, 2013, 2014, and 2015 Annual Progress Report. These projects were granted the waiver of “Significant Transmission Project” status for the purpose of Project Coordination Review Process.

Table 3 and 4 list the planned transmission and generation projects, respectively, in PG&E service area requesting waiver of “Significant Transmission Project” status. The purposes of these projects are for serving local load, to enhance or maintain local reliability, and/or to reduce local capacity requirements. These projects are not expected to have significant impacts on the operation of the Western Interconnected System. PG&E requests waivers of the “Significant Transmission Project” status for the purpose of Project Coordination Review Process.
Table 1

Planned Transmission Projects

Waiver of “Significant Transmission Project” Status Granted in 2012, 2013, 2014, 2015 and 20161



PROJECT NAME

PROJECT DESCRIPTION

DATE IN SERVICE

Moraga Transformer No. 2 Capacity Increase

Replace Transformer number 2, 230/115 kV at Moraga Substation with a 420 MVA rated unit.

In Service

Contra Costa – Moraga 230 kV Reconductoring

Reconductor the Contra Costa - Moraga 230 kV DCTL with larger capacity conductors.

In Service

Weber 230/60 kV Transformer Nos. 2 and 2A Replacement

Replace Weber 230/60 kV Transformer Nos. 2 and 2a with a new transformer rated at least 300 MVA with LTC and associated equipment

In Service

Los Banos-4C779 #1 230kV Line Reconductoring Project

Reconductor 4.5 miles of the Los Banos - Panoche 230 kV No. 1 Line with a higher capacity conductor

In Service

Embarcadero-Potrero 230 kV Project

Construct a new 230 kV underground cable to connect Embarcadero and Potrero substations.

In Service

Midway Fault Duty Mitigation Project

Install reactors at 230 kV side of Midway transformer banks 11, 12 and 13.

Apr-17

Contra Costa sub 230kV Switch Replacement

Replace 230 kV Switch No. 239 at Contra Costa Substation that currently limits the Contra Costa PP-Contra Costa Sub 230 kV Line to 1600 Amps. Any other limiting element will be replaced as well.

Dec-17

Warnerville-Wilson 230 kV Series Reactor

Install a 230 kV multi-step Reactor totaling 50.5 ohms, and associated equipment at Wilson Substation, on the Warnerville-Wilson 230 kV line

Dec-17

PROJECT NAME

PROJECT DESCRIPTION

DATE IN SERVICE

Gregg-Herndon #2 230 kV Line Circuit Breaker

Replace limiting terminal equipment on the Herndon-Gregg #2 230 kV Line at Herndon substation.

Mar-18

Ashlan-Gregg and Ashlan-Herndon 230 kV Reconductor

Reconductor limiting sections of Ashlan-Gregg and Ashlan-Herndon 230 kV sections with higher rated conductors.

May-18

Glenn 230/60 kV Transformer No. 1 Replacement

Replace the existing 230/60 kV Transformer No. 1 and regulator at Glenn with a new 3-phase, 230/60 kV with a Load Tap Changer.

Dec-18

Wheeler Ridge Voltage Support

Install three 75 MVAR steps of mechanically switched capacitors on the Wheeler Ridge 230 kV bus, expand the 230 kV bus as necessary reconductor 0.5 miles of the Wheeler Ridge-Lakeview 70 kV line and transfer Copus from the Old River-Copus 70 kV line to the Wheeler Ridge-Lakeview 70 kV line.

Mar-19

Kearney-Herndon 230 kV Line Reconductor

Reconductor 10 miles of the Kearney - Herndon 230 kV Line

Mar-19

Morro Bay 230/115 kV Transformer

Install an additional 230/115 kV transformer at Morro Bay Substation rated for 200 MVA or higher.

Apr-19

Borden 230 kV Voltage Support

This project proposes to loop the Wilson-Gregg 230 kV Line into Borden Substation (Borden) and install 200 MVARs of mechanically switched capacitors on the Borden 230 kV bus.

May-19

Estrella Substation

Construct a new Estrella 230/70 kV substation, with Breaker and a Half (BAAH) bus configuration , approximately 5 miles east of the existing Paso Robles Substation. Install one 45 MVA distribution 230/12 kV, 2 feeder breakers and associated outlets

May-19

Diablo Canyon Voltage Support Project

Install a +150/-75 MVAR Reactive support device at Diablo Canyon 230 kV Substation

Jul-19

Eight Mile - Lodi Re-conductoring Economic Project

Reconductor 2.3 miles of the Lodi - Eight Mile 230 kV Line with higher capacity conductors.

Sep-19

Kern PP 230 kV Area Reinforcement Project

• Convert Kern PP 230 kV double bus single breaker arrangement to breaker and a half
• Replace limiting equipment on Kern PP 230/115 kV transformer No. 4 as necessary to achieve full transformer rating
Install a 230/115 kV Transformer Special Protection Scheme at Kern 115 kV to mitigate overloads of Kern PP Transformer Nos. 3, 4, and 5

Mar-20

Monta Vista 230 kV Bus Upgrade

Install bus-sectionalizing and bus-parallel breakers on the Monta Vista 230 kV bus

Apr-20

Tulucay 230/60 kV Transformer No.1 Capacity Increase

This project proposes to replace Tulucay Circuit Breaker No. 62 and all of its associated switches with a circuit breaker rated at 2000 Amps or higher. Any other associated terminal equipment will also be replaced as necessary

Apr-20

PROJECT NAME

PROJECT DESCRIPTION

DATE IN SERVICE

Wheeler Ridge Junction Substation

Construct a new 230/115 kV Substation with Breaker and a Half at Wheeler Ridge Junction, Convert 15.5 miles of the Wheeler Ridge – Lamont 115 kV Line to 230 kV

May-20

Midway-Kern PP 230 kV #2 Line Project

Reconductor the Midway-Kern #1 230 kV Line, split it to Midway-Kern #1 and #2 230kV Lines, remove crosstie connections to split the Midway-Kern #1 Line into two circuits, reconductor the Bakersfield #1 and #2 230 kV Taps, loop Bakersfield 230 kV substation, remove Stockdale 230 kV Tap #1 and #2 from the Midway-Kern lines and relocate to Kern PP 230 kV bus

Jul-20

Moraga - Castro Valley 230 kV Line Capacity Increase Project

Upgrade the limiting substation equipment (jumper conductors and wave traps) at Moraga and Castro Valley substations

Mar-21

Morgan Hill Area Reinforcement Project

Construct new 230/115 kV Spring Substation in Morgan Hill, with connections into the Metcalf-Moss Landing No. 2 230 kV Line and the Morgan Hill-Llagas 115 kV Line.

May-21

Rio Oso 230/115 kV Transformers

Replace the Rio Oso 230/115 kV transformers (Nos. 1 and 2) with two 420 MVA rated transformers. Convert 115 kV bus to BAAH.

Jul-21

Rio Oso Area 230 kV Voltage Support

Install a new Static Var Compensator (SVC) at Rio Oso Substation and a new Shunt Capacitor at Atlantic Substation.

Feb-22

Martin 230 kV Bus Extension

Relocate the Jefferson-Martin 230 kV Line and one of the Martin-Embarcadero 230 kV Lines into a new 230 kV switchyard near Martin Substation.

Apr-22

Fulton 230/115 kV Transformer

This project proposes to install a 230/115 kV transformer at Fulton Substation rated for 420 MVA or higher.

May-22

Pittsburg 230/115 kV Transformer Capacity Increase

Install 3rd 230/115 kV Transformer at Pittsburg Substation with a rating of 420 MVA

May-22

Bellota – Warnerville 230 kV Line Reconductoring

Reconductor the Bellota – Warnerville 230 kV Line with a larger capacity conductor

Aug-22

Warnerville - Bellota 230 kV line reconductoring

Reconductor the Warnerville-Bellota 230 kV line

Aug-22

Gates No. 2 500/230 kV Transformer

Install a second 500/230/13.8 kV transformer (three single-phase units, 374 MVA each) at Gates Substation

Dec-22

Rio Oso – Atlantic 230 kV Line

Construct a second Rio Oso – Atlantic 230 kV Line.

Dec-22

Lockeford-Lodi Area 230 kV Development

Construct new 15 mile 230 kV DCTL from Eight Mile Substation to Lockeford Substation

Dec-22

Central Valley Power Connect aka Gates-Gregg 230 kV New Line

Build new DCTL (roughly 60 miles) of Gates-Gregg 230 kV line and upgrade substation equipment.

Dec-22
(on hold)

Midway-Andrew 230 kV

Upgrade existing 65 miles long Midway-Santa Maria 115KV line to 230kV

Jun-25

Midway-Kern PP 230 kV Line Nos. 1, 3 and 4 Capacity Increase Project

Replace limiting components at Kern PP and Midway Substations, to achieve full capacity on the Midway-Kern 230 kV Line Nos. 1, 3 and 4

Nov-26

PROJECT NAME

PROJECT DESCRIPTION

DATE IN SERVICE

Vaca Dixon - Lakeville 230 kV Reconductoring

Reconductor the Vaca – Lakeville No. 1, Tulucay – Vaca, and Tulucay – Lakeville 230 kV Lines with larger capacity conductors.

Cancelled

Tesla - Newark 230 kV Upgrade II

Reconductor limiting sections of Tesla - Newark 230 kV No. 2 with larger capacity conductors.

Cancelled

San Mateo Synchronous Condensor Replacement

Install reactive support device to replace old synchronous condensers at 115kV.

Cancelled

Moraga-Potrero 230 kV Project

Establish a 230 kV connection between Moraga and Potrero Substations.

Cancelled

Table 2

Planned Generation Interconnection Projects

Waiver of “Significant Transmission Project” Status Granted in 2014, 2015 and 20161



PROJECT NAME

PROJECT DESCRIPTION

DATE IN SERVICE

Tranquility Solar Generation Project

Interconnect a 200 megawatt (MW) (net output) of generation facility to a new PG&E owned 230 kV switching station that loops into PG&E’s Panoche – Helm and Panoche – Kearney 230 kV lines.

In Service

Panoche Valley Generation Interconnection Project

Interconnect a 240 MW (net output) of generation facility to a new PG&E owned 230kV switching station that loops into PG&E’s Moss Landing – Panoche and Coburn – Panoche 230 kV Lines. Construct a new 3 Bay, 8 breaker Switching station (BAAH)

Dec-17

Wright Solar Park

Interconnect a 200 MW (net output) solar-based generation facility to Los Banos – Panoche 230 kV Line No. 1 by looping in through a new PG&E-owned  switching station. The new Switching Station is a 2-Bay, 5 Breaker 230 kV.

Feb-18

California Flats Solar Generation Interconnection Project

Interconnect 280 MW solar generation to Morro Bay - Gates 230 kV Line Number 2.

Jul-18

Oakley Generation Interconnection Project

To interconnect 651 MW of new generation, install a new 230 kV circuit breaker at Contra Costa Substation, install SPS at Contra Costa Substation, reconductor Contra Costa – Delta Pumps 230 kV Line, only east circuit, reconductor Las Positas – Newark 230 kV Line, only west circuit.

Project in suspension

(Dec-18)


Table 3

Planned Transmission Projects

Requesting Waiver of “Significant Transmission Project” Status


PROJECT NAME

PROJECT DESCRIPTION

DATE IN SERVICE

Bellota 230 kV Substation Shunt Reactor

Install 100 MVar Shunt Reactor at Bellota 230 kV Substation

Jan-19

Delevan 230 kV Substation Shunt Reactor

Install 200 MVar Shunt Reactor at Delevan 230 kV Substation

Feb-19

Los Esteros 230 kV Substation Shunt Reactor

Install 250 MVar Shunt Reactor at Los Esteros 230 kV

May-19

Ignacio 230 kV Substation Shunt Reactor

Install 150 MVar Shunt Reactor at Ignacio 230 kV Substation

Jun-20

Table 4

Planned Generation Interconnection Projects

Requesting Waiver of “Significant Transmission Project” Status


PROJECT NAME

PROJECT DESCRIPTION

DATE IN SERVICE

Q1032 / Tranquillity 8

The Project is a Photovoltaic generation and Battery Storage system with a total rated output of 200 MW to Pacific Gas and Electric Company’s (PG&E’s) 230kV Tranquillity BAAH Switchyard

Dec-17



11 Facilities indicated “In Service” will be removed from the 2016 annual progress report.





Download 88.99 Kb.

Share with your friends:




The database is protected by copyright ©ininet.org 2024
send message

    Main page