Acac cns/atm study Update & Strategic Planning Supplemental Data Collection Questionnaire Project Manager


Table : AU-2, Sample, Automation System Adequacy



Download 2.67 Mb.
Page16/26
Date02.02.2017
Size2.67 Mb.
#15945
1   ...   12   13   14   15   16   17   18   19   ...   26

Table : AU-2, Sample, Automation System Adequacy

Present Automation Systems

Adequate

(9-10)

Moderately Adequate

(6-8)

Minimally Adequate

(3-5)

Not Adequate At All

(0-2)

Not Applicable

FACILITY Type:

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

Automation System #

1













X














































2




X
























































(AU-2): What is level of adequacy of the CURRENT automation system(s) in use? Please use the criteria defined in Part 1, and the facility type abbreviations listed below when responding. Indicate your response with an “X”. Please insert the automation system number from question AU-1 above in field titled “Automation System”.
AC = Area Control Center

AP = Approach Control Facility

AD = Aerodrome Facility

FS = Flight Services
Insert Response Here:

Table : AU-2, Automation System Adequacy



Present

Automation Systems

Adequate

(9-10)

Moderately Adequate

(6-8)

Minimally Adequate

(3-5)

Not Adequate At All

(0-2)

Not Applicable

FACILITY Type:

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

AC

AP

AD

FS

Automation System

Insert System #





























































Insert System #





























































Insert System #





























































Insert System #





























































Insert System #





























































Insert System #





























































Insert System #































































(AU-2-2): Additional comments, as appropriate.

Insert Response Here:


SAMPLE - (AU-3): Indicate the CURRENT and PLANNED functional capabilities of each automation system within EACH time period (Current, 2020, 2025 and 2030). Indicate your response with an “X”. This sample assumes that Two (2) automation systems were identified in question AU-1 above. Thus, the responses in the sample are for EACH system “1” and “2”.


Automation – Sample

Table : AU-3, Sample, Automation Functional Capabilities

Category

Automation Functional Capabilities

System Number(s) - Response ‘X’

Current

2020

2025

2030

1

2

3

4

1

2

3

4

1

2

3

4

1

2

3

4

Data Information & Processing

Provide automated intra-facility handoff

X

























X



















Provide automated inter-facility handoff













X













X



















AIDC/OLDI (capable)













X

X































AIDC/ODLI (operational)

























X

X



















Provide automated Complete Flight Data Processing

























X

X




















Download 2.67 Mb.

Share with your friends:
1   ...   12   13   14   15   16   17   18   19   ...   26




The database is protected by copyright ©ininet.org 2024
send message

    Main page