Hazard:

Flood/Storm #19

Action Item:

Support Orange County Public Works, Flood Control Division and the City of

Huntington Beach in funding for D01 Huntington Beach Channel – Confluence with D02 to Magnolia (C.P. Repair)



Coordinating

Organization:

CCCD Facilities Division

Description

A cathodic protection (CP) system along D01 exists between Brookhurst St to

Indianapolis Ave. The channel is predominantly rectangular soft-bottom. Steel sheet

piles line both sides of the channel banks. This project proposes to mitigate and repair

The coating failure. Part of the remediation effort will include providing electrical

Continuity between sheet piles and implementing a maintenance program that will

Address touch-up repairs to areas where coatings are visibly failing.

Time Line:

FY 2009-2010







Constraints:

The CCCD has no official authority and no means of assisting financially; however, the CCCD can offer our political support for securing grants for the project

.

.

Plan Goals

Protect Life and Property







CCCD Sites Impacted

Golden West College in Huntington Beach











Hazard:__Flood/Storm_21__Action_Item'>Hazard:

Flood/Storm #21

Action Item:

Support Orange County Public Works, Flood Control Division and the City of

Huntington Beach in funding for D02 Talbert Channel – Adams to Yorktown (Cathodic Protection)



Coordinating

Organization:

CCCD Facilities Division

Description

Improvements of this reach to convey the 100-yr storm flows was completed in 1994.

The project constructed vertical sheet piles along both sides of the channel. A cathodic

Protection (CP) system was also designed but not implemented. This project proposes

A CP system that is an all galvanic system.

Time Line:

FY 2009-2010







Constraints:

The CCCD has no official authority and no means of assisting financially; however, the CCCD can offer our political support for securing grants for the project

.

.

Plan Goals

Protect Life and Property







CCCD Sites Impacted

Coastline Community College Art Center in Huntington Beach











Hazard:__Flood/Storm_24__Action_Item'>Hazard:__Flood/Storm_23__Action_Item'>Hazard:

Flood/Storm #22

Action Item:

Conduct a flood assessment of CCCD facilities to determine if flood proofing is needed.

Coordinating

Organization:

CCCD Facilities Division

Description

  • Determine if a seismic survey has ever been conducted




  • Research and document what has been accomplished and what still needs to be done




  • Decide if a formal assessment of facilities is needed







Time Line:

5 years

Constraints:

Time (shortage of facility personnel); budget (cost of the assessment)

Plan Goals

Protect Life and Property

CCCD Sites Impacted

All sites owned by the CCCD should be included in this study


Hazard:__Flood/Storm_26__Action_Item'>Hazard:

Flood/Storm #23

Action Item:

Participate in the Orange County HAZUS Project to improve flood projections

Coordinating

Organization:

CCCD EHS/Emergency Management Coordinator and Vice Chancellor of Administrative Services

Description

  • Research how CCCD can participate in the Orange County HAZUS Project







  • In 5 years, when the Hazard Mitigation Plan is revised, improve the risk analysis by incorporating CCCD HAZUS data; use revised HAZUS hazard maps and cost estimates in the plan update; use this information to further assist in prioritizing mitigation activities and assessment

Time Line:

5 years

Constraints:

This strategy must be approved by the Orange County Hazard Mitigation Plan Task Force

Plan Goals

Create Partnerships and Implementation

CCCD Sites Impacted

All sites owned by the CCCD



Hazard:

Flood/Storm #24

Action Item:

Conduct flood mitigation education to staff, faculty, students and the public. Request their input into future projects.

Coordinating

Organization:

EHS/Emergency Management Coordinator

Description

  • As part of the planning process for this plan, present the CCCD Hazard Mitigation Plan to as many CCCD staff, faculty, students and the public as possible

  • Every opportunity that the EHS/Emergency Management Coordinator presents the districts emergency preparedness program, include information on the CCCD Hazard Mitigation Plan and ask for input into future projects

Include an overview of the plan and goals into the BERT/CERT program

Time Line:

Ongoing

Constraints:

The EHS/Emergency Management Coordinator can offer the training but attendance is voluntary

Plan Goals

Promote Public Awareness

CCCD Sites Impacted

All CCCD sites


Hazard:

Flood/Storm #25

Action Item:

Incorporate the Regional Earthquake Transportation Evacuation Routes for key CCCD sites developed by the Orange County Regional Emergency Managers Group into site planning documents and the 5-year update of this plan

Coordinating

Organization:

EHS/Emergency Management Coordinator and Site Public Safety Directors

Description

  • Provide this data to Site Emergency Coordinators who will integrate the evacuation routes data into the CCCD Site Plans

  • Train site and district EOC personnel on the study/routes

When the 5-year update of this plan is due, add transportation route maps with the evacuation routes data to the plan


Time Line:

5 years

Constraints:

This data must be provided to CCCD by the Orange County Operational Area

Plan Goals

  • Promote Public Awareness

  • Strengthen Emergency Services

CCCD Sites Impacted

All sites with employees



Hazard:

Flood/Storm #26

Action Item:

Identify funding sources for flood-proofing facilities identified in the assessment as vulnerable

Coordinating

Organization:

Vice Chancellor of Administrative Services

Description

  • Explore options for including seismic retrofitting in existing programs such as annual budget and pre and post disaster repairs

  • Explore ballot measures to fund seismic retrofitting projects

  • Explore applying for FEMA Hazard Mitigation Project grants

Time Line:

Ongoing

Constraints:

Recession and budget constraints

Plan Goals

  • Promote Public Awareness

  • Create Partnerships and Implementation

  • Protect Life and Property

  • Strengthen Emergency Services

CCCD Sites Impacted

All sites considered vulnerable to flooding


Hazard:

Flood/Storm #27

Action Item:

Conduct the flood-proofing measures appropriate for each site

Coordinating

Organization:

Vice Chancellor of Administrative Services and Facility Director

Description

  • Flood-proof critical facilities identified in the assessment

  • Flood-proof all other CCCD facilities identified in the assessment

Time Line:

7 Years

Constraints:

Time, Expertise and Budget

Plan Goals

Protect Life and Property

CCCD Sites Impacted

All