Licenced to: Jeremy Goddard. Single user licence only


Assurance and verification activities for



Download 274.61 Kb.
View original pdf
Page18/19
Date04.02.2023
Size274.61 Kb.
#60565
1   ...   11   12   13   14   15   16   17   18   19
Energy Institute Guidelines for the management of safety critical elements 2007
9.2.3
Assurance and verification activities for
temporary equipment
Temporary or portable equipment for use on an offshore installation should be subject to appropriate assurance and verification activities if The equipment in itself creates an addition to the platform list of SCEs (e.g. demountable drilling equipment not permanently held on the installation The equipment impacts on any of the existing platform SCEs:
- by virtue of the planned location on the installation (e.g. engine driven generator/
compressor required to operate in a designated hazardous area- by virtue of the proposed application (e.g. well intervention equipment once it becomes part of the reservoir pressure envelope).
The installation verification scheme should identify the nature and frequency of assurance and verification activities associated with temporary equipment these should include Examination of equipment prior to shipment Witnessing of testing prior to shipment Review of manufacturers / suppliers records certification Examination of equipment offshore Auditing of the management processes and records held- by the duty holder onshore and offshore- by the Shipping/Forwarding contractor.
Comprehensive records should be maintained by the duty holder to confirm adherence to the process. These records should be available to the ICP.


Licenced to Jeremy Goddard. Single user licence only.
IMPORTANT: This file is subject to a licence agreement issued by the Energy Institute, London, UK. All rights reserved. It may only be used in accordance with the licence terms and conditions. It must not be forwarded to, or stored or accessed by, any unauthorised user. Enquiries e pubs@energyinst.org.uk t +44 (0)207 467 7100 23 REFERENCES AND
GLOSSARY OF TERMS
10.1 REFERENCES OF FURTHER
INFORMATION
List of references and further information sources from
HSE, UKOOA and EI:
— A Guide to the Offshore Installations (Safety Case)
Regulations 2005 (HSE, 2006)
— Prevention of Fire and Explosion and Emergency
Response on Offshore Installations – Approved
Code of Practice and Guidance (HSE, 1997)
— Asset Integrity Toolkit (UKOOA, 2006)

Download 274.61 Kb.

Share with your friends:
1   ...   11   12   13   14   15   16   17   18   19




The database is protected by copyright ©ininet.org 2024
send message

    Main page