Baseline Survey and Economic Analysis
This chapter summarizes the results of the baseline survey and economic analysis for selected subprojects of ICGP for CoCC.
Baseline Survey and Target for Performance Indicator
The sectors of the subprojects of ICGP for CoCC are as follows.
Road/Bridge
Street Lighting
Drain Improvement
Water Supply
The results of the baseline survey are summarized by sector.
Road/Bridge Contents
The selected subprojects for roads/bridges are as follows.
Table 10‑46: Selected CoCC Road/Bridge Subprojects
No.
|
Name of Subprojects
|
1
|
Improvement of Urban Transport (Road + Drain, Ward 1–3)
|
2
|
Improvement of Urban Transport (Road + Drain, Ward 4–6)
|
3
|
Improvement of Urban Transport (Road + Drain, Ward 7–9)
|
4
|
Improvement of Urban Transport (Road + Drain, Ward 10–12)
|
5
|
Improvement of Urban Transport (Road + Drain, Ward 13–15)
|
6
|
Improvement of Urban Transport (Road + Drain, Ward 16–18)
|
7
|
Improvement of Urban Transport (Road + Drain + Bridge, Ward 19–21)
|
8
|
Improvement of Urban Transport (Road + Drain + Bridge, Ward 22–24)
|
9
|
Improvement of Urban Transport (Road + Drain + Bridge, Ward 22–24)
|
Source: ICGP Team
Considering the location and users of the road/bridge, the ICGP Team categorized the subprojects into three categories: (i) city roads; (ii) connector roads between city and local areas; and (iii) local road. The length of roads by category is as follows:
City Road: 5.55 km
Connector Road: 34.66 km
Local Road: 88.26 km
Traffic Count Survey
To evaluate the current traffic situation, a traffic count survey was conducted. As there are many roads in the subprojects, one traffic survey for each road category was conducted as a baseline survey for all road/bridge projects. The survey was for one weekday (from 6:00AM to 10:00PM) at specific locations.
The results are as follows.
Category: City Road
Location: Kandirpar – Pubail Chattar
Date: 2013 Nov. 25
Count Result
Table 10‑47: Traffic Count Survey Results (City Road)
Source: ICGP Team
Category: Connector Road between city area and local area
Location: Abdul Awal Road – Tikkar Char Road
Date: 2013 Nov. 25
Count Result
Table 10‑48: Traffic County Survey Results (Connector Road)
Source: ICGP Team
Category: Local Road
Location: Shaheed Abu Zahid Road – Bishnapur Road
Date: 2013 Nov. 25
Count Result
Table 10‑49: Traffic Count Survey Results (Local Road)
Source: ICGP Team
Driving Time
To assess traffic congestion and existing conditions, the ICGP team conducted driving time surveys at three locations for each road category. Results were as follows:
City Road
Time to drive 1.0 km (from point-to-point): 4.0 minutes
Survey location: Near Kandirpar
Date of survey: 25.11.2013
Connection Road between City Area and Local Area
Time to drive 1.0 km (from point-to-point): 4.0 minutes
Survey location: Abdul Awal Road
Date of survey: 25.11.2013
Local Road
Time to drive 1.0 km (from point-to-point):4.6 minutes
Survey location: Shaheed Abu Zahid Road
Date of survey: 25.11.2013
Target for Quantitative Indicator
Traffic volume will increase by 20% two years after initiation.
Driving time will decrease by 10% at two years after initiation.