Main project features: Feasibility Study and Formulation of Initial Environmental Examination (IEE) Preparation for Calbayog Airport.
Position held:Associate Consultant for environmental impact assessment and hydrologic study consultant
Activities performed: (1) Hydrologic investigation and assessment, rainfall intensity computation, hydrologic computations, storm surge heights and prediction of flood levels for coastal area where the airport will be constructed; (2) Provided recommendation of embankment fill level to flood proof the airport against coastal water level fluctuations as input to the IEE; (3) Formulation of mitigation measures in response to hydrologic impacts of the project; (5) Cost Estimation of recommended mitigation measures; (6) Proposed implementation arrangements for implementation of environmental monitoring.