Proposed position


Name of assignment or project



Download 98.38 Kb.
Page51/76
Date04.03.2021
Size98.38 Kb.
#55993
1   ...   47   48   49   50   51   52   53   54   ...   76
Sam's CV (current as of Aug 2019) Envi Only
Name of assignment or project: Feasibility Study for Bukidnon Airport Development Project

Year: 2013

Location: Bukidnon Province, Philippines

Client: JICA / Gov. of the Philippines - DOTC

Main project features: Feasibility Study and Formulation of Initial Environmental Examination (IEE) Preparation for Bukidnon Airport.

Position held: Associate Consultant for environmental impact assessment and hydrologic study consultant

Activities performed: (1) Hydrologic investigation and assessment, rainfall intensity computation, hydrologic computations, and prediction of flood levels for Maray-maray River; (2) Provided recommendation of embankment fill level to flood proof the airport as input to the IEE; (3) Formulation of mitigation measures in response to hydrologic impacts of the project; (5) Cost Estimation of recommended mitigation measures; (6) Proposed implementation arrangements for implementation of environmental monitoring.






Download 98.38 Kb.

Share with your friends:
1   ...   47   48   49   50   51   52   53   54   ...   76




The database is protected by copyright ©ininet.org 2024
send message

    Main page