Proposed position


Name of assignment or project



Download 98.38 Kb.
Page50/76
Date04.03.2021
Size98.38 Kb.
#55993
1   ...   46   47   48   49   50   51   52   53   ...   76
Sam's CV (current as of Aug 2019) Envi Only
Name of assignment or project: Initial Environmental Examination (IEE), Feasibility Study and Updating of the Master Plan for Zamboanga International Airport

Year: 2008-2009

Location: Zamboanga International Airport

Client: JICA / Gov. of the Philippines - DOTC

Main project features: Updating of Master Plan and Initial Environmental Examination for a new airport facility.

Position held: Associate Consultant for environmental impact assessment and hydrologic study consultant

Activities performed: The scope of work consisted of hydrologic investigation, rainfall intensity computation, and prediction of flood and tidal heights to flood proof the airport. The hydrologic study was input to the IEE. Consultant delegated to assess the entire hydrologic characteristics of the area and prescribe mitigation measures for the IEE document.






Download 98.38 Kb.

Share with your friends:
1   ...   46   47   48   49   50   51   52   53   ...   76




The database is protected by copyright ©ininet.org 2024
send message

    Main page