Proposed position


For the Construction Stage



Download 98.38 Kb.
Page49/76
Date04.03.2021
Size98.38 Kb.
#55993
1   ...   45   46   47   48   49   50   51   52   ...   76
Sam's CV (current as of Aug 2019) Envi Only
For the Construction Stage: (1) Conduct the Environmental Monitoring for each section of the Project consisting of train track routes, tunneling works, waterway crossings and vicinities of local communities; (2) Monitoring of all Contractor´s activities with regard to environmental issues such as air and water qualities, noise and biota impacts at earth moving areas, tunnel works, etc.; (3) Following-up of environmental mitigation measures all component works such as tunneling, earthworks, civil works, with focus on Climate Change Adaptation Measures; (4) Conduct site visits in regular intervals not exceeding three month; (5) Participation in regular meetings with the Contractors, the Client and authorities involved; (6) Preparation of 6-Months´ Progress Reports to be included in the overall Progress Report for presentation to the Client and the European Investment Bank.






Download 98.38 Kb.

Share with your friends:
1   ...   45   46   47   48   49   50   51   52   ...   76




The database is protected by copyright ©ininet.org 2024
send message

    Main page