Question: What should be first attempted if compliant fuel is unavailable?



Download 36.5 Kb.
Page4/13
Date28.04.2024
Size36.5 Kb.
#64120
1   2   3   4   5   6   7   8   9   ...   13
imo2020
Question:

Which of the following will be an issue relating to changing the heating of tanks? Choose all that apply.
Number of correct alternatives: 2

what is the minimum retention period for a scrubber ship's wash water discharge monitoring data? (Ref S.I 20b 6.1)


Number of correct alternatives: 1

  • As long as the scrubber remains operational.

  • Not less than 18 months

  • Data for the last voyage SOSP to EOSP to be available for inspection on berthing , or for the last 72 hours if a vessel has been at anchor/drifting.

  • Not less than 12 months

Who onboard is required to be familiar with the Ship Implementation plan (SIP)? (Ref SIP section 5.4)


Number of correct alternatives: 1

Which of the following has been implemented in order to assess fuel sulphur compliance?
Number of correct alternatives: 1

  • Remote sensing and portable devices can analyse the vessel's exhaust plume.

  • Crew members will be financially rewarded by Port State for reporting any instances of black smoke coming from their funnel

  • PSC officers will sail with a vessel for one voyage to monitor sulphur emissions

  • A new SOx appendix has been added to the Oil Record Book (ORB) part 1

Can Port State control inspect the Ship Implementation Plan (SIP)
Number of correct alternatives: 1

  • No

  • Yes

What is the minimum acceptable fuel viscosity at the engine inlet? (Ref S.I 20a 7.0 & PowerPoint)


Number of correct alternatives: 1

  • 380cSt

  • 2cSt

  • 180cSt

  • 15cSt



Download 36.5 Kb.

Share with your friends:
1   2   3   4   5   6   7   8   9   ...   13




The database is protected by copyright ©ininet.org 2024
send message

    Main page