imo2020
Question:
Where should bunker samples be taken from? (Ref S.I 20 20.7)
Number of correct alternatives: 1

  • New fuels need a pre bunkering Coq meaning it has already been tested and found compliant so there is no need for bunker samples

  • Directly from the fuel tank

  • All bunker samples will be supplied by the bunker barge

  • On the receiving vessel's inlet bunker manifold


Question:
Who is required to cross check and verify that all information required is specified in the BDN? (Ref S.I 20 20.19)
Number of correct alternatives: 1


Question:
How much HSFO ROB can remain in a tank that is ready to bunker compliant fuel oil? (Ref PowerPoint)
Number of correct alternatives: 1

  • Up to 5 m³ if chemical cleaning agents will be used

  • 0.5 m³

  • 0.3% of the quantity to be loaded

  • Tanks need to be fully clean (zero ROB)


Question:
What is the unit of measurement that sulphur emissions are tested by? (Ref S.I 20b 2.1)
Number of correct alternatives: 1

  • % m/m (percentage mass by mass)

  • SO2 (ppm) / CO2 (% v/v) (SO2/CO2 ratio method)

  • Nox ppm

  • SO2 (ppm)

Question:
When Should you enter a record of revision in the SIP?
Number of correct alternatives: 1

  • If PSC come and inspect the SIP and tells you to change a part of it.

  • When a change / regulation to the plan is implemented

  • Upon Masters orders.

  • Never once the SIP is in force no changes are to be made.