Question: What should be first attempted if compliant fuel is unavailable?
Download
36.5 Kb.
Page
9/13
Date
28.04.2024
Size
36.5 Kb.
#64120
1
...
5
6
7
8
9
10
11
12
13
imo2020
Question:
Where should bunker samples be taken from? (Ref S.I 20 20.7)
Number of correct alternatives: 1
New fuels need a pre bunkering Coq meaning it has already been tested and found compliant so there is
no need for bunker samples
Directly from the fuel tank
All bunker samples will be supplied
by the bunker barge
On the receiving vessel's inlet bunker manifold
Question:
Who is required to cross check and verify that all information required is specified in the BDN? (Ref S.I 20 20.19)
Number of correct alternatives: 1
Master and Chief Engineer
Responsibility of the bunker barge
Ship to send and wait for Operations
to verify compliance
Only attending bunkering superintendent
Question:
How much HSFO ROB can remain in a tank that is ready to bunker compliant fuel oil? (Ref PowerPoint)
Number of correct alternatives: 1
Up to 5 m³ if chemical cleaning
agents will be used
0.5 m³
0.3% of the quantity to be loaded
Tanks need to be fully clean (zero ROB)
Question:
What is the unit of measurement that sulphur emissions are tested by? (Ref S.I 20b 2.1)
Number of correct alternatives: 1
% m/m (percentage mass by mass)
SO2 (ppm) / CO2 (% v/v) (SO2/CO2 ratio method)
Nox ppm
SO2 (ppm)
Question:
When Should you enter a record of revision in the SIP?
Number of correct alternatives: 1
If PSC come and inspect the SIP and tells you to change a part of it.
When a change / regulation to the plan is implemented
Upon Masters orders.
Never once the SIP is in force no changes are to be made.
Download
36.5 Kb.
Share with your friends:
1
...
5
6
7
8
9
10
11
12
13
The database is protected by copyright ©ininet.org 2024
send message
Main page
maximum amount