56 To reliably compute
HR index, we developed
a strict protocol to measure Hcrew and
Htotal. To compute
Hcrewwe observed the total number of hazards identified and communicated by the crew during the pre-task safety meetings prior to the commencement of work. Two site-specific safety managers with at least 12 years of relevant experience and familiarity with the tasks performed also observed meetings and validated measures. For
Htotal we measured the total number of identifiable hazards to which the workers were exposed during the work period. This was defined as all identifiable hazards that were identified
by the safety managers, researchers and workers before, during and after the completion of each work period. After
observing each work period,
Htotal was computed based on consensus within the researchers and the site leadership to ensure validity and reliability. Also, to preserve consistency, a catalogue of hazards was developed from historical hazard assessments which was later refined for each work period. Although it was highly unlikely that the panel would identify all hazard-
signals through observations, the rigorous protocol was maintained for consistency. Each work period generally consisted of four-hour before and after lunch, and the study was conducted overwork periods for each crew (48 work periods per project.
Share with your friends: