Currently, the German HeERO team does not include a MNO. We are in discussions with Vodafone D2. This MNO operates a test centre with a completely separated mobile network, which allows testing the eCall flag and also real 112 eCalls. This questionnaire was processed without Vodafone’s help, so many parts are still unclear at this time.
2
Analysis of existing telecommunication infrastructure. General information on mobile network:
N/A
unknown
unknown
unknown
unknown
yes
yes
Not implemented yet
no
yes
unknown
unknown
3
Identification of hardware and software needs:
N/A
N/A
N/A
4
Identification of required modification on existing infrastructure* . N/A
* if live network differs from test network, please provide answers for both cases.
Analysis of existing telecommunication infrastructure. General information on mobile network:
N/A
14
Nokia
HW - DX200, SW – M14
Mixture of stand-alone and integrated MSCs.
Currently Telefónica O2 operates PSAP network for reception and handling of 112 calls in all Czech Republic.
Emergency calls are routed to the appropriate PSAP based on caller location (origin dependent routing); network routing number is used to ensure proper routing to the nearest PSAP.
Currently in preparation phase under HeERO project.
Yes
Yes - Testing MSC/MGW/HLRand testing PSAP availability as well.
Testlab (Testing RNC/BSC)
HW - DX200, SW – M14
3
Identification of hardware and software needs:
Yes
Yes
N/A
4
Identification of required modification on existing infrastructure:
Setting of fixed and mobile network for needs of Ecall configuration (eCall Flag, special Network Routing Numbers).
N/A
N/A
N/A
10 working days
N/A
N/A
5
Implementation plan
In accordance with HeERO project - A) Analysis and design phase B) implementation phase: a) network adaptation (eCall flag based routing) and b) testing PSAP upgrade (PSAP data modem, MSD visualization)
6 month for setting up complete eCall test environment (IVS – mobile network . testing PSAP).
1 month
No fundamental differences.
Due to eCall flag we are able to route eCall via special network routing numbers either to production or testing PSAP.
1 month
Only for testing in Testlab.
6
Prerequisites and assumptions:
For correct testing we have to have the equipment for testing/simulation of Ecall for both cases-"Manually initiated eCalls" (MieC) and "Automatic initiated eCalls" (AieC).
Table : MNO – Czech Republic
5.2.4Sweden MNO report
5.2.4.1TeliaSonera
Q
Report
1
General information on Mobile Network Operator :
TeliaSonera
Sweden
Provide mobile communications network with eCall functionality for HeERO trial
2
Analysis of existing telecommunication infrastructure. General information on mobile network :
Mobile network generation which will be utilized in pilot: GSM and 3G
6
Ericsson
Ericsson can provide these answers, current SW release 13.8, will be updated during spring to release 14.1 or even higher releases
Co-located
Yes
Yes
None
Yes
No
N/A
N/A
3
Identification of hardware and software needs* N/A
* list of current version of eCall standards is provided in Annex1 of this document
4
Identification of required modification on existing infrastructure* N/A
* if live network differs from test network, please provide answers for both cases.
Vendor of equipment stated that this data will be ready for WP2.3 Implementation. No issues expected.
To be determined by the HW vendor.
To be determined by the SW vendor.
To be determined by the HW/SW vendor
4
Vendor of equipment stated that this data will be ready for WP2.3 Implementation. No issues expected: N/A
* if live network differs from test network, please provide answers for both cases.
5
Vendor of equipment stated that this data will be ready for WP2.3 Implementation. No issues expected.
Successful and complete testing at vendor test plant is prerequisite for testing at our referent system. Both testing procedures are prerequisite for implementation in the live network.
This particular estimation should be provided by the HW/SW vendor.
1 week
Minor
Yes
1 week, in Q3/2011, after “network freeze” period
Domestic and roaming partner SIMs can be provided by Vipnet.
6
Prerequisites and assumptions
No activities in the live network during the summer network freeze (May-September 2011)
Table : MNO – Croatia, Vipnet
5.2.5.2Tele2 d.o.o.
Q
Report
1
General information on Mobile Network Operator :
Tele2 d.o.o.
Croatia
N/A
2
Analysis of existing telecommunication infrastructure. General information on mobile network :
Vendor of equipment stated that this data will be ready for WP2.3 Implementation. No issues expected.
For all these questions this in Part , please refer to vendor of equipment. Vendor of equipment stated that this data will be ready for WP2.3 Implementation. No issues expected.
No
No
Yes
4
Vendor of equipment stated that this data will be ready for WP2.3 Implementation. No issues expected: N/A
* if live network differs from test network, please provide answers for both cases.
5
Vendor of equipment stated that this data will be ready for WP2.3 Implementation. No issues expected.
As previously agreed, Tele2’s position and role in eCall pilot project is mainly to provide SIM cards and assist in testing. Implementation obligation is on Ericsson side.
Important prerequisite at this point, same as previously stated, is that eCall pilot project will not raise any cost at Tele2 side.