PTW Assessment Preparation


1

Done by:
P.H. Muath Alaadi

PTW

Assessment

Preparation



2

The interview is mainly about FIVE
TYPES of questions which

YOU MUST FOCUS

on them:




PTW Theory
Permit’s Scenario
Emergence Response
TRIC Card
English Skills









3

Type 1: PTW Theory
A- Permit Holder SHOULD have Knowledge about
these points:

Definition of PTW System
Roles & Responsibility of PH/PA/AA/RS
Permit Types & Selection Criteria
Life cycle of Permit
Attachments with Permits
Area Classifications (Process/HC/Critical Sour/Non-HC)
Hazardous Area Classification (Zones)
𝑯
𝟐
𝑺
Facility Classifications (Sweet/Sour/Critical Sour)
Requirement for each (Sweet/Sour/Critical Sour)
EPZ-Emergency Planning Zone
Worksite Examination by AA
Briefing/Discussion of the Works between
PA & RS

PA & PH

PH & AA

Job HSE Plan
TBT, TRIC & DRA
NORM
Confined Space
Gas Testing requirements
Isolation
The PTW Tracking
Communication Ability
Cold Cutting
Vehicle Entry
Permit Change Over
Reasons for Suspension
Reasons for Cancelation
MOPO
HEMP & HRA
Other Affected Custodian
Lifting Procedure


4

B-
The Questions
1-
introduce yourself?

About your Name, Place, Qualification, Experience, etc.
2- What is your understanding about PTW System
A Permit to Work (PTW) system determines how a job can be carried out safely and is a control to ensure all risks have been minimized. Compliance with a suitable and sufficient PTW will ensure safety. A PTW system authorizes specific people to conduct specific work at a specific time and location. It ensures proper planning of the work and that risks are adequately managed by formalizing the required controls. It ensures communication between site management, supervisors, operators and the work crew and is required for all work identified as being hazardous or potentially hazardous. It is a legal requirement under Omani Law - Ministerial Decision 286/ (2008). Violation of the procedure will lead to legal consequences
3- How the communication happens
The permit is a link point, and it passes over more than one person, so more than one person knows it.
4- What is the legal
It is a legal requirement under Omani Law Based on 286/2008 ministry decision. If I follow the rules and procedures and something go wrong it will save me, otherwise it will punch me
5- Why we are taking the permit
To make a sure that all non-routine hazardous activities can be work in a safe manner & also it is Legal document you should keep it with you for all time
6- Who is permit holder
A person has a valid and authorized PTW license
7- Why Permit is required
Permit required to protect People Environment, Asset and the Reputation of company.