Department of agricultural and rural development



Download 3.76 Mb.
Page4/10
Date02.06.2018
Size3.76 Mb.
#53009
1   2   3   4   5   6   7   8   9   10


Figure 1.9: Current status of the beginning point of service road



Figure 1.10: Current status of the end point of service road




Figure 1.11: Location of borrow pit (taken from satellite)



Figure 1.12: current status of material storage area (area no. 1)



Figure 1.13: Current status of the expected location of campsite area




Download 3.76 Mb.

Share with your friends:
1   2   3   4   5   6   7   8   9   10




The database is protected by copyright ©ininet.org 2024
send message

    Main page