Misgund bulk water supply scheme regional bulk infrastructure grant


MISGUND BULK WATER SUPPLY AUGMENTATION – TECHNICAL FEASIBILITY REPORT



Download 0.59 Mb.
Page5/5
Date23.04.2018
Size0.59 Mb.
#46483
1   2   3   4   5

MISGUND BULK WATER SUPPLY AUGMENTATION – TECHNICAL FEASIBILITY REPORT


Aurecon Report: 8852

Date: 30 April 2014

Revision: 1











PREPARED BY:

SUBMITTED TO:

Name: Johan van der Mescht

Aurecon Port Elizabeth

Tel : 041 503 3900

Email:johan.vandermescht@aurecongroup.com



Name: Simon Mqamelo

Amatola Water

Tel: 043 707 3700

Email: smqamelo@amatolawater.co.za

























































































































































































































































































































































































































































































































































































































































































































































































Download 0.59 Mb.

Share with your friends:
1   2   3   4   5




The database is protected by copyright ©ininet.org 2024
send message

    Main page