Misgund bulk water supply scheme regional bulk infrastructure grant



Download 0.59 Mb.
Page1/5
Date23.04.2018
Size0.59 Mb.
#46483
  1   2   3   4   5






FEASIBILITY STUDY

MISGUND BULK WATER SUPPLY SCHEME
REGIONAL BULK INFRASTRUCTURE GRANT
REPORT REV 01
30 APRIL 2014




Document Control

Project Number




Contract Number




Project Name

Misgund Bulk Water Supply

Report Title

RBIG Feasibility Report

Author(s)

Simon Mqamelo

Status of Report

Draft

Date

25 February 2014

Previous Report(s)

24 May 2013

Date(s)







Approved for Amatola Water by:

C Thompson Date

Divisional Director: Planning & Development



Simon Mqamelo Date

Manager: Infrastructure Planning & Development






Approved for Department of Water Affairs by:

A Gidana Date

Regional Manager: RBIG







Download 0.59 Mb.

Share with your friends:
  1   2   3   4   5




The database is protected by copyright ©ininet.org 2024
send message

    Main page