Performance work statement



Download 0.99 Mb.
Page1/24
Date02.02.2017
Size0.99 Mb.
#15756
  1   2   3   4   5   6   7   8   9   ...   24


PERFORMANCE WORK STATEMENT
for
CONTRACTOR LOGISTICS SUPPORT (CLS)
of
C-12 AIRCRAFT

12 November 2010

SECTION ONE: OVERVIEW 4

1.1 System and Mission Description 4

1.2Purpose 4

1.3 Support Concept and Scope 4

1.4 Readiness Requirements 5

1.5 Specification and Order of Precedence 5

1.6 Access to OEM Proprietary Data 5

2.1 Definitions 6

3.1 Acronyms 12

SECTION FOUR: MAINTENANCE and PROGRAM SUPPORT 17

4.1 Purpose and Scope 17

4.2 Mission Readiness Requirements 17

4.3 Management Information System (MIS), Data Collection, Documentation and Reporting Requirements 18

4.4 Site Operations. 19

4.5 Aircraft Maintenance 21

4.6 Functional Check Flights (FCF) 22

4.7 Aircraft Flight and Ground Operations. 22

4.8 Engineering 22

4.9 Quality Assurance (QA)/Control, Safety and HAZMAT 23

4.10 Configuration Management. 25

4.11 Technical Data 25

4.12 Support Equipment (SE). 26

4.13 Aviation Life Support (Aircrew) Systems (ALSS) and Survival Equipment. 26

4.14 Packaging, Handling, Storage and Transportation (PHS&T). 27

4.15 Personnel – Requirements and Qualifications 27

4.16 Government Meetings and Conferences 29

SECTION FIVE: OVER AND ABOVE MAINTENANCE and REPAIR 30

5.1 General 30

5.2 Notifications, Evaluation and Repair Authorization 30

5.3 Parts and Material 31

5.4 Crash Damages 31

SECTION SIX: AIRCRAFT CONDITION INSPECTION (ACI) & DEPOT REPAIR 32

6.1 Scope 32

6.2 Aircraft Movement Responsibilities. 32

6.3 Functional Check Flights 32

6.4 Depot Requirements. 32

6.5 Discrepancies 34

6.6 Aircraft Logs and Records 34

6.7 Stand-Alone Aircraft Painting 35



SECTION SEVEN: MATERIAL 37

7.0 General 37

7.1 Property Management and Control 37

7.2 Inventory Management 38

7.3 Replacement Parts and Component Repair / Refurbishment or Overhaul 38

7.4 Disposal of Excess Government Property 39

7.5 Diminishing Manufacturing Sources and Material Shortages (DMSMS). 39

7.6 Item Unique Identification (IUID) 40



SECTION EIGHT: SITE ACTIVATIONS, RELOCATIONS AND CHANGES 41

8.1 Site Survey Support for Site Activations/Deactivations, Relocations and Changes. 41



SECTION NINE: GOVERNMENT RESPONSIBILITIES 42

9.1 Purpose and Scope. 42

44

SECTION TEN: TRANSITION PHASES 44

10.1 Transition Phase-In. 44

10.2 Transition Phase-In Reporting. 44

10.3 Transition Phase-Out. 44

10.4 Transition Phase-Out Reporting. 45

10.5 Reserved 45

10.6 Logistics Support and Data 45

10.7 Uninterrupted Service 45

10.8 Contact and Release of Personnel 46

10.9 Records, Equipment and Data Transfer 46

10.10 Inventory 46

10.11 Communication with OSGR 46



SECTION ELEVEN: PROPELLERS 47

11.1 Propeller Maintenance, Repair and Overhaul 47



SECTION TWELVE: ENGINE SUPPORT 48

12.1 Purpose and Scope. 48

12.2 Engine Maintenance and Repairs. 48

12.3 Engine Overhaul and Replacement. 49

12.4 Documentation. 50

ANNEX A – NAVY-UNIQUE REQUIREMENTS 1

ANNEX B – NAVY TC-12-UNIQUE REQUIREMENTS 1

ANNEX C – AIR FORCE UNIQUE REQUIREMENTS 1


­­­­__________________­­­­­­­­­­­________________


­­Appendix A

Appendix B

Appendix C
Appendix D1

Appendix D2

Appendix E

Appendix F1

Appendix F2, 3 & 4

Appendix G1

Appendix G2

Appendix G3

Appendix H

Appendix I

Appendix J

Appendix K1

Appendix K2

Appendix L1

Appendix L2

Appendix M


(Navy) Aircraft Locations

(Navy) Survival Equipment List

(Navy) (Navy) Ordnance and Aircraft Survivability Equipment (ASE)Ammunition and Explosives (AE)

(Navy) Government Furnished Material (GFM)

(USAF) Government Furnished Property (GFP)

Safety, Fire Protection and Health Specification

(Navy) Mission Essential Subsystems Matrix (MESM)

(USAF) Mission Essential Subsystems Lists (MESL)

(Navy) Government Property Inventory

(Navy) Government Furnished Property (Office Equipment)



(Navy) Government Furnished Inventory (C-12W)

(Navy) Corrosion Control

(Navy & USAF) Aircraft Interior/Exterior Specifications

Reserved


(Navy) Aircraft Condition Inspection (ACI) Specification, Class I

(USAF) Aircraft Condition Inspection (ACI) Specification

(Navy) Quality Assurance (QA) Semi-Annual Inspection Checklist (USAF) Quality Assurance (QA) Semi-Annual Inspection Checklist

(Navy) List of Maintenance Engineering Directives (MEDs)










Exhibit A (Navy) CDRLs (Contract Section J)

Exhibit B-1 (Navy) Baseline Support Matrix and Price Adjustment Matrix

Exhibit C-1 (Navy) Excess Flight Hours



Exhibit C-2 Annual Cost Reporting Requirements Report

Exhibit C-3 Definitions of the Work Breakdown Structure identified in Exhibit C-2

SECTION ONE: OVERVIEW




Download 0.99 Mb.

Share with your friends:
  1   2   3   4   5   6   7   8   9   ...   24




The database is protected by copyright ©ininet.org 2024
send message

    Main page