ATTACTMENT 1
STATEMENT OF WORK
for
Intermediate Level
Test Program Sets (TPS)/
Operational Test Program Sets (OTPSs)
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
TABLE OF CONTENTS
Section Title
-
SCOPE
-
APPLICABLE DOCUMENTS
-
Government Documents
-
Non-Government Documents & other pubs
-
REQUIREMENTS
-
General
-
Program Management
-
Contractors Progress, Status, and Management Report
-
Program Management Reviews
-
Post Award Review (PAR)
-
Quarterly Program Reviews (QPRs) and Technical Interchange Meetings (TIM)
-
Cost Reporting
-
Design and Development
-
Engineering Support Data (ESD)
-
Test Program Set Documentation (TPSD)
-
Computer Products
-
Technical Data Package (TDP)
-
Tools
3.3.5.1 Software Tools
3.3.5.2 Product/Software Tool List
-
Specialty Programs
-
Reliability Program
-
Maintainability Program
-
Safety
-
Quality Assurance (QA)
-
Configuration Management (CM)
-
OPSEC Security Plan
-
Integrated Logistics Support (ILS)
-
ILS Management
-
Supportability Analysis
-
Automated Supportability Analysis Documentation
-
Maintenance Planning
-
Repair Analysis
-
Supply Support
-
Support Equipment Recommendation Data (SERD)
-
OTPS / OTPS Element SERDs
-
Support Equipment SERDs
-
Support Equipment Selection Criteria
-
Parts Control
-
Approved Parts
-
Unapproved Parts
-
Review Approval of Unapproved Parts
-
OTPH Nomenclature, Serial Number, and Signature Resistor
-
Technical Manual (TM)
-
Maintenance Plan (MP)
-
Interim Support Item List (ISIL)
-
Logistics Guidance Conferences
-
Supportability Analysis Guidance Conference
-
Provisioning Guidance Conference
-
Technical Manual (TM) Guidance Conference
-
SERD Guidance Conference
3.5.14 OTPH Work Unit Code (WUC)/Type Equipment Code (TEC)
3.5.14.1 OTPH Work Unit Code (WUC)
3.5.14.2 Type Equipment Code (TEC)
-
Engineering and Logistic Reviews
-
Preliminary Design Review (PDR)
-
Critical Design Review (CDR)
-
Integration
-
Integration Logbook
-
Integration Fault Insertion
-
Integration Process
-
Test Readiness Review (TRR)
-
Acceptance Testing
-
Pilot Production Acceptance Test (PPAT)
-
PPAT Report
-
Government Testing
-
Fleet Introduction
-
Production
-
TPS Production
-
Production Acceptance Testing
-
Production Status Report
-
GFE Data and Maintenance
-
UUT Source Data
-
UUT Assets
-
UUT Maintenance and Repair
-
CASS Installation
-
CASS Maintenance and Repair
-
System Problem Reports (SPRs)
-
Off-Station Software
-
Automatic Test Program Generator (ATPG)
-
Electronic Data Interchange (EDI)
1.0Enclosures
1 - Integration Logbook Fault Insertion Record
2 - SOW/CDRL/DID Reference
3 - CASS OTPS SERD PREPARATION GUIDE
4 - Cost Reporting Example
1. SCOPE
This Statement of Work (SOW) defines the efforts for the program management, logistics, design, development, fabrication, inspection, production, and fielding for the Test Program Sets (TPS) developed for the Units Under Test (UUTs) listed in Attachment 1A. Those data items identified as (MANDATORY) are essential and shall not be deleted.
-
TAILORING ALTERNATIVE:
SELECT THE APPROPRIATE WORDS FOR THE PARAGRAPH BELOW
|
These TPSs will provide support for the (Aircraft or Weapon System). The TPSs shall be used at the (Intermediate or Depot or Intermediate and Depot) level.
These Operational Test program Sets (OTPSs) shall be capable of operation on the following Consolidated Automated Support System (CASS) Family members
-
TAILORING ALTERNATIVE:
CO-ORDINATE WITH CASS TPS APML BEFORE MAKING FINAL DECISION AND THEN DELETE THE ONES THAT DO NOT APPLY
|
|
CASS Block I
|
CASS Block II
|
CASS Block III
|
RTCASS
|
eCASS
|
HYBRID
|
X
|
X
|
X
|
X
|
TBD
|
RF
|
|
X
|
X
|
X
|
TBD
|
CNI
|
X
|
X
|
|
|
TBD
|
EO
|
|
X
|
|
|
TBD
|
High Power
|
|
X
|
|
X
|
TBD
|
-
TAILORING ALTERNATIVE:
ONE OF THE FOLLOWING PARAGRAPHS
MUST BE SELECTED
FOR CASS ONLY SELECT: a.
FOR CASS AND RTCASS SELECT: b.
|
a. The TPS shall be designed, developed, integrated and tested on the Consolidated Automated Support System (CASS).
b. The TPS shall be designed, developed, integrated and tested on the Consolidated Automated Support System (CASS). The TPS performance shall be limited to the performance of the Reconfigurable Transportable Consolidated Automated Support System (RTCASS).
The TPS Developer shall convert the CASS developed TPS’s (including Interface Device Self Test) for use on RTCASS using the RTCASS conversion toolset (GFI RFP section H3). An RTCASS station will be made available to a TPS developer at Saint Inigoes, Maryland so, the TPS developer can identify a timeframe to demonstrate each TPS end-to-end performance on RTCASS no later than the completion of FAT. Any failures identified on the RTCASS after a successful fault free demonstration of each TPS on CASS and processing through the RTCASS conversion process will be the responsibility of the TPS developer. Any failures identified during the execution of a TPS’s end-to-end performance on RTCASS shall be documented, passed to and be the responsibility of PMA260D2.