Department of transportation


Project Concept Report page



Download 0.99 Mb.
Page11/21
Date17.08.2017
Size0.99 Mb.
#33939
1   ...   7   8   9   10   11   12   13   14   ...   21

Project Concept Report page _____

Project Number:


P. I. Number:

County:


SCORING RESULTS AS PER TOPPS 2440-2


Project Number:

County:

PI No.:













Report Date:

Concept By:




DOT Office:

CONCEPT







Consultant:




Project Type:

Choose One From Each Column



 Major

Minor


 Urban

 Rural


 ATMS

 Bridge


 Building

 Interchange

 Intersection

 Interstate

 New Location

Widening & Reconstruction

 Miscellaneous





FOCUS AREAS

SCORE

RESULTS

Presentation





Judgement





Environmental





Right-of-Way






Utility





Constructability





Schedule





Revised Project Concept Report Transmittal Letter


DEPARTMENT OF TRANSPORTATION

STATE OF GEORGIA

__________
INTERDEPARTMENT CORRESPONDENCE
FILE Project Number and County OFFICE

P. I. Number DATE

FROM: Office Head

TO: Assistant Director of Preconstruction

SUBJECT Revised Project Concept Report

Attached is the original copy of the Revised Concept Report for your further handling for approval in accordance with the Plan Development Process (PDP).
Provide a brief description of the significant changes in the concept and the reasons for the changes.
The revised concept as presented herein and submitted for approval is consistent with that which is included in the Regional Transportation Program (RTP) and/or the State Transportation Improvement Program (STIP).
DATE__________ _______________________________________

State Transportation Planning Administrator



Distribution:

  • For those concepts prepared in the District:

Project Review Engineer

State Environment/Location Engineer

State Traffic Safety and Design Engineer

State Transportation Planning Administrator

State Transportation Financial Management Administrator

State Bridge Design Engineer (only for those projects that involve structures)


  • For those concepts prepared at Environment/Location:

Project Review Engineer

State Traffic Safety and Design Engineer

State Transportation Planning Administrator

State Transportation Financial Management Administrator

State Road and Airport Design Engineer or State Urban Design Engineer

District Engineer

State Bridge Design Engineer (only for those projects that involve structures)


  • For those concepts prepared in Office of Road Design, Office of Urban Design, Office of Program Delivery and Consultant Design, or Office of Traffic Safety and Design:

Project Review Engineer

State Environment/Location Engineer

State Traffic Safety and Design Engineer

State Transportation Planning Administrator

State Transportation Financial Management Administrator

District Engineer

State Bridge Design Engineer (only for those projects that involve structures)
Example of Revised Concept Report
REVISED PROJECT CONCEPT REPORT



Need and Purpose: As provided by the Office of Planning or the Office of Environment/Location
Project location: Includes the proposed length of the project, beginning and ending mile logs for each county segment, and a general location of the project including any city and county limits or proximity there to.
Description of the approved concept:
PDP Classification: Major_______ Minor__________
Federal Oversight: Full Oversight ( ), Exempt( ), State Funded( ), or Other ( )
Functional Classification:
U. S. Route Number(s): State Route Number(s):

Traffic (AADT) as shown in the approved concept:

Current Year: ________________ Design Year: __________________


Proposed features to be revised: Describe the feature or features of the approved project concept to be revised and the reasons for the revision. Use the description contained in the most recent Concept Report or revised Concept Report. This paragraph will describe one or more of the following items:

  • Typical section,

  • Project termini,

  • Changes in right-of-way limits which may affect the analyses of:

    • Historic resources,

    • Endangered species,

    • Air quality, or

    • Noise studies,

  • Revised alignment (from a widening project to new location project or vice versa, at-grade intersection to grade separation, etc), or

  • Access control, or

  • Controlling criteria.


Describe the revised feature(s) to be approved: Describe the revised feature(s). Revised Concept Reports will only be submitted for the six items listed above. If the project termini are revised, new milepost beginning and/or ending points will be provided.
Updated traffic data (AADT):

Current Year: ________________ Design Year: _____________



Programmed/Schedule:

P.E. _____________ R/W: ____________ Construction: ____________


VE Study Required Yes( ) No( )
Revised cost estimates:

  1. Construction cost including inflation and E&C,

  2. Right-of-Way, and

  3. Utilities


Is the project located in a Non-attainment area? Yes No. If yes, provide a comparison between the proposed project concept and the conforming plan’s model description. Include such features as project limits, number of through lanes, proposed open to traffic year, etc.
Recommendation: Recommend that the proposed revision to the concept be approved for implementation.
Attachments:

  1. Sketch Map,

  2. Cost Estimate,

  3. Conforming plan’s network schematics showing thru lanes, (Note: This attachment is required for non-attainment areas only.), and

  4. Other supporting documents.




Concur: ______________________________________________

Director of Preconstruction


Approve: _______________________________________________

Chief Engineer


Or


  • Full Oversight Projects

If the project has full Federal oversight, the signature blocks should include the following:
Concur: ______________________________________________

Director of Preconstruction


Approve: ______________________________________________

Division Administrator, FHWA


Approve: _______________________________________________

Chief Engineer

APPENDIX D

Final Alternate Selection Report Example
DEPARTMENT OF TRANSPORTATION

STATE OF GEORGIA

__________




Download 0.99 Mb.

Share with your friends:
1   ...   7   8   9   10   11   12   13   14   ...   21




The database is protected by copyright ©ininet.org 2024
send message

    Main page