Proposed position


Name of assignment or project



Download 98.38 Kb.
Page39/76
Date04.03.2021
Size98.38 Kb.
#55993
1   ...   35   36   37   38   39   40   41   42   ...   76
Sam's CV (current as of Aug 2019) Envi Only
Name of assignment or project: World Bank: Environmental and Safety Monitoring as part of the CONSTRUCTION SUPERVISION FOR REST PART (112 KM) OF ALAT-MASSALI ROAD, EXISTING CONNECTING ROADS IN PROJECT AREA, TAGIYEV-SAHIL ROAD AND 200 KM LENGTH OF LOCAL ROADS

Year: 2010-2014 (Intermittent and Continuing)

Location: Azerbaijan

Client: WB-IBRD / Kocks Consult GmbH

Main project features: Monitoring of the (1) ALAT-MASSALI ROAD, (2) EXISTING CONNECTING ROADS IN PROJECT AREA, (3) TAGIYEV-SAHIL ROAD AND (4) 200 KM LENGTH OF LOCAL ROADS which entailed undertaking environmental monitoring and carrying out environmental management, monitoring and training activities as detailed in the Environmental Protection Report (also referred to as the IEE) of the project and incorporating the findings and supporting data in the quarterly progress reports as well as the final completion reports.

Position held: International Lead Consultant for Road Transport civil-infrastructure environment and safety


Download 98.38 Kb.

Share with your friends:
1   ...   35   36   37   38   39   40   41   42   ...   76




The database is protected by copyright ©ininet.org 2024
send message

    Main page